Thursday, April 17, 2025, 15:46 target installed. now roughing
Thursday, April 17, 2025, 17:12 Turbo pumps on.
Tuesday, April 22, 2025, 15:45 Water cooling on. no effect on vacuum
Tuesday, April 22, 2025, 15:46 ramping TGHT TBHT to 580A 230A at .5A/30s
Wednesday, April 23, 2025, 09:21 slowly increasing HV BIAS/EE/EZL to 30kV, 2.5kV, 13kV, watching for sparks.
Wednesday, April 23, 2025, 10:46 first spark seen at 28kV, ezl 13kV.
Wednesday, April 23, 2025, 12:35 at HV BIAS >42kV. have seen 3 large sparks outside of the chamber (not due to the target assembly, that appears to be quite stable). leaving at 41kV until appears sparks have ceased.
Wednesday, April 23, 2025, 13:59 No sparks at 41kV. while increasing to 42kV, 3 sparks occurred over ~75min. say 25min spark period at 41.5kV
Wednesday, April 23, 2025, 14:00 dropped HV to 30kV, EZL to 13kV. turning on optics for scans. (controls for TMS Q2/Q5 must be looked at. it often must be reconfigured in canbus settings. sometimes multiple times to turn it on.)
FC0: 2.12e-8 A
Wire scanners on ISAC fiducials setting:
RPM0A: 2025-04-23 C#5 RPM0A_1nA, 2025-04-23 C#5 RPM0A_33nA
RPM0B: 2025-04-23 C#5 RPM0B_1nA, 2025-04-23 C#5 RPM0B_33nA
Wednesday, April 23, 2025, 14:12 running mass scan. - 2025-04-23 C#5 conditioning mass scan
Mass 40 RPM6, ISAC fiducials:
2025-04-23 C#5 RPM6A_33nA
2025-04-23 C#5 RPM6B_33nA
Wednesday, April 23, 2025, 14:50 decreasing HV to 0 0 0
Wednesday, April 23, 2025, 15:01 decreasing TGHT TBHT to 0 0 at 1A/30s
Thursday, April 24, 2025, 08:16 turning off turbo pumps |