986
|
Monday, November 27, 2023, 16:09 |
Ferran Boix Pamies | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, November 27, 2023, 16:09
Roughing
Monday, November 27, 2023, 17:22 |
|
1022
|
Friday, September 20, 2024, 14:22 |
Aaron Schmidt | Ta# | LP-SIS | ITE | TM2 | 45447-18 | 45235-13 | | Conditioning Ta# | https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: |
|
949
|
Tuesday, December 06, 2022, 11:20 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Tests | Thermocouples installed:
O - O
O - Anode |
|
950
|
Tuesday, December 13, 2022, 16:12 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 2 | Thermocouples installed (X):
O - O
O - Anode |
|
951
|
Friday, December 16, 2022, 10:32 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 3 | Thermocouples installed (X):
O - O
O - Anode |
|
962
|
Monday, April 17, 2023, 14:08 |
Aaron Schmidt | TiC#6 | HP-FEBIAD | ITW | TM2 | 44692-10 | 45235-12 | In progress | Conditioning TiC#6 | Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A
open. |
|
965
|
Friday, May 05, 2023, 06:49 |
Aaron Schmidt | TiC#6 | HP-FEBIAD | ITW | TM2 | 44692-10 | 45235-12 | In progress | Conditioning TiC#6 | Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B |
|
982
|
Tuesday, October 10, 2023, 15:46 |
Aaron Schmidt | Ta#68 (Spare) | LP-SIS | | | 45220-3 | 45235-11 | In progress | Conditioning Ta#68 (Spare) | Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on. |
|
1014
|
Thursday, July 25, 2024, 14:26 |
Dave Neilson | Ta#67 Thin foil | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Conditioning Ta#67 Thin foil | Thursday, July 25, 2024, 14:25 -
competing electrical checks prior to test
stand installation |
|
1015
|
Monday, July 29, 2024, 23:02 |
Aurelia Laxdal | Ta#67 Thin foils | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Cooldown for removing the V wires | 22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. |
|
1018
|
Friday, August 09, 2024, 21:08 |
Ferran Boix Pamies | Ta#67 Thin foils | LP-SIS | ITE | TM4 | 45447-14 | 45235-10 | In progress | Ta#67 thin foil retesting | Friday, August 09, 2024, 21:07 Insulators,
retainer and Re foil have been replaced,
source cup machined so the ion source does |
|
959
|
Thursday, February 02, 2023, 12:44 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-1 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41: |
|
1028
|
Tuesday, November 05, 2024, 16:40 |
Brady Borrmann | UC #24D (Assembly only) | LP-IG-LIS | | | | 44972-5 / 42972-9 | In progress | Conditioning UC#24D Assembly | 42972-5 Base / 42972-9 Lid
|
|
942
|
Tuesday, October 18, 2022, 13:25 |
Aaron Schmidt | C#5 | LP-SIS | | | 45235-5 | 44691-13 | In progress | Conditioning C#5 | Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open |
|
908
|
Tuesday, December 21, 2021, 13:34 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-6 | In progress | Salts test HS & Holiday Shutdown | LP-SIS modified w/ 2 holes on the center
block to accept a pair of Ta tubes that are
run to the coil PS. |
|
885
|
Thursday, July 22, 2021, 17:43 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD efficiency measurements | Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos |
|
886
|
Monday, July 26, 2021, 17:35 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD efficiency measurements. | Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos
on. |
|
887
|
Tuesday, July 27, 2021, 12:57 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Assembly has new gas tube to the
target for better fit and clearance to the
HS. |
|
888
|
Wednesday, July 28, 2021, 08:48 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Modified spiral tube from VCR to
counteract torque towards the HS. Now points
towards TBHT. |
|
890
|
Friday, July 30, 2021, 16:28 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Done | FEBIAD parameter scan - efficiency measurements | Restarting everything after swapping
RP1 (see elog 889).
|
|