Wednesday, August 22, 2018, 15:20, Aaron Schmidt, , LP-SIS, , , 41177-3, , , Voltage Tests (Ta Target)
|
Wires reconfigured / set
Wednesday, August 22, 2018, 13:10: Roughing.
Wednesday, August 22, 2018, 15:18: Turbo Pumps on.
Thursday, August 23, 2018, 08:16: RGA On.
Thursday, August 23, 2018, 08:39: Power on. Waterlines opened. No response on RGA, Vacuum ok @7.25e-06T
Monday, August 27, 2018, 09:50: Venting.
Monday, August 27, 2018, 10:59: Ta foil removed from one end plate. Roughing.
Monday, August 27, 2018, 11:29: Turbo pumps started.
Monday, August 27, 2018, 11:36: Ion gauge on. Both Turbo pumps at speed.
Tuesday, August 28, 2018, 08:27: Power on
Tuesday, August 28, 2018, 08:30: Waterlines opened. Vacuum ok @ 9.31e-07T. No response on RGA.
Wednesday, August 29, 2018, 11:34: Epics crashed. See added elog.
Friday, August 31, 2018, 10:07: Voltage tests are complete. Results to be uploaded later.
RGA crashed. Unable to re-connect. Manually turned it off.
Friday, August 31, 2018, 10:14: Ion gauge & turbo pumps off.
Friday, August 31, 2018, 11:27: Venting.
|
Friday, August 31, 2018, 12:27, Aaron Schmidt, nSiC#1, LP-SIS, ITW, TM2, 43044-1, 42752-4, In progress, Conditioning nSiC#1 15x
|
Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo pumps started.
Wednesday, September 05, 2018, 11:03: RGA on.
***NOTE***
P (kW) = A*V
TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)
Note: To condition the nanoSiC, it is better to keep TBHT at 0A and ramp up TGHT to 475A while monitoring the vacuum. Then step up TBHT; any increase in vacuum would indicate a local evaporation of nanoSiC close to the ionizer.
Settings as per John Wongs instructions and found in https://elog.triumf.ca/TIS/Evaporator_2/414
DO NOT EXCEED 400A
Thursday, September 06, 2018, 07:23: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T
Thursday, September 06, 2018, 07:25: Power/sources on.
Thursday, September 06, 2018, 07:30: Auto-ramping TGHT to 250 A @ 2A per min
Thursday, September 06, 2018, 07:38: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, September 06, 2018, 07:39: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.6 |
3.85 |
TBHT |
26.8 |
3.12 |
COIL + EE |
25.4 |
4.99 |
TGHT |
25.5 |
5.64 |
Thursday, September 06, 2018, 07:43: Optics set.
Thursday, September 06, 2018, 08:25: Vacuum @ 1.05e-06T. TGHT @ 105 A. Rate increments based on Vacuum. Minor out gassing.
Thursday, September 06, 2018, 08:51: Vacuum @ 9.13e-07T. TGHT @ 150 A. Rate increments back to 2A.
Thursday, September 06, 2018, 10:13: Vacuum @ 6.62e-07T. TGHT @ 250 A / 2.171 V.
Thursday, September 06, 2018, 11:11: Auto-ramping TGHT to 400 A @ 2A per min.
Thursday, September 06, 2018, 11:51: Vacuum @ 1.05e-06T. TGHT @ 315 A. Rate increments based on Vacuum. Minor out gassing.
Thursday, September 06, 2018, 13:44: Auto-ramping TGHT to 450 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 358 A. Rate increments based on Vacuum. Out gassing.
Thursday, September 06, 2018, 14:34: Auto-ramping TGHT to 400 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 383 A. Rate increments based on Vacuum. Out gassing.
Friday, September 07, 2018, 06:24: Auto-ramping TGHT to 450 A @ 2A per min. TGHT VOL @ 4.200 V
Friday, September 07, 2018, 06:50: TGHT @ 450 A. Vacuum @ 9.13e-07T. TGHT VOL @ 4.933 V
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.6 |
3.85 |
TBHT |
26.8 |
3.12 |
COIL + EE |
25.5 |
4.99 |
TGHT |
27.0 |
5.64 |
Friday, September 07, 2018, 06:55: Auto-ramping TBHT to 150 A @ 2A per min.
Friday, September 07, 2018, 08:12: TBHT @ 150 A. Vacuum @ 9.57e-07T. TGHT VOL @ 1.470 V
Friday, September 07, 2018, 08:15: Auto-ramping TBHT to 230 A @ 2A per min.
Friday, September 07, 2018, 09:55: TBHT @ 230 A. Vacuum @ 9.97e-07T. TGHT VOL @ 1.520 V
Friday, September 07, 2018, 11:00: EZL to 13.5 kV
Friday, September 07, 2018, 15:12: Auto-cooling @ 2 A per min.
Monday, September 10, 2018, 08:15: RGA off.
Monday, September 10, 2018, 08:20:BIAS / EZL / EE @ 0. Sources off.
Monday, September 10, 2018, 08:23: IV4 closed / reset. Ion gauge off. Turbo pumps off. |
Wednesday, September 12, 2018, 11:19, Aaron Schmidt, Ta#57, LP-SIS, ITE, TM4, 41177-3, 42752-6, In progress, Conditioning Ta#57 9x
|
Wednesday, September 12, 2018, 11:06: Roughing. Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: Turbo pumps started.
Wednesday, September 12, 2018, 12:40: Ion gauge on.
Thursday, September 13, 2018, 07:30: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T
Thursday, September 13, 2018, 07:33: Power/sources on.
Thursday, September 13, 2018, 07:37: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Thursday, September 13, 2018, 07:42: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, September 13, 2018, 07:43: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
4.02 |
TBHT |
24.4 |
3.10 |
COIL + EE |
24.4 |
5.13 |
TGHT |
24.6 |
5.77 |
Thursday, September 13, 2018, 07:44: Optics set.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
24.6 |
3.13 |
COIL + EE |
24.4 |
5.16 |
TGHT |
26.5 |
5.82 |
Thursday, September 13, 2018, 13:56: Vacuum @ 9.97e-07T.
Friday, September 14, 2018, 09:55:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
24.6 |
3.13 |
COIL + EE |
24.4 |
5.16 |
TGHT |
26.5 |
5.82 |
Friday, September 14, 2018, 09:55:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
3.99 |
TBHT |
24.6 |
3.11 |
COIL + EE |
24.6 |
5.12 |
TGHT |
26.5 |
5.83 |
Friday, September 14, 2018, 14:41: Auto-cooling @ 2 A per min.
Monday, September 17, 2018, 09:15: HV to 0. RGA off, IV4 closed & reset
Monday, September 17, 2018, 09:20: Sources off. Turbo pumps & Ion gauge off. Power off.
Monday, September 17, 2018, 09:23: Waterlines purged.
|
Monday, September 17, 2018, 11:52, Aaron Schmidt, UC#25, LP-SIS, ITW, TM2, , 42752-9, In progress, Conditioning Heat Shield for UC#25
|
Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd
Monday, September 17, 2018, 11:51: Roughing. Doors sealed
Monday, September 17, 2018, 12:30: Turbo pumps started.
Monday, September 17, 2018, 14:09: RGA on.
Tuesday, September 18, 2018, 09:01: Waterlines opened. No response on RGA. Vacuum ok @ 5.92e-07T.
Tuesday, September 18, 2018, 09:02: Power on
Tuesday, September 18, 2018, 09:05: Sources on.
Tuesday, September 18, 2018, 09:08: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.8 |
4.02 |
TBHT |
24.4 |
3.11 |
COIL + EE |
24.6 |
5.15 |
TGHT |
24.6 |
5.79 |
Wednesday, September 19, 2018, 08:14: Vacuum @ 7.73e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.8 |
4.02 |
TBHT |
24.7 |
3.10 |
COIL + EE |
24.9 |
5.13 |
TGHT |
26.8 |
5.77 |
Wednesday, September 19, 2018, 14:30: Auto-cooling @ 2A per min.
Friday, September 21, 2018, 07:52: Power / Sources off.
Friday, September 21, 2018, 07:53: RGA off. Ion Gauge off. Turbo pumps off.
Friday, September 21, 2018, 07:56: Waterlines purged. TS locked out.
|
Monday, April 15, 2019, 14:42, Aaron Schmidt, , LP-SIS, , , , 42972-1, Done, Conditioning UC#27 HS & test FS#3
|
New coil lines installed for P2N testing later.
Monday, April 15, 2019, 14:15: Roughing.
Monday, April 15, 2019, 14:49: Turbo pumps on.
Tuesday, April 16, 2019, 08:20: RGA on.
Gradually open each line. Wait 5 minutes & monitor the response.
Tuesday, April 16, 2019, 08:30: Open Return & Supply main valves.
Tuesday, April 16, 2019, 08:32: Open FS#5. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:37: Vacuum @ 4.37e-06T
Tuesday, April 16, 2019, 08:38: Open FS#4. Vacuum @ 4.37e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:43 Vacuum @ 4.29e-06T
Tuesday, April 16, 2019, 08:44 Open FS#3. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:49: Vacuum @ 4.26e-06T.
Tuesday, April 16, 2019, 08:50: Open FS#2. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:57: Vacuum @ 4.29e-06T.
Wednesday, April 17, 2019, 08:30: Power/sources on. Vacuum @ 2.46e-06T.
Wednesday, April 17, 2019, 10:30: Auto-ramping TGHT to 150 @ 2A per min. Vacuum limit increased to 3.000e-06T.
Wednesday, April 17, 2019, 11:53: Auto-ramping TGHT to 300 @ 2A per min. Vacuum @ 2.50e-06T.
Wednesday, April 17, 2019, 13:10: Auto-ramping TGHT to 350 @ 2A per min. Vacuum @ 2.95e-06T.
Thursday, April 18, 2019, 07:23: Auto-ramping TGHT to 575 @ 2A per min. Vacuum @ 2.40e-06T.
Tuesday, April 23, 2019, 06:45: Auto-Cooling TGHT @ 2A per min. Vacuum @ 9.22e-07T.
Tuesday, April 23, 2019, 08:29: RGA error. Shut off RGA.
Tuesday, April 23, 2019, 11:34: Power/sources off.
Tuesday, April 23, 2019, 11:37: IG1 off. Turbos off.
Tuesday, April 23, 2019, 12:53: Venting. |
Tuesday, April 23, 2019, 14:39, Aaron Schmidt, , LP-SIS, , , , 42752-8, Done, Conditioning UC#28 HS
|
Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo pumps started.
Tuesday, April 23, 2019, 15:18: Ion gauge on.
Wednesday, April 24, 2019, 07:33: RGA on.
Wednesday, April 24, 2019, 07:37: Waterlines opened. Vacuum ok @ 7.99e-07T. No response on RGA
Wednesday, April 24, 2019, 07:41: Power / sources on.
Wednesday, April 24, 2019, 07:43: Auto-ramping TGHT to 575 @ 2A per min. Vacuum limit remains at 3.000e-06T.
Thursday, April 25, 2019, 14:07: Auto-cooling @ 2 A per min.
Friday, April 26, 2019, 07:53: sources off.
Friday, April 26, 2019, 07:55: RGA off. Power off.
Friday, April 26, 2019, 07:57: Turbos off.
Friday, April 26, 2019, 08:00: HS waterlines purged. |
Friday, April 26, 2019, 13:45, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, In progress, Conditioning Ta#58 HS 7x
|
Friday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo pumps on.
Friday, April 26, 2019, 14:58: RGA on.
Monday, May 06, 2019, 07:05: RGA restarted.
Monday, May 06, 2019, 07:10: Waterlines opened. Vacuum ok @ 5.13e-07T. No response on the RGA.
Monday, May 06, 2019, 07:16: Power / sources on.
Monday, May 06, 2019, 07:20: Optics set.
Monday, May 06, 2019, 07:23: Auto-ramping TGHT / TBHT to 575 / 200 A @ 2A per min.
Monday, May 06, 2019, 07:28: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.
Monday, May 06, 2019, 07:39: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, May 06, 2019, 07:57: Reset DaqPro. Ref data sheet.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.8 |
5.52 |
TBHT |
25.7 |
7.93
|
COIL + EE |
25.6 |
1.92 |
TGHT |
25.70 |
6.29 |
Monday, May 06, 2019, 09:07: TBHT at 200A ok. Halt auto ramp. Set TBHT. Cont'd auto-ramping TGHT / TBHT to 575 / 230 A @ 2A per min.
Monday, May 06, 2019, 09:47: RGA restarted. Updates?
RGA timed out around 10:30.
Monday, May 06, 2019, 11:00: RGA error. Initial communications errors, would not connect. Restarted the computer and allowed updates to take effect. EM7 error displayed.
Monday, May 06, 2019, 11:27: RGA restarted.
Monday, May 06, 2019, 13:10: EZL to 14.3 kV
Monday, May 06, 2019, 14:48 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.4 |
7.78 |
TBHT |
27.0 |
10.30
|
COIL + EE |
26.8 |
3.01 |
TGHT |
27.1 |
7.09 |
Tuesday, May 07, 2019, 07:26: Noticed a discrepancy on the mass scan. The mass peaks appear to have moved further along the mass / q. They are identical to what we used to see on previous scans, just further down the line. A calibration / scaling may be appropriate.
Element |
Mass |
Mass/q |
Beam Current |
Lithium |
6.941 |
7.508 |
1.04401e-10 |
Sodium |
22.9897 |
27.556 |
9.85687e-10 |
Mass 27 (Al) |
26.9815 |
32.2943 |
2.97834e-08 |
Potassium |
39.0983 |
46.3293 |
7.49146e-10 |
|
(peak 2) |
47.6191 |
1.568e-10 |
Rubidium |
85.4678 |
100.355 |
2.79327e-10 |
|
(peak 2) |
102.904 |
1.04431e-10 |
Cesium |
132.9055 |
156.6 |
8.6103e-10 |
|
(peak 2) |
162.532 |
2.4408e-10 |
The discrepancy appears to get larger the further we move along the masses.
Tuesday, May 07, 2019, 07:39: Auto-cooling @ 2 A per min to TGHT / TBHT @ 350 / 0 A. Check around 9:20am.
Tuesday, May 07, 2019, 09:30: Auto-cooled to TGHT / TBHT @ 350 / 0 A.
Tuesday, May 07, 2019, 11:06: Auto-cooling @ 2A per min.
Tuesday, May 07, 2019, 11:09: Auto-cooling @ 4A per min.
Tuesday, May 07, 2019, 12:51: Power / sources off. IV4 closed / reset. RGA off.
Tuesday, May 07, 2019, 12:54: Turbo pumps off.
Tuesday, May 07, 2019, 14:00: Venting. |
Tuesday, May 07, 2019, 13:16, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, , In progress, 9-pin connection configuration (Using Ta#58)
|
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Pins connected source tray side: 1, 4, 5, 6
ST 9-pin HV rack
Pin to L TGHT - 1 - Black / COM / 5
Pin to R TGHT - 6 - Red / 9
Pin to L TBHT - 4 - Black / COM / 2
Pin to R TBHT - 5 - Red / 1
Tuesday, May 07, 2019, 15:20: Roughing.
Turbo pumps switched on w/ Ion gauge around 4pm.
Wednesday, May 08, 2019, 08:05: Multi-meters tested & connected.
Wednesday, May 08, 2019, 08:09: Power / sources on.
Wednesday, May 08, 2019, 08:13: RGA on
Wednesday, May 08, 2019, 08:14: Auto-ramping TGHT / TBHT to 575 (580) / 230 A @ 2A per min.
Wednesday, May 08, 2019, 08:30: Voltage reading off on TBHT? Connection to source tray side is wrong.
Wednesday, May 08, 2019, 08:40: Halt auto ramping. Manually tap down TBHT / TGHT
Wednesday, May 08, 2019, 08:42: Sources / RGA off.
Wednesday, May 08, 2019, 08:43: Turbo pumps off.
Wednesday, May 08, 2019, 10:40: Roughing.
Wednesday, May 08, 2019, 11:01: Turbo pumps on.
Wednesday, May 08, 2019, 13:10: Power / sources on. Vacuum @ 4.37e-06T
Wednesday, May 08, 2019, 13:19: Auto-ramping TGHT to 575 (580) A @ 2A per min. However, the vacuum is not quite ready. Increment value set to 3.000e-06T to ramp. Once the vacuum is reached, the heaters will start to ramp automatically.
Wednesday, May 08, 2019, 14:23: Auto-ramping ongoing successfully. TGHT @ 32A +. Vacuum @ 2.66e-06T
Thursday, May 09, 2019, 07:05: Auto-ramping TGHT to 575 (580) A @ 2A per min from 400 A.
Monday, May 13, 2019, 08:00: TSG:TP1A appears to have tripped over the weekend. (Around 7pm Saturday)
Closed IV4 / reset. Reset TP1A. Reset BV1A. Turn on TP1A.
Monday, May 13, 2019, 08:32: TBHT & TGHT switched back on.
Ramped down around 10 PM.
Tuesday, May 14, 2019, 07:10: Power / RGA off.
Tuesday, May 14, 2019, 07:12: IV4 closed, Ion gauge & turbo pumps off.
Tuesday, May 14, 2019, 08:35: Waterlines purged. Venting. |
Tuesday, May 14, 2019, 10:22, Aaron Schmidt, ZrC#8, LP-SIS, ITE, TM2, 43044-5, 42972-3, In progress, Conditioning ZrC#8 HS
|
Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo pumps on.
Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.
Wednesday, May 15, 2019, 08:42: Waterlines opened. Vacuum Ok @ 6.45e-07T. No response on RGA.
Wednesday, May 15, 2019, 08:58: Power / sources on.
Wednesday, May 15, 2019, 09:00: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Wednesday, May 15, 2019, 09:02: Optics set. IV4 open.
Wednesday, May 15, 2019, 09:09: BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV.
Wednesday, May 15, 2019, 09:10:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.34 |
5.24 |
TBHT |
26.28 |
8.23
|
COIL + EE |
26.11 |
2.18 |
TGHT |
26.21 |
6.44 |
Wednesday, May 15, 2019, 10:39: Abort auto-ramp. Significant out gassing note. Vacuum @3.12e-06T
TGHT / TBHT @ 77 A. Hold until stable again. Effect noted similar to ZrC#7 ( https://elog.triumf.ca/TIS/Test-Stand/450 ). Resume Auto ramp in 1 hour to TGHT / TBHT 350 / 150 A.
Wednesday, May 15, 2019, 11:54: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.
Wednesday, May 15, 2019, 14:47: TGHT / TBHT @ 146 / 146 A. Ramping to 350 / 150 A overnight.
Thursday, May 16, 2019, 07:30: Restarted RGA.
Thursday, May 16, 2019, 07:54: Mass scan taken albeit still ramping. TGHT / TBHT @ 280 / 150 A.
Thursday, May 16, 2019, 09:10: Ramping aborted @ TGHT / TBHT @ 285 (287.6) / 150 A. Allow for further out gassing.
Thursday, May 16, 2019, 13:22: Vacuum limit increased to 2.0e-06T. Vacuum @ 7.86E-07T.
Thursday, May 16, 2019, 13:23: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.
Tuesday, May 21, 2019, 07:03: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Tuesday, May 21, 2019, 12:30: TGHT Stopped at 557.2A. Readout at 578. Moved readout to 557. Readback @ 557.2A.
Wednesday, May 22, 2019, 07:09: TGHT was at voltage limit. The limit was increased. Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Wednesday, May 22, 2019, 07:32: TGHT 579.9 A / 8.051 V.
Wednesday, May 22, 2019, 13:45: Masscorr calibration confirmed.
Wednesday, May 22, 2019, 13:51: Auto-cooling @ 2A per min.
Thursday, May 23, 2019, 13:27: Sources / Power off. RGA off.
Thursday, May 23, 2019, 13:31: IV4 Closed. Turbo pumps off. |
Monday, June 03, 2019, 11:35, Aaron Schmidt, , LP-SIS, , TM4, 395530-3, 42752-5, Problems/Solutions, TGHT PS Failed.
|
Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.
Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.
PS model: Xantrex XPR 10-600
Message lights on the front of the power supply:
OTP - INT - OVP - SNS Triggered.
Front Panel Display, Status Annunciators
1. AC: The AC input is out of range and has
caused the output of
the supply to be
shut down (red)
2. OTP: The internal Over Temperature
Protection threshold has been exceeded,
disabling the supply output until the sensor
s cool to within the normal operating
temperature range (red)
3. INT: The external shutdo
wn line has been asserted, disabling the output of the
supply (green)
4. OVP: The output Over Voltage Prot
ection threshold have been exceeded,
latching the supply output off (red)
5. SNS: The remote sense line protection
circuit has been activated, latching the
supply output off (red)
6. ON: The supply output
is enabled (green)
7. OFF: The supply output
has been disabled (green)
8. LCL: The supply is in
Local control mode (green)
9. RMT: The supply is in Remote program mode (green)
10. CV: The supply is operating in
Constant Voltage mode (green)
11. CC: The supply is operating in
Constant Current mode (green)
Thursday, June 13, 2019, 14:05: ELOG 732 - PS replaced. |
Monday, September 23, 2019, 13:30, Aaron Schmidt, Ta#59, LP-SIS, ITE, TM2, 44062-5, 42752-10, In progress, Conditioning Ta#59 Assy 9x
|
Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38: Closed BV1A / Opened BV1 A & B to open both @ 35.0 T.
Monday, September 23, 2019, 14:20: Turbo pumps started.
Monday, September 23, 2019, 14:27: Ion gauge on.
Tuesday, September 24, 2019, 08:04: RGA on.
Tuesday, September 24, 2019, 08:07: Waterlines opened. No response on RGA. Vacuum ok @ 1.52e-06T.
Tuesday, September 24, 2019, 08:12: Power / sources on.
Tuesday, September 24, 2019, 08:16: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Tuesday, September 24, 2019, 08:19: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.
Tuesday, September 24, 2019, 08:20: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.33 |
5.00 |
TBHT |
28.19 |
7.75
|
COIL + EE |
28.08 |
2.13 |
TGHT |
28.18 |
6.15 |
Tuesday, September 24, 2019, 08:28: BIAS / EE / EZL @ 27 / -1.5 / 13 kV. Spark*
Tuesday, September 24, 2019, 08:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 24, 2019, 09:07: Optics set.
Tuesday, September 24, 2019, 10:45: Clusters of sparks noted. Especially around 10:20.
Tuesday, September 24, 2019, 10:58: RGA reset.
Tuesday, September 24, 2019, 11:05 Sparks ongoing. spaced from 1 minutes apart to 15 minutes apart. The TBHT insulator is glowing blue on the left right side again.
Tuesday, September 24, 2019, 11:06: Abort Target heating.
Tuesday, September 24, 2019, 11:12: BIAS to 23 KV. Blue glow less pronounced / almost gone.
Tuesday, September 24, 2019, 11:15: BIAS to 30 KV. Blue glow remains.
Tuesday, September 24, 2019, 11:31: Continue auto-ramping @ 2A per min.
Tuesday, September 24, 2019, 11:39. HV off.
Tuesday, September 24, 2019, 11:49: Halt ramp. Auto-cooling @ 4 A per min.
Remove loose wiring / connection from 9-pin area in the back. Ground other loose connections.
Tuesday, September 24, 2019, 13:28: Auto-ramping TGHT / TBHT to 250 / 200 A @ 4A per min.
Tuesday, September 24, 2019, 13:31: HV sources on. Optics on.
Tuesday, September 24, 2019, 13:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 24, 2019, 14:32: Auto-ramping TGHT to 280 A @ 4A per min.
Tuesday, September 24, 2019, 14:40: TGHT / TBHT @ 280 / 200 A.
EPICS issues* ? Won't open at the ISAC TS computer.
Wednesday, September 25, 2019, 07:30: Auto-ramping TGHT to 350 A @ 2 A per min.
Wednesday, September 25, 2019, 07:44: EPICS Error at my desk as well. Able to restart it and continue ramping.
Wednesday, September 25, 2019, 07:56: EPICS Issue ongoing. Halted ramping @ 290 A on TGHT.
Wednesday, September 25, 2019, 10:44: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 25, 2019, 11:57: FM: Sparks have been occurring for the past 20 min with a rate approx of 0.5/min. The TBHT insulator is again showing a glowing blue. I managed to saw one spark flashing up the TBHT insulator.
Wednesday, September 25, 2019, 12:59: RGA restarted.
Wednesday, September 25, 2019, 13:36: Spark* knocked out TSG:CB1 during RPM6A wire scan. Controls notified.
Wednesday, September 25, 2019, 14:45: After investigation with controls, replacement of the control board to TSG:CB1 likely req'd.
Thursday, September 26, 2019, 06:30: HV off. Prep to remove control board for TSG:CB1.
Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced. https://elog.triumf.ca/TIS/Test-Stand/759
Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful.
Thursday, September 26, 2019, 11:36: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, September 26, 2019, 12:31: Mass, wire, & emittance scans successful
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.23 |
7.59 |
TBHT |
26.86 |
10.02
|
COIL + EE |
26.65 |
3.27 |
TGHT |
26.89 |
7.29 |
Thursday, September 26, 2019, 12:33: Auto-cooling to TGHT / TBHT to 530 / 180 @ 4A per min.
Thursday, September 26, 2019, 12:45: TGHT / TBHT @ 530 / 180A. Hold*
Thursday, September 26, 2019, 13:17: No Sparks*. Auto-cooling to TGHT / to 500 @ 4A per min.
Thursday, September 26, 2019, 13:25: No Sparks*. FC0 'in'.
Thursday, September 26, 2019, 13:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Thursday, September 26, 2019, 14:28: Auto-cooling @ 2A per min.
Friday, September 27, 2019, 07:17: HV off.
Friday, September 27, 2019, 07:19: RGA off
Friday, September 27, 2019, 07:21: Close & reset IV4.
Friday, September 27, 2019, 07:23: Power / Sources off. Ion gauge & Turbo pumps off.
Friday, September 27, 2019, 10:29: Venting. Waterlines purged. |
Friday, September 27, 2019, 11:54, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-6, , Conditioning UC#(29) HS
|
Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53: Roughing.
Friday, September 27, 2019, 13:14: Turbo pumps on.
Friday, September 27, 2019, 13:20: Ion gauge on.
Friday, September 27, 2019, 13:24: RGA on.
Monday, September 30, 2019, 07:30: Waterlines Opened. No response on RGA. Vacuum ok @ 5.39e-07T.
Monday, September 30, 2019, 07:34: Power / Sources on.
Monday, September 30, 2019, 07:35: Auto-ramping TGHT to 580 A @ 2 A per min.
Tuesday, October 01, 2019, 14:29: Auto-Cooling TGHT @ 2A per min.
Wednesday, October 02, 2019, 08:24: Power / sources off.
Wednesday, October 02, 2019, 08:25: RGA off.
Wednesday, October 02, 2019, 08:26: Ion gauge & Turbo pumps off.
Wednesday, October 02, 2019, 12:50: Venting & Waterlines purged. |
Wednesday, October 02, 2019, 13:42, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Conditioning UC#(30) HS
|
Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13: Turbo Pumps started.
Wednesday, October 02, 2019, 14:19: Ion gauge on.
Wednesday, October 02, 2019, 14:24: RGA on.
Thursday, October 03, 2019, 07:35: Waterlines opened. No response on RGA. Vacuum ok @ 7.53e-07T
Thursday, October 03, 2019, 07:37: Power / Sources on.
Thursday, October 03, 2019, 07:38: Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, October 04, 2019, 14:53: Auto-cooling @ 2 A per min.
Wednesday, October 16, 2019, 10:17: RGA off.
Wednesday, October 16, 2019, 10:19: Power / Sources off. IG1 off. Turbo pumps off. |
Friday, November 01, 2019, 16:01, Fernando Maldonado, , LP-SIS, , , 41790-9, 43515-9 , In progress, Peek seal tests on UCx#30 HS
|
Friday, November 01, 2019, 15:47: A symbiotic peek seal assembly was installed on the manipulator grip to verify the temperature at high voltage and high current.
Friday, November 01, 2019, 15:48: Three thermocouples added for temperature readings.
Friday, November 01, 2019, 15:47: Roughing
Friday, November 01, 2019, 16:19: Turbos on.
Friday, November 01, 2019, 16:27: IG1 on.
Friday, November 01, 2019, 16:29: RGA on.
AS
Monday, November 04, 2019, 07:41: Waterlines opened. No response on RGA. Vacuum ok @ 3.97e-07T.
Monday, November 04, 2019, 07:44: Power / sources on.
Monday, November 04, 2019, 07:47: Auto-ramping TGHT to 300 A @ 2 A per min.
Monday, November 04, 2019, 10:57: Auto-ramping TGHT to 400 A @ 2 A per min.
FM
Monday, November 04, 2019, 12:11: Auto-ramping TGHT to 500 A @ 2 A per min.
Monday, November 04, 2019, 13:35: Auto-ramping TGHT to 600 A @ 2 A per min.
Monday, November 04, 2019, 14:48: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 15:03: Bias/EE/EZL @ 40/2.0/17 kV.
Monday, November 04, 2019, 15:04: Sparks observed after reaching 40 kV. TMS:TP6 down. Back down to 32 kV.
Monday, November 04, 2019, 15:04: Bias to 40 kV. One spark only. Seems stable now.
Sparks occurred sparsely. Max time without a spark was 26 minutes.
Monday, November 04, 2019, 16:09: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 16:16: RGA restart.
AS
Tuesday, November 05, 2019, 08:30: RGA Restarted.
Tuesday, November 05, 2019, 08:32: Begin bringing up HV to 35 kV on BIAS.
Tuesday, November 05, 2019, 08:35: BIAS / EE / EZL @ 35 / 1.8 / 15 kV.
Tuesday, November 05, 2019, 08:55: No sparks after 20 minutes. Move up to 40 kV.
Tuesday, November 05, 2019, 08:59: BIAS / EE / EZL @ 40 / 2.0 / 20 kV.
Tuesday, November 05, 2019, 09:34: Audible Spark*. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6. Appears on EZl cur.
Tuesday, November 05, 2019, 09:37: RGA off. Leave it off.
Tuesday, November 05, 2019, 09:38: Audible Spark* but not loud at all. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6.
Tuesday, November 05, 2019, 10:00: BIAS / EE / EZL @ 35 / 1.8 / 17.5 kV.
Tuesday, November 05, 2019, 10:06: BIAS / EE / EZL @ 0 / 0 / 0 kV.
Tuesday, November 05, 2019, 10:07: Auto-cooling TGHT to 500 A @ 4 A per min.
Wednesday, November 13, 2019, 07:29: Turbo pumps & ion gauge off. RGA was already off.
Friday, November 15, 2019, 08:43: Venting.
|
Friday, November 08, 2019, 14:21, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Nitrogen Bottle leak test
|
Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38
4.8 Purity
35-40 PSI pressure.
Successfully purged the line after 5 minutes.
Friday, November 08, 2019, 14:16: Begin FS#5 waterline purge w/ Nitrogen. Purge done in conjunction with UC#30 HS & assy.
4.8 Purity
12-14 PSI line pressure.
2500 PSI bottle pressure.
Full stream for a minute or so, then purged lightly. Drops / mist outgoing.
Friday, November 08, 2019, 14:24: Line Pressure at 10-11 PSI, brought back up to 14 PSI.
2400 PSI bottle pressure. Water / mist outgoing still.
Friday, November 08, 2019, 14:31: No water appears on line with purge.
Approx 2350 PSI bottle pressure.
Line pressure increased to 40 PSI. No water appeared on the purge line.
Friday, November 08, 2019, 14:34: Purge complete. 14 PSI appears successful. |
Tuesday, January 21, 2020, 09:38, Aaron Schmidt, SiC#40, LP-SIS, , , 43044-8, 43515-8, In progress, Conditioning SiC#40 HS
|
Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: BV1A open Roughing.
Tuesday, January 21, 2020, 09:38: BV1B open.
Tuesday, January 21, 2020, 10:05: Turbo pumps on.
Tuesday, January 21, 2020, 10:10: Ion gauge on.
Monday, January 27, 2020, 07:07: PS / Sources on. Waterlines already opened.
Monday, January 27, 2020, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, January 28, 2020, 14:45: Auto-Cooling @ 2 A per min.
Thursday, January 30, 2020, 11:31: PS / Source off.
Thursday, January 30, 2020, 11:33: IG1 off. Turbos off.
Thursday, January 30, 2020, 13:00: Venting. |
Thursday, January 30, 2020, 15:25, Aaron Schmidt, C(#1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C(#1) HS
|
Was for UC# 32* - Schedule change, now for C#1
Thursday, January 30, 2020, 15:13: Roughing.
Thursday, January 30, 2020, 15:46: Turbo pumps on.
Thursday, January 30, 2020, 15:50: IG1 on.
Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.
Friday, January 31, 2020, 08:16: Power / sources on
Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min.
Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.
Friday, February 07, 2020, 11:45:
Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd. |
Friday, February 07, 2020, 14:02, Aaron Schmidt, C#(1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C#(1) HS
|
Was for UC# 32* - Schedule change, now for C#1* - Last HS conditioning revealed a TGHT to HS lid short. Milled the lid back 1/8" - Aaron S.
Friday, February 07, 2020, 14:00: Roughing.
Friday, February 07, 2020, 14:33: Turbo pumps on.
Friday, February 07, 2020, 14:38: IG1 on.
Monday, February 10, 2020, 07:39: HS waterlines opened. Vacuum ok @ 4.12e-07T.
Monday, February 10, 2020, 07:41: Power / sources on.
Monday, February 10, 2020, 07:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 10, 2020, 13:01: Heating appears ok. No voltage abnormalities or short.
Monday, February 10, 2020, 13:02: Auto-Cooling @ 1 A per min.
Tuesday, February 11, 2020, 06:39: Power / Sources off.
Tuesday, February 11, 2020, 06:40: Waterlines purged. Nitrogen bottle @ 2100 PSI approx.
Tuesday, February 11, 2020, 06:42: IG1 off. Turbo pumps off.
Tuesday, February 11, 2020, 09:59: Venting.
|
Wednesday, February 12, 2020, 11:04, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-1, In progress, Conditioning HS
|
Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*
Wednesday, February 12, 2020, 10:57: Roughing.
Wednesday, February 12, 2020, 11:30: Turbo pumps on.
Thursday, February 13, 2020, 07:19: Waterlines opened. Vacuum ok @ 6.91e-07T.
Thursday, February 13, 2020, 07:22: Power / Sources on. TGHT only.
Thursday, February 13, 2020, 07:25: Auto-ramping TGHT @ 2A per min to 580 A.
Friday, February 14, 2020, 14:03: Auto-cooling @ 1 A per min.
Thursday, February 20, 2020, 07:33: PS, sources off, locked out.
Thursday, February 20, 2020, 07:34: Turbo pumps & IG1 off.
Thursday, February 20, 2020, 07:35: Waterlines purged. Nitrogen Bottle around 2050 PSI.
Thursday, February 20, 2020, 09:22: Venting.
|
Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing
|
Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04: Roughing.
Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).
Thursday, February 20, 2020, 14:43: IG1 on.
Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.
Friday, February 21, 2020, 06:38: Turbo pumps off.
EE Thermocouples req'd.
Friday, February 21, 2020, 11:15: Vented.
9-pin removed. Thermocouples installed.
Friday, February 21, 2020, 13:52: Roughing.
Friday, February 21, 2020, 14:24: Turbo pumps on.
EE Waterline - On
Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T
Wednesday, February 26, 2020, 07:43: Power / sources on.
Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Upper left)
[C] |
EE Temp (B - T4 - Lower right)
[C] |
250 / 150 |
20.8 |
24.0 |
350 / 200 |
22.5 |
29.7
|
450 / 230 |
20.1 |
30.9 |
580 / 230 |
14.5 |
28.8 |
580 / 230 @ 2:52 pm |
6.2 |
21.6 |
Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.
Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.
Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.
Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.
Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)
Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.
Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.
Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.
No water/cooling running into EE.
Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.
Thursday, February 27, 2020, 07:28: Power / Sources on.
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Upper left)
[C] |
EE Temp (B - T4 - Lower right)
[C] |
0 / 0 |
22.8 |
22.9 |
50 / 25 |
22.6 |
22.7 |
100 / 50 |
22.6 |
22.6
|
150 / 100 |
22.2 |
23.3 |
200 / 150 |
22.0 |
24.9 |
200 / 150 7am Day 2 |
21.2 |
23.9 |
250 / 200 |
23.3 |
29.3 |
300 / 230 |
22.4 |
30.6 |
350 / 230 |
19.2 |
27.7 |
450 / 230 |
18.5 |
29.7 |
580 / 230 |
13.4 |
27.3 |
Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.
Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.
Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.
Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.
Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.
Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.
Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.
Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.
Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.
Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.
Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.
Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)
Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off. |
|