Entry  Monday, March 02, 2020, 14:42, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Full TS testing w/ HV using Ta#60 
Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo pumps on.

Remove HV cage (top). Reroute FS#3 back to cool EE
Entry  Wednesday, March 11, 2020, 13:31, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing - 2 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx
Thermocouples installed on EE. Double checked continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30: Roughing.
Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at
Entry  Wednesday, June 10, 2020, 08:23, Aaron Schmidt, C#1, LP-SIS, ITW, TM2, 43044-8, 43515-3, In progress, Conditioning C#1 7x
Salts: 
Li - 10 uL
Na - 10 uL
Entry  Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60  Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt
Tuesday, June 16, 2020, 11:01: Turbo pumps on.

Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.
Wednesday, June 17, 2020, 07:51: Power / Sources on.
Entry  Tuesday, August 04, 2020, 15:07, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly UCx_-_HS_w-PEEK_Assy_-_43515-4.docx
 Tuesday, August 04, 2020, 15:04: Roughing.

Wednesday, August 05, 2020, 06:08: Turbo pumps on. 

Thursday, August 06, 2020, 06:58: Vacuum @ 1.52e-06T
Entry  Tuesday, August 11, 2020, 12:04, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly 
HS target leg openings were milled. Short from previous test by the look of it. TBHT insulator on source side is cracked.
Wiring up top adjusted for better clearance. EE (K) Cap appears ok.
Tuesday, August 11, 2020, 12:03: Roughing.
Entry  Tuesday, September 29, 2020, 11:56, Aaron Schmidt, , LP-SIS, , , , , Problems/Solutions, Leak check 3.0 
Installed Indium gasket on FS#2 - (C) water block / R- TGHT.
Tuesday, September 29, 2020, 11:23: Pressurize to 120 PSI at atmosphere.
LD: 0.0E-07 atm-CC/sec
Entry  Wednesday, September 30, 2020, 06:23, Aaron Schmidt, C#2, LP-SIS, ITW, TM2, 44139-9, 43515-2, In progress, Conditioning C#2 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx
Wednesday, September 30, 2020, 06:14: Power / sources on.
Wednesday, September 30, 2020, 06:17: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Wednesday, September 30, 2020, 06:22: Optics set (minus MB1).
Entry  Friday, October 16, 2020, 11:33, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, 43515-1, In progress, Conditioning Ta#61 Ta#61.docxITE-TM4-Ta#61-LP-SIS_Test_Stand.docxER-580-230-30kV-M133.txtER-580-230-30kV-M28.txt
Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39: TP1B on.
Friday, October 16, 2020, 12:29: TP1A on. 
Entry  Tuesday, October 27, 2020, 08:54, Aaron Schmidt, Nb#9 , LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Nb#9 Conditioning Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt
Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13: TP1B on.
Tuesday, October 27, 2020, 10:13: TP1A on.
Entry  Friday, November 06, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Conditioning Nb#9 w/ P/S Target & Bracket 7x
Attached end plate parasitic / symbiotic target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: Roughing.
Friday, November 06, 2020, 12:53: TP1B on.
Entry  Thursday, January 21, 2021, 10:10, Fernando Maldonado, , LP-SIS, , , 44139-10, 44378-2, Done, Energy spread calibration - SIS with TBHT negatively biased 
 Thursday, January 21, 2021, 10:05: Anodeless Negative Bias On Surface Ion  Source, or ANBOSIS (still working on the acronym). installed to
test energy spread vs position.
The SIS allow a more forgiving operation while calibrating such that other sources can have these type of measurements.
Entry  Friday, January 29, 2021, 09:13, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, In progress, TS settings ok. 
Friday, January 29, 2021, 09:11: CANBUS controller was replaced. Quick systems check ok. Sources, HV, & Optics all good.
Entry  Monday, February 01, 2021, 08:38, Fernando Maldonado, , LP-SIS, , , 44139-10 , 44378-2 , Failed, Energy spread calibration ESC_-_Jan_29_start.docxESC_-__Feb_3_start.docxER-580-230-30kV-m7.txtEr-580-230-30kV-m133.txt
Monday, February 01, 2021, 08:38 : The anode seems to be shorted but we can still test the  amount of dispersion at the image position, and
correlate with energy spread.
Monday, February 01, 2021, 11:27: Bias/EZL/EE @ 30/0/1.5 kV. 
Entry  Thursday, February 04, 2021, 18:48, Fernando Maldonado, , LP-SIS, , , 44139-10, 44378-2 , Problems/Solutions, Energy spread calibration with SIS 6x
The system was vented to  make clearance on the waterlines as a very small continuous discharge was observed.
The inspection revealed some marks on the HS water line (sideview photo). From the the bottom and from real close (zoom and backview photo) the
marks are quite noticeable with shinny copper in the middle and dark circles around.
Entry  Thursday, February 04, 2021, 19:22, Fernando Maldonado, , LP-SIS, , , 44139-10 , 44378-2, Done, Energy spread calibration with SIS ESC_-_Feb_5_Start.docx
See e-log entry: 884:
Thursday, February 04, 2021, 18:45: Roughing
Thursday, February 04, 2021, 19:13: Turbos on.
Entry  Monday, February 08, 2021, 09:20, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, Failed, Energy spread calibration with SIS. No PE ESC_-_Feb_8_Start.docx
Re-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17: Roughing.
Monday, February 08, 2021, 09:46: TP1B on
Entry  Wednesday, February 10, 2021, 09:49, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-2 / 44378-3, Failed, Energy spread calibration with SIS spark_inside_chamber_roof.pngspark_inside_chamber_front_view.png
Note* target has a ring on the TGHT - Right leg. EE & PE placed. Target to HS OL - OK.
Wednesday, February 10, 2021, 09:37: Roughing.
Wednesday, February 10, 2021, 09:45: Bypass / Force applied on IG1 to test Anode.
Entry  Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning Conditioning_UC#33_HS.docx
HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on. 
Entry  Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning 
 Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06: Roughing.
Wednesday, June 02, 2021, 12:15: TP1B on. 