Entry  Wednesday, August 22, 2018, 15:20, Aaron Schmidt, , LP-SIS, , , 41177-3, , , Voltage Tests (Ta Target)  
 Wires reconfigured / set 
Wednesday, August 22, 2018, 13:10: Roughing. 
Wednesday, August 22, 2018, 15:18: Turbo Pumps on.
Entry  Friday, August 31, 2018, 12:27, Aaron Schmidt, nSiC#1, LP-SIS, ITW, TM2, 43044-1, 42752-4, In progress, Conditioning nSiC#1 15x
Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo pumps started.

Wednesday, September 05, 2018, 11:03: RGA on.
Entry  Wednesday, September 12, 2018, 11:19, Aaron Schmidt, Ta#57, LP-SIS, ITE, TM4, 41177-3, 42752-6, In progress, Conditioning Ta#57 9x
Wednesday, September 12, 2018, 11:06: Roughing. Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: Turbo pumps started. 
Wednesday, September 12, 2018, 12:40: Ion gauge on.
Entry  Monday, September 17, 2018, 11:52, Aaron Schmidt, UC#25, LP-SIS, ITW, TM2, , 42752-9, In progress, Conditioning Heat Shield for UC#25 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx
Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51: Roughing. Doors sealed
Monday, September 17, 2018, 12:30: Turbo pumps started.
Entry  Monday, April 15, 2019, 14:42, Aaron Schmidt, , LP-SIS, , , , 42972-1, Done, Conditioning UC#27 HS & test FS#3 UC#27_&_FS#3_check.docxTS-2019-04-16-08-20.rga
New coil lines installed for P2N testing later.
Monday, April 15, 2019, 14:15: Roughing.
Monday, April 15, 2019, 14:49: Turbo pumps on.
Entry  Tuesday, April 23, 2019, 14:39, Aaron Schmidt, , LP-SIS, , , , 42752-8, Done, Conditioning UC#28 HS  TS-2019-04-24-07-30.rgaUC#28_HS.docx
Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo pumps started.
Tuesday, April 23, 2019, 15:18: Ion gauge on. 
Entry  Friday, April 26, 2019, 13:45, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, In progress, Conditioning Ta#58 HS 7x
Friday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo pumps on.
Friday, April 26, 2019, 14:58: RGA on.
Entry  Tuesday, May 07, 2019, 13:16, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, , In progress, 9-pin connection configuration (Using Ta#58) HV_Tests_2019_-_AL_-_1.docxTS-2019-05-08-08-12.rgaTS-2019-05-08-14-20.rga
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and  terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Entry  Tuesday, May 14, 2019, 10:22, Aaron Schmidt, ZrC#8, LP-SIS, ITE, TM2, 43044-5, 42972-3, In progress, Conditioning ZrC#8 HS ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx
Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo pumps on.
Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.
Entry  Monday, June 03, 2019, 11:35, Aaron Schmidt, , LP-SIS, , TM4, 395530-3, 42752-5, Problems/Solutions, TGHT PS Failed. 
Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to  50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began  running independently.
Anode current dropped from 7.328 mA to 6.105 mA.  Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.
Entry  Monday, September 23, 2019, 13:30, Aaron Schmidt, Ta#59, LP-SIS, ITE, TM2, 44062-5, 42752-10, In progress, Conditioning Ta#59 Assy 9x
Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38: Closed BV1A / Opened BV1 A & B to open both @ 35.0 T.
Monday, September 23, 2019, 14:20: Turbo pumps started.
Entry  Friday, September 27, 2019, 11:54, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-6, , Conditioning UC#(29) HS 
Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53: Roughing.
Friday, September 27, 2019, 13:14: Turbo pumps on.
Entry  Wednesday, October 02, 2019, 13:42, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Conditioning UC#(30) HS UC#30.docx
Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13: Turbo Pumps started.
Wednesday, October 02, 2019, 14:19: Ion gauge on.
Entry  Friday, November 01, 2019, 16:01, Fernando Maldonado, , LP-SIS, , , 41790-9, 43515-9 , In progress, Peek seal tests on UCx#30 HS UC#30-plus-peak-seal.docxTS-2019-11-01-16-22.rgaTS-2019-11-04-16-12.rgaTS-2019-11-05-08-30.rga
Friday, November 01, 2019, 15:47: A symbiotic  peek seal assembly  was installed on the manipulator grip to verify the temperature at high
voltage and high current.
Friday, November 01, 2019, 15:48: Three  thermocouples added for temperature readings.
Entry  Friday, November 08, 2019, 14:21, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Nitrogen Bottle leak test 
Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38
4.8 Purity
35-40 PSI pressure.
Entry  Tuesday, January 21, 2020, 09:38, Aaron Schmidt, SiC#40, LP-SIS, , , 43044-8, 43515-8, In progress, Conditioning SiC#40 HS SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga
Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: BV1A open Roughing.
Entry  Thursday, January 30, 2020, 15:25, Aaron Schmidt, C(#1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C(#1) HS C#1_-_Short.docx
Was for UC# 32* - Schedule change, now for C#1
Thursday, January 30, 2020, 15:13: Roughing.
Thursday, January 30, 2020, 15:46: Turbo pumps on.
Entry  Friday, February 07, 2020, 14:02, Aaron Schmidt, C#(1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C#(1) HS C#1_-_2.docx
Was for UC# 32* - Schedule change, now for C#1* - Last HS conditioning revealed a TGHT to HS lid short. Milled the lid back 1/8" - Aaron S.
Friday, February 07, 2020, 14:00: Roughing.
Friday, February 07, 2020, 14:33: Turbo pumps on.
Entry  Wednesday, February 12, 2020, 11:04, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-1, In progress, Conditioning HS UC#31.docx
Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*
Wednesday, February 12, 2020, 10:57: Roughing.
Wednesday, February 12, 2020, 11:30: Turbo pumps on.
Entry  Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx
 Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04: Roughing.
Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).