680
|
Wednesday, August 22, 2018, 15:20 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | | | Voltage Tests (Ta Target) | Wires reconfigured / set
Wednesday, August 22, 2018, 13:10:
Roughing. |
|
683
|
Friday, August 31, 2018, 12:27 |
Aaron Schmidt | nSiC#1 | LP-SIS | ITW | TM2 | 43044-1 | 42752-4 | In progress | Conditioning nSiC#1 | Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started. |
15x |
684
|
Wednesday, September 12, 2018, 11:19 |
Aaron Schmidt | Ta#57 | LP-SIS | ITE | TM4 | 41177-3 | 42752-6 | In progress | Conditioning Ta#57 | Wednesday, September 12, 2018, 11:06: Roughing.
Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: |
9x |
685
|
Monday, September 17, 2018, 11:52 |
Aaron Schmidt | UC#25 | LP-SIS | ITW | TM2 | | 42752-9 | In progress | Conditioning Heat Shield for UC#25 | Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd
Monday, September 17, 2018, 11:51: |
|
717
|
Monday, April 15, 2019, 14:42 |
Aaron Schmidt | | LP-SIS | | | | 42972-1 | Done | Conditioning UC#27 HS & test FS#3 | New coil lines installed for P2N testing
later.
Monday, April 15, 2019, 14:15: Roughing. |
|
718
|
Tuesday, April 23, 2019, 14:39 |
Aaron Schmidt | | LP-SIS | | | | 42752-8 | Done | Conditioning UC#28 HS | Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo
pumps started. |
|
719
|
Friday, April 26, 2019, 13:45 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | 42972-7 | In progress | Conditioning Ta#58 HS | Friday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo
pumps on. |
7x |
721
|
Tuesday, May 07, 2019, 13:16 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | | In progress | 9-pin connection configuration (Using Ta#58) | Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin |
|
722
|
Tuesday, May 14, 2019, 10:22 |
Aaron Schmidt | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | 42972-3 | In progress | Conditioning ZrC#8 HS | Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on. |
|
726
|
Monday, June 03, 2019, 11:35 |
Aaron Schmidt | | LP-SIS | | TM4 | 395530-3 | 42752-5 | Problems/Solutions | TGHT PS Failed. | Monday, June 03, 2019, 10:36: BIAS Near
55 kV, brought back down to 50 kV. Multiple
sparks. Optics tripped, wire scanners & |
|
758
|
Monday, September 23, 2019, 13:30 |
Aaron Schmidt | Ta#59 | LP-SIS | ITE | TM2 | 44062-5 | 42752-10 | In progress | Conditioning Ta#59 Assy | Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38:
Closed BV1A / Opened BV1 A & B to open |
9x |
760
|
Friday, September 27, 2019, 11:54 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-6 | | Conditioning UC#(29) HS | Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53:
Roughing. |
|
761
|
Wednesday, October 02, 2019, 13:42 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Conditioning UC#(30) HS | Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13:
Turbo Pumps started. |
|
769
|
Friday, November 01, 2019, 16:01 |
Fernando Maldonado | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Peek seal tests on UCx#30 HS | Friday, November 01, 2019, 15:47: A symbiotic
peek seal assembly was installed on
the manipulator grip to verify the temperature |
|
770
|
Friday, November 08, 2019, 14:21 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Nitrogen Bottle leak test | Friday, November 01, 2019, 14:00: Nitrogen
bottle installed. Purged waterlines HS /
FS#5. Purge done in conjunction with SiC#38 |
|
777
|
Tuesday, January 21, 2020, 09:38 |
Aaron Schmidt | SiC#40 | LP-SIS | | | 43044-8 | 43515-8 | In progress | Conditioning SiC#40 HS | Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: |
|
781
|
Thursday, January 30, 2020, 15:25 |
Aaron Schmidt | C(#1) | LP-SIS | | | 43044-8 | 43515-3 | In progress | Conditioning C(#1) HS | Was for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13: |
|
782
|
Friday, February 07, 2020, 14:02 |
Aaron Schmidt | C#(1) | LP-SIS | | | 43044-8 | 43515-3 | In progress | Conditioning C#(1) HS | Was for UC# 32* - Schedule change, now
for C#1* - Last HS conditioning revealed
a TGHT to HS lid short. Milled the lid back |
|
784
|
Wednesday, February 12, 2020, 11:04 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-1 | In progress | Conditioning HS | Using a broken LP-FEBIAD oven for out gassing.
Tentative UC#31*
Wednesday, February 12, 2020, 10:57: |
|
785
|
Thursday, February 20, 2020, 11:41 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Ta#60 w/ EE testing | Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04:
Roughing. |
|
|