153
|
Wednesday, April 26, 2023, 11:19 |
Adam Newsome | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door has been closed and
seal inflated. The operation was performed
with no issue. |
|
167
|
Friday, February 09, 2024, 15:43 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation - 2024 | The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4. |
|
170
|
Friday, April 19, 2024, 15:18 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation - 2024 | The lid down operation
took place on April 19, 2024. |
|
171
|
Wednesday, April 24, 2024, 14:26 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (second) - 2024 | Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown. |
|
172
|
Tuesday, April 30, 2024, 15:00 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation (second) - 2024 | A second lid down
operation took place on April 30, 2024. |
|
173
|
Thursday, May 02, 2024, 12:42 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (third) - 2024 | The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and finishing at ~12:12pm
under work permit C2024-05-02-5. |
|
174
|
Tuesday, May 07, 2024, 09:35 |
Adam Newsome | Elevation Jack | Standard Operation | Lid down operation (third) - 2024 | A third lid down
operation took place over May 6-7, 2024. |
|
185
|
Wednesday, July 17, 2024, 15:02 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround for July 2024 was completed
for the B1 and B2 levels by A. Newsome, and
for the main shop and back shop by R. Sykes. |
|
187
|
Wednesday, July 24, 2024, 11:39 |
Adam Newsome | Cyclotron | Standard Operation | Investigation of faulty Al-ALCW signal | Fault 16710 was initially assigned
to Remote Handling: |
|
190
|
Thursday, October 10, 2024, 12:30 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be |
|
192
|
Friday, January 03, 2025, 10:20 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building B1 and B2 Level | A safety walkaround was completed for the
RH building B1 and B2 levels.
The resulting spreadsheet can be |
|
193
|
Monday, January 06, 2025, 13:57 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building Shop and Back Shop | A safety walkaround was completed for the
RH building shop and back shop.
The resulting spreadsheet can be |
|
1
|
Monday, June 27, 2011, 10:38 |
John Wong | General | Routine | Testing RH elog | |
|
2
|
Tuesday, February 07, 2012, 18:09 |
Grant Minor | Service Bridge | Repair | Service Bridge Center Post Bearing Maintenance and Orbit Counter (2011/2012) | Repair
of Orbit Limit Switch Plastic Belt
During |
|
4
|
Friday, February 17, 2012, 15:07 |
Don Jackson | Trolley | Repair | Video Trolley Failed in Cyclotron Tank | All control to the video trolley was lost
during remote photographing of components
in the cyclotron. The control system and |
|
9
|
Monday, February 04, 2013, 13:52 |
Grant Minor | Service Bridge | Repair | Hydraulic cylinder failure on service bridge | The hydraulic cylinder on the West side
of the service bridge (used to raise the
bridge for insertion into the Cyclotron) |
6x |
13
|
Wednesday, February 13, 2013, 08:55 |
maicodallavalle | Service Bridge | Repair | Service Bridge/Carrier Hydraulic Jacks | On Monday February 4TH the Service
Bridge was being lifted into the Cyclotron
with the Carrier. It was noticed that one |
|
16
|
Friday, March 08, 2013, 18:42 |
Grant Minor | Cyclotron | Repair | Tank lid not at upper limit and resulting effects | This morning during routine service bridge
work in the Cyclotron tank, it was observed
by Travis Cave that the cable tray for the |
|
17
|
Monday, March 11, 2013, 19:43 |
Grant Minor | Cyclotron | Repair | Adjustment of tank lid upper limit by 1/4" upwards | This morning Don Jackson commented to Grant
Minor that he believed the tank lid was still
not raised high enough to safely operate |
|
18
|
Thursday, March 14, 2013, 19:57 |
Grant Minor | Cyclotron | Repair | Tank lid upper / over travel limit check | Today Grant Minor, Dan Wright, Arthur Leung,
and Dan Louie checked the height difference
between the tank lid upper travel limit switch |
|