ID Date Author Category Typedown Subject Text Attachments
  67   Thursday, April 02, 2015, 12:09 Dan McDonaldCyclotronStandard OperationLid Down operations April, 2, 2015Lid down Start at 11:17, lid went down
without any issues or stop's. Lid finish
at 11:45 
  
  71   Wednesday, September 30, 2015, 11:26 Isaac EarleElevation JackStandard OperationStation 9 Jack Right Side - Unusual Wear InvestigationThe following people were consulted
regarding the unusal wear noticed on jack
station #9 right side
 7x 
  72   Wednesday, September 30, 2015, 11:52 Isaac EarleElevation JackStandard OperationStation 9 Jack Left Side - Inspection & Service StatusThe left side jack was disassembled and
cleaned.  It was discovered that the
left side had been rebuilt with a new jack
 15x 
  73   Tuesday, October 27, 2015, 07:50 maicodallavalleElevation JackStandard OperationService to Station # 9 Right side Station #9 Cleaning of  discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side
 9x 
  74   Tuesday, January 05, 2016, 09:58 Travis CaveCyclotronStandard OperationOpened the shield doorThe shield door on the B2 level has been
opened.
  
  77   Wednesday, February 03, 2016, 08:16 Dan McDonaldCyclotronStandard OperationCyclotron lid up Lid up procedure Started at  12:00pm.
Initial numbers. # 1-47,2-49,3-45,4-47,5-47,6-47,7-49,8-45,9-50,10-50,11-51,12-49.
After a number of unsuccessful attempts at
 lid_up_2016.pdf 
  78   Friday, February 05, 2016, 14:55 Travis CaveShieldingStandard Operationshadow shieldsall 200, 400, 500, 600, and some 700 series
of shield are in.
  
  80   Tuesday, February 09, 2016, 14:48 Travis CaveCyclotronStandard Operationshadow shieldsAll shadow shields have been installed.
Ladders, the pothole covers and the second
rad survey will be done tomorrow.
  
  81   Wednesday, February 10, 2016, 14:53 Travis CaveCyclotronStandard Operationshadow shieldsAll cyclotron in tank work is completed.   
  82   Tuesday, February 16, 2016, 16:32 Isaac EarleCyclotronStandard OperationHE1 Probe Removed from CyclotronThe HE1 Probe was removed from the cyclotron
this morning following the procedure in Document-126165
(currently in draft status, to be released
  
  83   Friday, February 19, 2016, 10:17 Isaac EarleCyclotronStandard OperationHE1 Probe Installed in Cyclotron The HE1 Probe was reinstalled into
the cyclotron this morning following Section
3.2 in Document-126165 (to be reviewed and
  
  84   Thursday, February 25, 2016, 11:41 Travis CaveCyclotronStandard OperationEx 2C removalEx 2C has been removed from the cyclotron.
A trip into the tank was needed to free the
probe, hung up on the usual spot.
  
  85   Tuesday, March 01, 2016, 13:27 Travis CaveCyclotronStandard OperationEx 2C installEX 2C has been installed back into the
cyclotron.
  
  87   Tuesday, March 15, 2016, 13:56 Dan McDonaldCyclotronStandard OperationLid Down 2016Lid down Started at 12:15, station and
count numbers. Lid went down with out incident
as station 1 and 7 show the counters will
  
  88   Thursday, April 07, 2016, 11:04 Travis CaveCyclotronStandard OperationClosed the shield doorThe shield door on the B2 level of the
RH building has been closed.
  
  91   Tuesday, January 31, 2017, 14:41 Travis CaveCyclotronStandard OperationShield installation200, 400, 500, 600, and a pallet of 700
series of shield have been installed in the
cyclotron.
  
  93   Thursday, February 09, 2017, 15:21 Isaac EarleCyclotronStandard OperationHE2 Probe Removed The HE2 probe was
removed from the cyclotron today following
  
  94   Tuesday, February 21, 2017, 13:40 Isaac EarleCyclotronStandard OperationHE2 Probe Returned to Cyclotron The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165.  An orbital
  
  95   Tuesday, February 28, 2017, 15:45 Jason KapalkaCyclotronStandard Operation2C extraction probe removal and reinstallation2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service 
  
  96   Friday, March 03, 2017, 13:30 Jason KapalkaCyclotronStandard OperationCP continuity testPerformed continuity test at Cyclotron center
post with RH and Operations group members
using the service bridge, 
  