  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  931   Wednesday, June 08, 2022, 10:01 Aaron SchmidtTa#64LP-SISITETM444691-1244378-13In progressConditioning Ta#64 & HV Test.Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33:
Roughing.
 7x 
  906   Friday, November 12, 2021, 13:01 Aaron SchmidtTa#63LP-SISITETM444691-1144378-12In progressConditioning Ta#63Friday, November 12, 2021, 13:01: BV1B
open. Roughing.
Friday, November 12, 2021, 13:05:
 Ta#63.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m131.txt 
  899   Tuesday, September 14, 2021, 17:12 Aaron SchmidtC#3LP-SISITWTM244691-744378-11In progressC#3 ConditioningTuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37:
TP1B on.
 6x 
  820   Tuesday, November 10, 2020, 12:13 Aaron Schmidt    43044-1344378-1In progressPump down empty chamber / Leak.U-Loop installed on FS#5
Tuesday, November 10, 2020, 12:13:
Roughing.
  
  875   Wednesday, June 02, 2021, 10:45 Aaron SchmidtUC#34 HSLP-SIS TM243044-1344378-1In progressUC#34 HS conditioning Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06:
Roughing.
  
  801   Monday, July 20, 2020, 11:40 Aaron Schmidt(Empty-Test)   44160-143822-2In progressConditioning Test P2NSalts added: 
Cs - 15 uL
Li - 10 uL
 P2N_-_1_-_July-20-22-2020.docx 
  761   Wednesday, October 02, 2019, 13:42 Aaron Schmidt LP-SIS  41790-943515-9In progressConditioning UC#(30) HSWednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13:
Turbo Pumps started.
 UC#30.docx 
  770   Friday, November 08, 2019, 14:21 Aaron Schmidt LP-SIS  41790-943515-9In progressNitrogen Bottle leak testFriday, November 01, 2019, 14:00: Nitrogen
bottle installed. Purged waterlines HS /
FS#5. Purge done in conjunction with SiC#38
  
  777   Tuesday, January 21, 2020, 09:38 Aaron SchmidtSiC#40LP-SIS  43044-843515-8In progressConditioning SiC#40 HSWas intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34:
 SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga 
  790   Tuesday, March 17, 2020, 11:40 Aaron SchmidtSiC#40HP-SISITWTM242218-843515-8In progressConditioning SiC#40Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines
re-opened except FS#5 (HS cooling).
 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx 
  881   Wednesday, June 23, 2021, 12:24 Aaron SchmidtSiC#40HP-SISITETM442218-843515-8In progressSiC#40 Conditioning-2Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22:
TP1B on.
 SiC#40_Conditioning_-_2.docxER-580-230-30kV-m7_-_2.txt 
  760   Friday, September 27, 2019, 11:54 Aaron Schmidt LP-SIS  41790-943515-6 Conditioning UC#(29) HSUsing broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53:
Roughing.
  
  785   Thursday, February 20, 2020, 11:41 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04:
Roughing.
 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx 
  787   Monday, March 02, 2020, 14:42 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressFull TS testing w/ HV using Ta#60Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on.
  
  789   Wednesday, March 11, 2020, 13:31 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing - 2Thermocouples installed on EE. Double checked
continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30:
 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx 
  795   Tuesday, June 16, 2020, 11:03 Aaron SchmidtTa#60LP-SISITWTM244139-1343515-5In progressConditioning Ta#60 Tuesday, June 16, 2020, 11:01: Turbo pumps
on.

Wednesday, June 17, 2020,
 Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt 
  804   Tuesday, August 04, 2020, 15:07 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assembly Tuesday, August 04, 2020, 15:04:
Roughing.

Wednesday, August 05, 2020,
 UCx_-_HS_w-PEEK_Assy_-_43515-4.docx 
  806   Tuesday, August 11, 2020, 12:04 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assemblyHS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked.
  
  817   Tuesday, October 27, 2020, 08:54 Aaron SchmidtNb#9 LP-SISITWTM244508-243515-4In progressNb#9 ConditioningTuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13:
TP1B on.
 Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt 
  819   Friday, November 06, 2020, 12:53 Aaron SchmidtNb#9LP-SISITWTM244508-243515-4In progressConditioning Nb#9 w/ P/S Target & BracketAttached end plate parasitic / symbiotic
target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24:
 7x 