ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
787
|
Monday, March 02, 2020, 14:42 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Full TS testing w/ HV using Ta#60 | Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on. |
|
789
|
Wednesday, March 11, 2020, 13:31 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Ta#60 w/ EE testing - 2 | Thermocouples installed on EE. Double checked
continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30: |
|
794
|
Wednesday, June 10, 2020, 08:23 |
Aaron Schmidt | C#1 | LP-SIS | ITW | TM2 | 43044-8 | 43515-3 | In progress | Conditioning C#1 | Salts:
Li - 10 uL
Na - 10 uL |
7x |
795
|
Tuesday, June 16, 2020, 11:03 |
Aaron Schmidt | Ta#60 | LP-SIS | ITW | TM2 | 44139-13 | 43515-5 | In progress | Conditioning Ta#60 | Tuesday, June 16, 2020, 11:01: Turbo pumps
on.
Wednesday, June 17, 2020, |
|
804
|
Tuesday, August 04, 2020, 15:07 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | Tuesday, August 04, 2020, 15:04:
Roughing.
Wednesday, August 05, 2020, |
|
806
|
Tuesday, August 11, 2020, 12:04 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | HS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked. |
|
813
|
Tuesday, September 29, 2020, 11:56 |
Aaron Schmidt | | LP-SIS | | | | | Problems/Solutions | Leak check 3.0 | Installed Indium gasket on FS#2 - (C) water
block / R- TGHT.
Tuesday, September 29, 2020, 11:23: |
|
814
|
Wednesday, September 30, 2020, 06:23 |
Aaron Schmidt | C#2 | LP-SIS | ITW | TM2 | 44139-9 | 43515-2 | In progress | Conditioning C#2 | Wednesday, September 30, 2020, 06:14: Power
/ sources on.
Wednesday, September 30, 2020, 06:17: |
|
816
|
Friday, October 16, 2020, 11:33 |
Aaron Schmidt | Ta#61 | LP-SIS | ITE | TM4 | 44508-1 | 43515-1 | In progress | Conditioning Ta#61 | Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39:
TP1B on. |
|
817
|
Tuesday, October 27, 2020, 08:54 |
Aaron Schmidt | Nb#9 | LP-SIS | ITW | TM2 | 44508-2 | 43515-4 | In progress | Nb#9 Conditioning | Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13:
TP1B on. |
|
819
|
Friday, November 06, 2020, 12:53 |
Aaron Schmidt | Nb#9 | LP-SIS | ITW | TM2 | 44508-2 | 43515-4 | In progress | Conditioning Nb#9 w/ P/S Target & Bracket | Attached end plate parasitic / symbiotic
target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: |
7x |
840
|
Thursday, January 21, 2021, 10:10 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration - SIS with TBHT negatively biased | Thursday, January 21, 2021, 10:05:
Anodeless Negative Bias On Surface Ion
Source, or ANBOSIS (still working on the |
|
842
|
Friday, January 29, 2021, 09:13 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | In progress | TS settings ok. | Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good. |
|
843
|
Monday, February 01, 2021, 08:38 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration | Monday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the amount of dispersion at the |
|
844
|
Thursday, February 04, 2021, 18:48 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Problems/Solutions | Energy spread calibration with SIS | The system was vented to make clearance
on the waterlines as a very small continuous
discharge was observed. |
6x |
845
|
Thursday, February 04, 2021, 19:22 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration with SIS | See e-log entry: 884:
Thursday, February 04, 2021, 18:45:
Roughing |
|
846
|
Monday, February 08, 2021, 09:20 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration with SIS. No PE | Re-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17:
Roughing. |
|
848
|
Wednesday, February 10, 2021, 09:49 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-2 / 44378-3 | Failed | Energy spread calibration with SIS | Note* target has a ring on the TGHT - Right
leg. EE & PE placed. Target to HS OL
- OK. |
|
874
|
Wednesday, May 26, 2021, 14:29 |
Aaron Schmidt | UC#33 (HS) | LP-SIS | ITW | TM2 | | 44378-3 | In progress | UC#33 HS conditioning | HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B |
|
875
|
Wednesday, June 02, 2021, 10:45 |
Aaron Schmidt | UC#34 HS | LP-SIS | | TM2 | 43044-13 | 44378-1 | In progress | UC#34 HS conditioning | Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06:
Roughing. |
|
|