Entry  Wednesday, June 08, 2022, 10:01, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, 44378-13, In progress, Conditioning Ta#64 & HV Test. 7x
Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33: Roughing.
Wednesday, June 08, 2022, 10:07: TP1B on.
Entry  Friday, November 12, 2021, 13:01, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, 44378-12, In progress, Conditioning Ta#63 Ta#63.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m131.txt
Friday, November 12, 2021, 13:01: BV1B open. Roughing.
Friday, November 12, 2021, 13:05: BV1A open.
Friday, November 12, 2021, 13:34: TP1B on.
Entry  Tuesday, September 14, 2021, 17:12, Aaron Schmidt, C#3, LP-SIS, ITW, TM2, 44691-7, 44378-11, In progress, C#3 Conditioning 6x
Tuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37: TP1B on.
Tuesday, September 14, 2021, 17:47: TP1A on.
Entry  Tuesday, November 10, 2020, 12:13, Aaron Schmidt, , , , , 43044-13, 44378-1, In progress, Pump down empty chamber / Leak. 
U-Loop installed on FS#5
Tuesday, November 10, 2020, 12:13: Roughing.
Tuesday, November 10, 2020, 12:57: TP1B on
Entry  Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning 
 Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06: Roughing.
Wednesday, June 02, 2021, 12:15: TP1B on. 
Entry  Monday, July 20, 2020, 11:40, Aaron Schmidt, (Empty-Test), , , , 44160-1, 43822-2, In progress, Conditioning Test P2N P2N_-_1_-_July-20-22-2020.docx
Salts added: 
Cs - 15 uL
Li - 10 uL
Entry  Wednesday, October 02, 2019, 13:42, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Conditioning UC#(30) HS UC#30.docx
Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13: Turbo Pumps started.
Wednesday, October 02, 2019, 14:19: Ion gauge on.
Entry  Friday, November 08, 2019, 14:21, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Nitrogen Bottle leak test 
Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38
4.8 Purity
35-40 PSI pressure.
Entry  Tuesday, January 21, 2020, 09:38, Aaron Schmidt, SiC#40, LP-SIS, , , 43044-8, 43515-8, In progress, Conditioning SiC#40 HS SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga
Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: BV1A open Roughing.
Entry  Tuesday, March 17, 2020, 11:40, Aaron Schmidt, SiC#40, HP-SIS, ITW, TM2, 42218-8, 43515-8, In progress, Conditioning SiC#40 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx
Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines re-opened except FS#5 (HS cooling).
Tuesday, March 17, 2020, 12:08: Turbo pumps on.
Entry  Wednesday, June 23, 2021, 12:24, Aaron Schmidt, SiC#40, HP-SIS, ITE, TM4, 42218-8, 43515-8, In progress, SiC#40 Conditioning-2 SiC#40_Conditioning_-_2.docxER-580-230-30kV-m7_-_2.txt
Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22: TP1B on.
TP1B tripped.
Entry  Friday, September 27, 2019, 11:54, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-6, , Conditioning UC#(29) HS 
Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53: Roughing.
Friday, September 27, 2019, 13:14: Turbo pumps on.
Entry  Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx
 Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04: Roughing.
Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).
Entry  Monday, March 02, 2020, 14:42, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Full TS testing w/ HV using Ta#60 
Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo pumps on.

Remove HV cage (top). Reroute FS#3 back to cool EE
Entry  Wednesday, March 11, 2020, 13:31, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing - 2 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx
Thermocouples installed on EE. Double checked continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30: Roughing.
Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at
Entry  Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60  Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt
Tuesday, June 16, 2020, 11:01: Turbo pumps on.

Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.
Wednesday, June 17, 2020, 07:51: Power / Sources on.
Entry  Tuesday, August 04, 2020, 15:07, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly UCx_-_HS_w-PEEK_Assy_-_43515-4.docx
 Tuesday, August 04, 2020, 15:04: Roughing.

Wednesday, August 05, 2020, 06:08: Turbo pumps on. 

Thursday, August 06, 2020, 06:58: Vacuum @ 1.52e-06T
Entry  Tuesday, August 11, 2020, 12:04, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly 
HS target leg openings were milled. Short from previous test by the look of it. TBHT insulator on source side is cracked.
Wiring up top adjusted for better clearance. EE (K) Cap appears ok.
Tuesday, August 11, 2020, 12:03: Roughing.
Entry  Tuesday, October 27, 2020, 08:54, Aaron Schmidt, Nb#9 , LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Nb#9 Conditioning Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt
Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13: TP1B on.
Tuesday, October 27, 2020, 10:13: TP1A on.
Entry  Friday, November 06, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Conditioning Nb#9 w/ P/S Target & Bracket 7x
Attached end plate parasitic / symbiotic target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: Roughing.
Friday, November 06, 2020, 12:53: TP1B on.