928
|
Wednesday, May 25, 2022, 15:48 |
Aaron Schmidt | SiC#42 | HP-FEBIAD | ITW | TM2 | 44692-9 | 44378-5 | In progress | Conditioning SiC#42 | Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on.
Wednesday, May 25, 2022, 16:46: IG1 on.
Thursday, May 26, 2022, 09:20: FS#5 Waterline opened. Vacuum ok @ 5.27e-06T.
HV preset: BIAS / EE / EZL @ 30 / -1.0 / 15 kV
Friday, May 27, 2022, 05:11: Coil to 40 A. Anode t0 300 V.
Friday, May 27, 2022, 05:16: TGHT on. Auto-ramping TGHT / TBHT to 580 / 290 @ 2 A per min.
Friday, May 27, 2022, 07:14: Optics set & IV4 opened. TGHT / TBHT @ 242 A (Ramping ongoing)
FM
Friday, May 27, 2022, 17:17 : IG1 @ 5.19e-6 T. TBHT @ 290 A. TGHT @ 540 A since 16:27.
Friday, May 27, 2022, 17:18: The assembly has been outgassing and the good vacuum limit was reached, preventing reaching the operational point.
Friday, May 27, 2022, 17:19: Auto-ramp up aborted. We'll heat up again Monday morning.
Friday, May 27, 2022, 17:20: Auto-cooling to 0 A @ 2A/min
Sunday, May 29, 2022, 21:35: Auto-ramping TGHT/ TBHT to 350 / 150 A @ 2 A per min - AS.
Sunday, May 29, 2022, 21:40: Vacuum @ 1.43e-06T.
Monday, May 30, 2022, 04:53: Vacuum @ 1.49e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min - AS
Monday, May 30, 2022, 08:06: Initial wire & mass scans ok. Increase EE to -1.5 kV.
Monday, May 30, 2022, 08:30: EE back to -1.0 kV.
Monday, May 30, 2022, 10:31: BIAS / EE / EZL / Anode @ 0 kV. Lock over. Open back/top cage.
FM
Monday, May 30, 2022, 11:21: Mass set to 40Ar+. The gas on/off now shows an effect on the signal
Monday, May 30, 2022, 11:24: Running a small scan to test the web-app
Monday, May 30, 2022, 14:00: Spark towards TBHT, TPS:Q1 charged up.
Monday, May 30, 2022, 14:30: Spark to anode.
Monday, May 30, 2022, 16:16: Issue preventing FEBIAD-scan solve.
Monday, May 30, 2022, 16:16 : FEBIAD scan on 40Ar+.
Monday, May 30, 2022, 17:00: TMS :VCB1 died in the middle of the scan. Scan aborted save id 1085. Starting a new scan
Monday, May 30, 2022, 18:24: measured_id = 1086
Moving to H2O
Monday, May 30, 2022, 18:30: Scan started for H2O.
Monday, May 30, 2022, 19:53: Scan finished. measure_id = 1087
Monday, May 30, 2022, 19:58: Gas off. Scan for H2O ready to go.
Monday, May 30, 2022, 19:59: Scan started
Monday, May 30, 2022, 21:21: Scan finished. measured_id = 1089
Monday, May 30, 2022, 21:32: Auto-cooling to 0 A @ 2A/min
AS
Tuesday, May 31, 2022, 05:10: All HV & Sources off.
Tuesday, May 31, 2022, 05:11: IV4 closed. IG1 & turbo pumps off.
Tuesday, May 31, 2022, 07:02: IV4 reset. Venting.
Tuesday, May 31, 2022, 07:08: FS#5 purged. Power locked up. |
Attachment 1: ER-580-290-30kV-m28.txt
|
value (Voltage offset 40.0000)
75.0000
1.0000
95.0000
29978.0220
21
21
./emit.dat
-0.1062 -0.0681 -0.0748 -0.0781 -0.0751 -0.0757 -0.0800 -0.0732 -0.0766 -0.0781 -0.0757 -0.0766 -0.0784 -0.0751 -0.0674 -0.0769 -0.0620 -0.0693 -0.0760 -0.0632 -0.0668
-0.0745 -0.0604 -0.0693 -0.0757 -0.0653 -0.0684 -0.0726 -0.0690 -0.0711 -0.0739 -0.0684 -0.0705 -0.0742 -0.0693 -0.0620 -0.0739 -0.0586 -0.0595 -0.0693 -0.0613 -0.0635
-0.0745 -0.0592 -0.0543 -0.0735 -0.0662 -0.0623 -0.0613 -0.0577 -0.0726 -0.0711 -0.0549 -0.0659 -0.0757 -0.0571 -0.0574 -0.0726 -0.0659 -0.0601 -0.0543 -0.0601 -0.0635
-0.0720 -0.0620 -0.0565 -0.0665 -0.0653 -0.0644 -0.0690 -0.0586 -0.0708 -0.0763 -0.0580 -0.0677 -0.0748 -0.0626 -0.0577 -0.0735 -0.0659 -0.0598 -0.0577 -0.0616 -0.0629
-0.0723 -0.0601 -0.0589 -0.0699 -0.0644 -0.0641 -0.0659 -0.0595 -0.0699 -0.0751 -0.0580 -0.0665 -0.0763 -0.0650 -0.0583 -0.0726 -0.0662 -0.0592 -0.0598 -0.0589 -0.0638
-0.0732 -0.0580 -0.0595 -0.0647 -0.0641 -0.0629 -0.0635 -0.0613 -0.0690 -0.0745 -0.0613 -0.0668 -0.0739 -0.0623 -0.0595 -0.0708 -0.0671 -0.0577 -0.0699 -0.0598 -0.0620
-0.0726 -0.0595 -0.0574 -0.0717 -0.0668 -0.0629 -0.0641 -0.0586 -0.0705 -0.0720 -0.0592 -0.0671 -0.0729 -0.0604 -0.0610 -0.0742 -0.0650 -0.0571 -0.0690 -0.0629 -0.0632
-0.0745 -0.0595 -0.0574 -0.0647 -0.0653 -0.0626 -0.0665 -0.0601 -0.0720 -0.0739 -0.0592 -0.0638 -0.0739 -0.0589 -0.0604 -0.0742 -0.0635 -0.0610 -0.0641 -0.0604 -0.0623
-0.0726 -0.0598 -0.0574 -0.0650 -0.0647 -0.0635 -0.0681 -0.0598 -0.0699 -0.0739 -0.0583 -0.0641 -0.0757 -0.0604 -0.0577 -0.0754 -0.0629 -0.0610 -0.0650 -0.0613 -0.0647
-0.0742 -0.0589 -0.0577 -0.0638 -0.0613 -0.0623 -0.0677 -0.0595 -0.0699 -0.0732 -0.0589 -0.0626 -0.0735 -0.0610 -0.0598 -0.0742 -0.0616 -0.0592 -0.0677 -0.0601 -0.0620
-0.0729 -0.0583 -0.0562 -0.0708 -0.0653 -0.0607 -0.0677 -0.0589 -0.0687 -0.0732 -0.0574 -0.0659 -0.0729 -0.0601 -0.0592 -0.0708 -0.0623 -0.0592 -0.0723 -0.0613 -0.0620
-0.0726 -0.0586 -0.0558 -0.0717 -0.0656 -0.0589 -0.0620 -0.0595 -0.0723 -0.0748 -0.0604 -0.0635 -0.0717 -0.0580 -0.0580 -0.0732 -0.0610 -0.0592 -0.0659 -0.0641 -0.0623
-0.0732 -0.0598 -0.0583 -0.0723 -0.0659 -0.0607 -0.0665 -0.0598 -0.0717 -0.0748 -0.0577 -0.0647 -0.0760 -0.0586 -0.0583 -0.0720 -0.0613 -0.0580 -0.0601 -0.0632 -0.0632
-0.0726 -0.0574 -0.0571 -0.0662 -0.0635 -0.0632 -0.0693 -0.0583 -0.0705 -0.0735 -0.0558 -0.0638 -0.0757 -0.0580 -0.0577 -0.0726 -0.0629 -0.0595 -0.0623 -0.0620 -0.0653
-0.0702 -0.0577 -0.0574 -0.0723 -0.0607 -0.0613 -0.0659 -0.0577 -0.0674 -0.0742 -0.0574 -0.0629 -0.0739 -0.0607 -0.0595 -0.0717 -0.0629 -0.0577 -0.0653 -0.0595 -0.0616
-0.0732 -0.0571 -0.0577 -0.0641 -0.0635 -0.0598 -0.0656 -0.0601 -0.0674 -0.0732 -0.0568 -0.0616 -0.0732 -0.0595 -0.0595 -0.0726 -0.0620 -0.0580 -0.0681 -0.0629 -0.0607
-0.0729 -0.0580 -0.0595 -0.0708 -0.0641 -0.0613 -0.0607 -0.0601 -0.0690 -0.0720 -0.0595 -0.0644 -0.0729 -0.0595 -0.0583 -0.0732 -0.0616 -0.0574 -0.0766 -0.0647 -0.0626
-0.0729 -0.0586 -0.0568 -0.0665 -0.0665 -0.0665 -0.0604 -0.0568 -0.0723 -0.0745 -0.0565 -0.0656 -0.0742 -0.0583 -0.0580 -0.0714 -0.0653 -0.0580 -0.0644 -0.0610 -0.0632
-0.0705 -0.0595 -0.0580 -0.0668 -0.0635 -0.0604 -0.0681 -0.0568 -0.0687 -0.0742 -0.0571 -0.0620 -0.0745 -0.0607 -0.0565 -0.0705 -0.0623 -0.0577 -0.0693 -0.0613 -0.0638
-0.0708 -0.0574 -0.0592 -0.0623 -0.0650 -0.0595 -0.0623 -0.0577 -0.0699 -0.0726 -0.0577 -0.0635 -0.0729 -0.0595 -0.0574 -0.0711 -0.0632 -0.0562 -0.0720 -0.0589 -0.0620
-0.0723 -0.0571 -0.0601 -0.0620 -0.0662 -0.0580 -0.0674 -0.0586 -0.0696 -0.0720 -0.0589 -0.0610 -0.0723 -0.0610 -0.0601 -0.0708 -0.0607 -0.0571 -0.0684 -0.0613 -0.0616
|
Attachment 2: SiC#42.docx
|
Attachment 3: SiC#42_Conditioning_-_R.docx
|
|
876
|
Monday, June 07, 2021, 13:45 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Ta#62 Conditioning | Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)
Monday, June 07, 2021, 14:32: Unstable. Venting.
Monday, June 07, 2021, 15:05: Changed gaskets. Left side suspect. Roughing.
Monday, June 07, 2021, 15:35: TP1B on.
Monday, June 07, 2021, 15:42: TP1B up to speed.
Monday, June 07, 2021, 15:45: TP1A on.
Monday, June 07, 2021, 16:01: IG1 on.
Monday, June 07, 2021, 16:02: FS#5 opened. No response on backing lines. TSG:IG1 ok.
Tuesday, June 08, 2021, 08:01: Power / sources on.
Tuesday, June 08, 2021, 08:07: Reset / CFG optics & steering.
Tuesday, June 08, 2021, 08:08: TGHT / TBHT @ 10 A ok. BIAS / EE / EZL @ 5 / -0.5 / 1 kV. Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
4.02 |
TBHT |
22.4 |
3.15
|
COIL + EE |
21.9 |
4.99 |
TGHT |
22.0 |
5.58 |
Tuesday, June 08, 2021, 08:13: Auto ramping TGHT / TBHT to 350 / 150 @ 2 A per min.
Tuesday, June 08, 2021, 08:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Small spark near 30 kV while bringing up the HV.
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.
Tuesday, June 08, 2021, 12:44: Auto ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Tuesday, June 08, 2021, 15:53: Beam on FC0 ok. Optics set minus TPS:CB2, however FC6 is disconnected. auto-cooling @ 3 A per min.
Tuesday, June 08, 2021, 18:32: Auto-cooling halted. TGHT @ 104.3 A.
Wednesday, June 09, 2021, 07:13: Auto-cooling continued @ 2 A per min.
Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 10:33: Power / sources off. FS#5 purged. IV4 closed. IG1 & IG6 off. All turbo pumps off.
Wednesday, June 09, 2021, 11:52: Venting VV1 & VV6.
|
Attachment 1: Ta#62_Conditioning_-_1.docx
|
|
879
|
Wednesday, June 09, 2021, 14:31 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Install MB1 window & 9 pin for V test. | Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Wednesday, June 09, 2021, 14:41: Pins connected source tray side: 1, 4, 5, 6
https://elog.triumf.ca/TIS/Test-Stand/721
ST 9-pin HV rack
Pin to L TGHT - 1 - Black / COM / 5
Pin to R TGHT - 6 - Red / 9
Pin to L TBHT - 4 - Black / COM / 2
Pin to R TBHT - 5 - Red / 1
Wednesday, June 09, 2021, 14:29: Window installed. Roughing - Beam line side.
Wednesday, June 09, 2021, 14:41: TP6 on.
Wednesday, June 09, 2021, 14:45: TP2 on.
Wednesday, June 09, 2021, 14:55: Roughing.
Wednesday, June 09, 2021, 16:09: TP1 on.
Thursday, June 10, 2021, 13:25: Power / sources on. FS#5 open.\
TGHT reading ok , TBHT odd? Internal connection.
Thursday, June 10, 2021, 14:45: Turbo pumps off.
Thursday, June 10, 2021, 15:25: Venting.
Thursday, June 10, 2021, 16:16: Fixed TBHT connection. Roughing.
Thursday, June 10, 2021, 16:20: Bypass used. TGHT / TBHT to 40 A each. Multimeter check ok.
Thursday, June 10, 2021, 16:24: TGHT / TBHT to 0 A. Bypass removed.
Thursday, June 10, 2021, 16:43: TP1B on.
Thursday, June 10, 2021, 16:48: TP1A on.
Thursday, June 10, 2021, 16:55: IG1 on
Tests Complete as per Aurelia.
Monday, June 21, 2021, 07:51: Power / sources off. IG1 & IG6 off. All TP off. FS#5 purged.
Monday, June 21, 2021, 09:40: Venting both ends. |
Attachment 1: Ta#62_voltage_tests.docx
|
|
880
|
Monday, June 21, 2021, 11:53 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | Failed | Ta#62 Conditioning - 2 | Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing chamber.
Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.
Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.
Monday, June 21, 2021, 12:02: TP1B on.
Monday, June 21, 2021, 12:13: TP1A on.
Monday, June 21, 2021, 12:21: IG1 on.
Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5
Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.
Monday, June 21, 2021, 14:42: Power / Sources on.
Monday, June 21, 2021, 14:43; IV4 opened & Optics on
Tuesday, June 22, 2021, 07:40: Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.7 |
4.02 |
TBHT |
24.2 |
3.18
|
COIL + EE |
23.6 |
5.11 |
TGHT |
23.8 |
5.64 |
Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.
Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.
Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.
Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.
Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.
Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.
Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.
Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.
Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off.
Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged. |
Attachment 1: Ta#62_Conditioning_-_2.docx
|
|
882
|
Friday, June 25, 2021, 11:18 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44691-4 | 44378-4 | Done | Ta#62 Conditioning - New | Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
Friday, June 25, 2021, 11:55: TP1B started.
Friday, June 25, 2021, 12:00: TP1B on. TP1 A started.
Friday, June 25, 2021, 12:08: IG1 on.
Friday, June 25, 2021, 12:23: Vacuum @ 1.06E-05T. Open waterline FS#5.
Friday, June 25, 2021, 12:26: Vacuum @ 9.97E-06T. OK.
Friday, June 25, 2021, 12:30: Power / sources PS on.
Friday, June 25, 2021, 12:34: Full check for remote use. IV4 open (OK)
Vacuum @ 6.70e-06T
TGHT / TBHT @ 10 / 10 A
BIAS / EE / EZL @ 1 / -0.1 / 0.5 kV.
Ready for operation.
Friday, June 25, 2021, 12:39: All back to 0 Kv / 0 A. Wait for vacuum stabilization.
Sunday, June 27, 2021, 03:55: Auto-ramping TGHT / TBHT to 500 / 150 A @ 2 A per min.
Sunday, June 27, 2021, 04:04: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Sunday, June 27, 2021, 09:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Sunday, June 27, 2021, 10:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Sunday, June 27, 2021, 10:16: TGHT / TBHT @ 580 / 230 A. Vacuum @ 1.25e-06T.
Sunday, June 27, 2021, 11:20: Mass & wire scans complete. Vacuum @ 1.14e-06T. Auto-cooling @ 2 A per min.
Sunday, June 27, 2021, 15:07: BIAS / EE / EZL @ 0 kV. TGHT still cooling.
Monday, June 28, 2021, 06:17: IV4 closed (Needs reset). Sources, IG1, turbo pumps, off
Monday, June 28, 2021, 08:22: Power off. IV4 reset. Venting. |
Attachment 1: Ta#62_44691-4_Conditioning_-_R.docx
|
Attachment 2: Ta#62_44691-4_Conditioning..docx
|
Attachment 3: ITE-TM4-Ta#62-LP-SIS_Test_Stand.docx
|
|
874
|
Wednesday, May 26, 2021, 14:29 |
Aaron Schmidt | UC#33 (HS) | LP-SIS | ITW | TM2 | | 44378-3 | In progress | UC#33 HS conditioning | HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on.
Wednesday, May 26, 2021, 15:36: TP1B off.
Wednesday, May 26, 2021, 16:37: Venting.
Wednesday, May 26, 2021, 18:03: VV1 closed.
Thursday, May 27, 2021, 07:05: Gaskets swapped. Connections inspected. Roughing.
Thursday, May 27, 2021, 07:47: TP1B on.
Thursday, May 27, 2021, 08:00: TP1A started.
Thursday, May 27, 2021, 08:16: IG1 on.
Monday, May 31, 2021, 08:08: Vacuum @ 7.29e-07T.
Monday, May 31, 2021, 08:10: Waterlines opened. Vacuum ok @ 7.26e-07T
Monday, May 31, 2021, 08:12: Power/Sources on.
Monday, May 31, 2021, 08:15: No response on TGHT. TBHT ok.
Monday, May 31, 2021, 11:30: Loose control cable found on the PS. Connected. Manually set TGHT / TBHT to 10 A & back ok. Checked FS#5 interlocks - OK.
Monday, May 31, 2021, 11:50: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Monday, May 31, 2021, 18:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 01, 2021, 15:40: Auto-cooling @ 1 A per min.
Wednesday, June 02, 2021, 07:57: Power / sources off. Ion gauge & turbo pumps off.
Wednesday, June 02, 2021, 07:58: FS#5 purged.
Wednesday, June 02, 2021, 10:12: Venting.
|
Attachment 1: Conditioning_UC#33_HS.docx
|
|
939
|
Tuesday, August 30, 2022, 13:58 |
Aaron Schmidt | | | | | 44062-7 | 44378-25 | In progress | Conditioning UC#40 assembly | Conditioning the UC#40 LP-SIS assembly & ISAC TS main vacuum chamber. Straight / round oven in use (TGHT only).
Tuesday, August 30, 2022, 13:55: BV1B open. Roughing.
Tuesday, August 30, 2022, 14:00: BV1A open.
Wednesday, August 31, 2022, 07:29: Vacuum @ 0.064T. TP1B on.
Wednesday, August 31, 2022, 07:35: TP1 A on.
Wednesday, August 31, 2022, 08:56: Vacuum @ 9.97e-06T. Waterline FS#5 opened.
Wednesday, August 31, 2022, 08:58: Vacuum @ 9.95e-06T. OK. Power on.
Thursday, September 01, 2022, 07:50: Vacuum @ 5.21e-06T.
Thursday, September 01, 2022, 07:54: Manually tapped up TGHT to 50 A.
Limit increased on TGHT parameter setup to 5.500e-06T.
Thursday, September 01, 2022, 07:57: Auto-ramping TGHT to 580 A @ 2 A per min.
Monday, September 12, 2022, 15:09: Vacuum @ 1.69e-06T. Auto-cooling @ 2A per min.
Monday, September 26, 2022, 10:52: Turbo pumps off.
Monday, September 26, 2022, 12:20: Venting. PS off & waterlines purged. |
|
934
|
Thursday, June 23, 2022, 11:00 |
Aaron Schmidt | SiC#44 | HP-FEBIAD | ITE | TM4 | 37978-1 | 44378-24 | In progress | Conditioning SiC#44 | Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on
Thursday, June 23, 2022, 11:41: TP1A on.
Thursday, June 23, 2022, 11:49: IG1 on.
Thursday, June 23, 2022, 12:25: Gases on.
Thursday, June 23, 2022, 12:30: Power on. Cage locked up
Thursday, June 23, 2022, 14:14: Vacuum @ 3.23e-06T.
Thursday, June 23, 2022, 14:15: Waterlines opened. Vacuum stable.
Thursday, June 23, 2022, 14:16: IV4 opened.
Thursday, June 23, 2022, 14:17: Sources on.
Thursday, June 23, 2022, 14:18: Optics set. FM tune.
Thursday, June 23, 2022, 14:21: Electrical check OK. Will leave as is. Remote operation ready.
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Thursday, June 23, 2022, 14:22: Reset Kepco (E-rig) PS.
Friday, June 24, 2022, 09:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, June 24, 2022, 09:17: BIAS / EE / EZL @ 20 / -1.5 / 10 kV.
Friday, June 24, 2022, 13:18: Ramping ongoing. TGHT / TBHT @ 510 / 290 A. Vacuum @ 3.65e-06T
Friday, June 24, 2022, 19:19: FM Tune on optics / Sources. Vacuum @ 1.60e-06T. BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Friday, June 24, 2022, 19:42: Coil to 15 A. Anode to 200 V.
Friday, June 24, 2022, 20:00: Mass scans complete.
Friday, June 24, 2022, 20:01: BIAS / EZL reduced to 20 / 10 kV.
Friday, June 24, 2022, 20:02: Anode @ 100 V.
Monday, June 27, 2022, 09:34: BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Monday, June 27, 2022, 09:36: Anode @ 200 V. Coil @ 40 A. Vacuum @ 9.99e-07T
Monday, June 27, 2022, 10:09: Last scans complete. Auto-cooling @ 2 A per min.
Monday, June 27, 2022, 10:19: Anode, coil, & HV to 0.
Monday, June 27, 2022, 10:20: IV4 & SV5 Closed.
Wednesday, June 29, 2022, 10:57: Sources & IG1 off. Turbo pumps off
Wednesday, June 29, 2022, 12:25: Venting. |
Attachment 1: SiC#44_-_R.docx
|
Attachment 2: ER-580-290-30kV-m28.txt
|
value (Voltage offset 40.0000)
75.0000
1.0000
95.0000
29978.0220
21
21
./emit.dat
-0.1068 -0.0937 -0.1093 -0.1120 -0.1041 -0.1028 -0.1096 -0.1031 -0.1041 -0.1068 -0.1071 -0.1080 -0.1077 -0.1038 -0.1031 -0.1065 -0.0970 -0.0961 -0.1062 -0.0919 -0.0980
-0.1077 -0.0909 -0.1108 -0.1105 -0.0977 -0.1022 -0.1102 -0.1028 -0.1053 -0.1062 -0.1077 -0.1065 -0.1086 -0.1041 -0.1056 -0.1074 -0.0983 -0.0958 -0.1038 -0.0937 -0.0980
-0.1074 -0.0952 -0.0888 -0.1035 -0.1013 -0.0894 -0.0876 -0.0876 -0.1053 -0.1074 -0.0864 -0.0909 -0.1074 -0.0864 -0.0891 -0.1059 -0.0919 -0.0916 -0.0867 -0.0919 -0.0934
-0.1065 -0.0919 -0.0928 -0.1041 -0.0943 -0.0925 -0.0925 -0.0934 -0.0998 -0.1096 -0.0916 -0.0916 -0.1096 -0.0940 -0.0940 -0.1028 -0.0922 -0.0940 -0.1028 -0.0900 -0.0949
-0.1071 -0.0916 -0.0925 -0.1038 -0.0970 -0.0909 -0.0937 -0.0943 -0.1001 -0.1096 -0.0946 -0.0925 -0.1093 -0.0934 -0.0958 -0.1083 -0.0928 -0.0925 -0.0916 -0.0928 -0.0952
-0.1096 -0.0925 -0.0906 -0.1053 -0.0961 -0.0937 -0.0934 -0.0943 -0.1010 -0.1062 -0.0931 -0.0940 -0.1086 -0.0946 -0.0903 -0.1062 -0.0943 -0.0916 -0.0998 -0.0912 -0.0958
-0.1096 -0.0940 -0.0934 -0.1050 -0.0992 -0.0925 -0.0919 -0.0934 -0.1031 -0.1080 -0.0928 -0.0970 -0.1077 -0.0934 -0.0934 -0.1031 -0.0931 -0.0916 -0.0943 -0.0931 -0.0958
-0.1077 -0.0940 -0.0903 -0.1047 -0.0977 -0.0931 -0.0922 -0.0919 -0.1001 -0.1074 -0.0925 -0.0974 -0.1089 -0.0934 -0.0952 -0.1031 -0.0906 -0.0922 -0.1013 -0.0931 -0.0964
-0.1093 -0.0916 -0.0922 -0.1016 -0.0940 -0.0925 -0.0940 -0.0928 -0.1013 -0.1086 -0.0928 -0.0952 -0.1117 -0.0937 -0.0934 -0.1035 -0.0919 -0.0943 -0.0946 -0.0909 -0.0980
-0.1074 -0.0900 -0.0922 -0.1025 -0.0961 -0.0897 -0.0916 -0.0934 -0.1001 -0.1080 -0.0937 -0.0949 -0.1102 -0.0925 -0.0912 -0.1047 -0.0919 -0.0949 -0.1062 -0.0928 -0.0967
-0.1071 -0.0912 -0.0919 -0.1028 -0.0983 -0.0919 -0.0912 -0.0919 -0.1010 -0.1071 -0.0943 -0.0943 -0.1093 -0.0937 -0.0909 -0.1059 -0.0916 -0.0922 -0.0888 -0.0931 -0.0958
-0.1086 -0.0928 -0.0922 -0.1041 -0.0980 -0.0937 -0.0925 -0.0934 -0.1010 -0.1083 -0.0919 -0.0937 -0.1093 -0.0937 -0.0922 -0.1019 -0.0931 -0.0903 -0.0934 -0.0937 -0.0943
-0.1080 -0.0934 -0.0912 -0.1038 -0.0961 -0.0937 -0.0931 -0.0919 -0.1016 -0.1089 -0.0916 -0.0946 -0.1123 -0.0940 -0.0940 -0.1050 -0.0943 -0.0925 -0.1044 -0.0922 -0.0980
-0.1086 -0.0912 -0.0925 -0.1022 -0.0977 -0.0909 -0.0925 -0.0919 -0.1013 -0.1086 -0.0919 -0.0946 -0.1120 -0.0922 -0.0946 -0.1025 -0.0922 -0.0931 -0.0922 -0.0928 -0.0949
-0.1086 -0.0919 -0.0931 -0.1035 -0.0940 -0.0903 -0.0922 -0.0937 -0.1001 -0.1080 -0.0931 -0.0928 -0.1086 -0.0934 -0.0897 -0.1047 -0.0919 -0.0912 -0.0885 -0.0919 -0.0925
-0.1096 -0.0903 -0.0922 -0.1019 -0.0977 -0.0922 -0.0922 -0.0937 -0.1019 -0.1068 -0.0940 -0.0949 -0.1089 -0.0952 -0.0912 -0.1028 -0.0916 -0.0922 -0.0900 -0.0928 -0.0937
-0.1083 -0.0922 -0.0909 -0.1016 -0.0970 -0.0937 -0.0922 -0.0912 -0.1019 -0.1089 -0.0925 -0.0946 -0.1086 -0.0949 -0.0943 -0.1044 -0.0940 -0.0906 -0.1013 -0.0925 -0.0970
-0.1077 -0.0925 -0.0919 -0.1022 -0.0964 -0.0928 -0.0928 -0.0925 -0.1019 -0.1080 -0.0922 -0.0943 -0.1093 -0.0931 -0.0958 -0.1059 -0.0937 -0.0928 -0.0940 -0.0916 -0.0974
-0.1068 -0.0922 -0.0934 -0.1038 -0.0961 -0.0922 -0.0937 -0.0940 -0.1010 -0.1086 -0.0912 -0.0934 -0.1108 -0.0912 -0.0922 -0.1013 -0.0922 -0.0922 -0.0952 -0.0897 -0.0961
-0.1086 -0.0906 -0.0931 -0.1031 -0.0946 -0.0897 -0.0931 -0.0937 -0.1007 -0.1068 -0.0937 -0.0943 -0.1105 -0.0943 -0.0912 -0.1059 -0.0912 -0.0909 -0.1105 -0.0909 -0.0949
-0.1080 -0.0900 -0.0925 -0.1041 -0.0974 -0.0916 -0.0928 -0.0946 -0.0995 -0.1077 -0.0925 -0.0949 -0.1099 -0.0967 -0.0909 -0.1041 -0.0925 -0.0916 -0.0961 -0.0931 -0.0967
|
Attachment 3: SiC#44.docx
|
|
940
|
Tuesday, September 27, 2022, 07:55 |
Aaron Schmidt | C#4 | LP-SIS | ITE | TM4 | 44691-3 | 44378-23 | In progress | Conditioning C#4 w/ thermocouples | Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X
O - X
X - X
X - X
Tuesday, September 27, 2022, 07:51: Roughing.
Tuesday, September 27, 2022, 08:25: TP1B on.
Tuesday, September 27, 2022, 08:45: TP1A on.
Tuesday, September 27, 2022, 11:02: Vacuum @ 8.31e-06T
Tuesday, September 27, 2022, 11:04: Waterline FS#5 opened. Vacuum @ 8.13e-06T. Power on
Data logger connected as per FBP
Tuesday, September 27, 2022, 12:18: Sources/PS on.
Tuesday, September 27, 2022, 12:21: TGHT / TBHT manually tapped up to 10A.
Tuesday, September 27, 2022, 12:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 27, 2022, 12:34: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Tuesday, September 27, 2022, 12:35: Sparks* @ 37 KV BIAS. Outside the cage. x 2
Tuesday, September 27, 2022, 12:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Tuesday, September 27, 2022, 12:47: BIAS / EE / EZL @ 45 / -2.3 / 19 kV with multiple sparks on the tap up.
Tuesday, September 27, 2022, 13:00: 2 more sparks. TSG:CBC down. (Red)
Tuesday, September 27, 2022, 13:08: BIAS / EE / EZL @ 47.2 / -2.4 / 20 kV. Significant spark outside the cage.
Tuesday, September 27, 2022, 13:10: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. Spark outside the cage.
Tuesday, September 27, 2022, 13:12: Blue glow / crack flowing across the TBHT.
Tuesday, September 27, 2022, 13:15: The glow is flexing? Fading in & out.
Tuesday, September 27, 2022, 13:50: HV Tap down to 0 kV
Tuesday, September 27, 2022, 14:13: TSG:CBC controls card replaced. Operation returned.
Tuesday, September 27, 2022, 14:14: IV4 opened.
Tuesday, September 27, 2022, 14:17: Optics set.
Tuesday, September 27, 2022, 14:19: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per min.
Tuesday, September 27, 2022, 14:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Remote operation clear.
Tuesday, September 27, 2022, 18:20: TS tripped shortly after 3:35 PM
Tuesday, September 27, 2022, 18:30: Reset TS sources & optics
Tuesday, September 27, 2022, 18:49: Auto-ramping TGHT / TBHT to 300 / 150 @ 1A per min. Allow for a gradual out gassing.
Tuesday, September 27, 2022, 21:20: TGHT / TBHT @ 150A Vacuum @ 2.15e-06T. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 22:08: TGHT / TBHT @ 200 / 150 A. Vacuum @ 2.15e-06T. Stable. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 23:19: Auto-ramp halted. Sped up to 2 A per min. Vacuum @ 1.96e-06T. TGHT @ 270 A.
Tuesday, September 27, 2022, 23:41: TGHT / TBHT @ 300 / 150 A. Vacuum @ 1.97e-06T
Wednesday, September 28, 2022, 06:36: Auto-ramping TGHT to 350A @ 1A per min.
Wednesday, September 28, 2022, 08:14: Vacuum remained stable @ 1.49e-06T. Auto-ramping TGHT / TBHT to 400 / 200 A @ 2A per min.
Wednesday, September 28, 2022, 08:48: Increase in vacuum up to 2.50e-06T+ followed by a drop in TBHT voltage. TGHT / TBHT remain stable @ 400 / 200 A. Vacuum stabilizing @ 2.32e-06T. HV off.
Wednesday, September 28, 2022, 09:15: Data logger setup. Pins moved from 3 & 4 to 4 & 5. Temperature @ 50.6 C.
Wednesday, September 28, 2022, 09:20: HV sources & optics back on. Tap up.
Wednesday, September 28, 2022, 09:33: Auto-ramping TGHT to 450A @ 2 A per min. Some small sparks noted.
Wednesday, September 28, 2022, 09:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, September 28, 2022, 09:59: Auto-ramping TGHT to 500A @ 2 A per min. Some small sparks noted although less frequent.
Wednesday, September 28, 2022, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 28, 2022, 10:41: BIAS lowered to 25 kV.
Wednesday, September 28, 2022, 11:09: TGHT / TBHT @ 580 / 230 A. BIAS @ 30 kV. Unstable / sparking.Very active on FC0
Wednesday, September 28, 2022, 11:29: Mass & wire scans ongoing. Reset DAC PS.
Wednesday, September 28, 2022, 11:58: Mass, wire & emittance scans complete. FC0 in. Auto-cooling @ 2 A per min.
Wednesday, September 28, 2022, 13:16: Cooling aborted for measurement.
Wednesday, September 28, 2022, 13:21: Auto-cooling @ 2 A per min.
Thursday, September 29, 2022, 07:20: IV4 closed. Sources off. IG 1 & TP off. |
Attachment 1: C#4_Conditioning_-_HV_test.docx
|
Attachment 2: ER-580-230-30kV-m7.txt
|
value (Voltage offset 40.0000)
75.0000
1.0000
95.0000
29978.0220
21
21
./emit.dat
-0.0824 -0.0668 -0.0815 -0.0839 -0.0800 -0.0787 -0.0797 -0.0836 -0.0775 -0.0836 -0.0784 -0.0815 -0.0854 -0.0092 -0.0769 -0.0803 -0.0662 -0.0699 -0.0858 -0.0650 -0.0729
-0.0800 -0.0659 -0.0812 -0.0845 -0.0803 -0.0800 -0.0775 -0.0821 -0.0781 -0.0864 -0.0797 -0.0827 -0.0815 -0.0098 -0.0748 -0.0806 -0.0641 -0.0693 -0.0842 -0.0613 -0.0717
-0.0806 -0.0629 -0.0696 -0.0705 -0.0809 -0.0659 -0.0620 -0.0626 -0.0797 -0.0806 -0.0623 -0.0803 -0.0830 0.0076 -0.0571 -0.0778 -0.0644 -0.0607 -0.0595 -0.0610 -0.0632
-0.0812 -0.0629 -0.0635 -0.0714 -0.0821 -0.0677 -0.0723 -0.0696 -0.0775 -0.0839 -0.0650 -0.0790 -0.0821 0.0027 -0.0552 -0.0793 -0.0644 -0.0644 -0.0723 -0.0638 -0.0653
-0.0797 -0.0638 -0.0665 -0.0702 -0.0818 -0.0674 -0.0632 -0.0720 -0.0778 -0.0806 -0.0629 -0.0821 -0.0830 0.0024 -0.0604 -0.0800 -0.0659 -0.0626 -0.0717 -0.0635 -0.0681
-0.0827 -0.0629 -0.0623 -0.0717 -0.0790 -0.0696 -0.0632 -0.0711 -0.0769 -0.0836 -0.0647 -0.0806 -0.0839 0.0027 -0.0601 -0.0800 -0.0653 -0.0623 -0.0626 -0.0681 -0.0671
-0.0833 -0.0629 -0.0635 -0.0687 -0.0797 -0.0702 -0.0629 -0.0739 -0.0815 -0.0824 -0.0650 -0.0797 -0.0845 0.0003 -0.0552 -0.0778 -0.0607 -0.0616 -0.0659 -0.0632 -0.0668
-0.0790 -0.0626 -0.0623 -0.0714 -0.0803 -0.0696 -0.0665 -0.0711 -0.0790 -0.0809 -0.0650 -0.0787 -0.0830 0.0012 -0.0540 -0.0793 -0.0671 -0.0635 -0.0671 -0.0620 -0.0659
-0.0809 -0.0620 -0.0626 -0.0720 -0.0827 -0.0662 -0.0665 -0.0720 -0.0766 -0.0824 -0.0638 -0.0787 -0.0833 0.0015 -0.0592 -0.0806 -0.0659 -0.0629 -0.0653 -0.0623 -0.0659
-0.0821 -0.0616 -0.0650 -0.0705 -0.0833 -0.0690 -0.0647 -0.0717 -0.0751 -0.0827 -0.0626 -0.0824 -0.0836 0.0015 -0.0555 -0.0778 -0.0644 -0.0632 -0.0677 -0.0616 -0.0659
-0.0809 -0.0604 -0.0659 -0.0674 -0.0772 -0.0717 -0.0626 -0.0729 -0.0800 -0.0800 -0.0632 -0.0778 -0.0858 0.0003 -0.0574 -0.0815 -0.0656 -0.0632 -0.0641 -0.0650 -0.0671
-0.0861 -0.0629 -0.0620 -0.0711 -0.0818 -0.0723 -0.0656 -0.0705 -0.0812 -0.0812 -0.0644 -0.0769 -0.0891 0.0027 -0.0558 -0.0797 -0.0696 -0.0629 -0.0616 -0.0644 -0.0671
-0.0809 -0.0641 -0.0623 -0.0705 -0.0797 -0.0662 -0.0739 -0.0702 -0.0781 -0.0824 -0.0650 -0.0797 -0.0836 0.0040 -0.0571 -0.0833 -0.0629 -0.0629 -0.0677 -0.0629 -0.0659
-0.0806 -0.0620 -0.0650 -0.0681 -0.0821 -0.0677 -0.0638 -0.0687 -0.0766 -0.0818 -0.0659 -0.0766 -0.0839 -0.0024 -0.0549 -0.0793 -0.0635 -0.0626 -0.0726 -0.0626 -0.0659
-0.0812 -0.0616 -0.0641 -0.0693 -0.0800 -0.0702 -0.0693 -0.0690 -0.0745 -0.0827 -0.0629 -0.0769 -0.0821 -0.0021 -0.0565 -0.0787 -0.0653 -0.0635 -0.0650 -0.0623 -0.0653
-0.0851 -0.0626 -0.0616 -0.0671 -0.0809 -0.0690 -0.0629 -0.0714 -0.0775 -0.0836 -0.0638 -0.0803 -0.0836 0.0009 -0.0558 -0.0806 -0.0659 -0.0629 -0.0726 -0.0641 -0.0641
-0.0827 -0.0626 -0.0610 -0.0723 -0.0754 -0.0705 -0.0696 -0.0705 -0.0787 -0.0812 -0.0647 -0.0751 -0.0851 -0.0021 -0.0558 -0.0827 -0.0641 -0.0635 -0.0653 -0.0626 -0.0705
-0.0833 -0.0665 -0.0629 -0.0699 -0.0769 -0.0714 -0.0635 -0.0681 -0.0793 -0.0833 -0.0653 -0.0793 -0.0833 -0.0040 -0.0558 -0.0812 -0.0638 -0.0644 -0.0659 -0.0629 -0.0671
-0.0778 -0.0635 -0.0623 -0.0687 -0.0800 -0.0699 -0.0635 -0.0690 -0.0763 -0.0833 -0.0620 -0.0790 -0.0818 -0.0058 -0.0555 -0.0830 -0.0629 -0.0629 -0.0714 -0.0623 -0.0638
-0.0803 -0.0623 -0.0632 -0.0656 -0.0772 -0.0650 -0.0638 -0.0696 -0.0800 -0.0827 -0.0610 -0.0778 -0.0830 -0.0073 -0.0537 -0.0803 -0.0653 -0.0638 -0.0668 -0.0613 -0.0659
-0.0821 -0.0610 -0.0635 -0.0693 -0.0732 -0.0684 -0.0629 -0.0687 -0.0772 -0.0812 -0.0650 -0.0787 -0.0827 -0.0012 -0.0562 -0.0800 -0.0644 -0.0641 -0.0665 -0.0635 -0.0641
|
Attachment 3: ER-580-230-30kV-m39.txt
|
value (Voltage offset 40.0000)
75.0000
1.0000
95.0000
29992.6740
21
21
./emit.dat
-0.0601 -0.0604 -0.0754 -0.0742 -0.0723 -0.0754 -0.0793 -0.0742 -0.0772 -0.0824 -0.0760 -0.0790 -0.0769 0.1862 0.1096 -0.0809 -0.0653 -0.0739 -0.0760 -0.0635 -0.0775
-0.0623 -0.0638 -0.0732 -0.0754 -0.0696 -0.0775 -0.0742 -0.0717 -0.0751 -0.0806 -0.0769 -0.0766 -0.0757 0.1663 0.1102 -0.0778 -0.0644 -0.0742 -0.0778 -0.0620 -0.0784
-0.0607 -0.0607 -0.0580 -0.0668 -0.0687 -0.0629 -0.0583 -0.0549 -0.0723 -0.0726 -0.0583 -0.0717 -0.0781 0.1706 0.1236 -0.0742 -0.0659 -0.0586 -0.0604 -0.0601 -0.0601
-0.0592 -0.0589 -0.0595 -0.0705 -0.0726 -0.0693 -0.0595 -0.0598 -0.0766 -0.0751 -0.0641 -0.0739 -0.0778 0.1163 0.2103 -0.0729 -0.0653 -0.0607 -0.0729 -0.0589 -0.0671
-0.0616 -0.0607 -0.0623 -0.0705 -0.0754 -0.0699 -0.0613 -0.0626 -0.0766 -0.0772 -0.0620 -0.0757 -0.0766 0.1218 0.2371 -0.0763 -0.0659 -0.0610 -0.0607 -0.0613 -0.0674
-0.0586 -0.0598 -0.0623 -0.0699 -0.0720 -0.0717 -0.0616 -0.0668 -0.0769 -0.0790 -0.0610 -0.0742 -0.0809 0.1294 0.2100 -0.0729 -0.0623 -0.0620 -0.0592 -0.0644 -0.0629
-0.0616 -0.0568 -0.0577 -0.0708 -0.0714 -0.0714 -0.0580 -0.0708 -0.0732 -0.0769 -0.0638 -0.0717 -0.0772 0.1306 0.1956 -0.0763 -0.0632 -0.0626 -0.0589 -0.0616 -0.0668
-0.0604 -0.0574 -0.0583 -0.0699 -0.0720 -0.0735 -0.0580 -0.0638 -0.0769 -0.0769 -0.0650 -0.0732 -0.0766 0.1273 0.2136 -0.0739 -0.0626 -0.0610 -0.0632 -0.0604 -0.0702
-0.0604 -0.0583 -0.0592 -0.0742 -0.0732 -0.0729 -0.0632 -0.0644 -0.0769 -0.0772 -0.0620 -0.0745 -0.0790 0.1212 0.2216 -0.0784 -0.0668 -0.0613 -0.0702 -0.0665 -0.0684
-0.0580 -0.0598 -0.0620 -0.0699 -0.0684 -0.0705 -0.0616 -0.0662 -0.0708 -0.0784 -0.0610 -0.0735 -0.0824 0.1236 0.2078 -0.0751 -0.0604 -0.0604 -0.0610 -0.0607 -0.0620
-0.0589 -0.0546 -0.0598 -0.0699 -0.0735 -0.0714 -0.0653 -0.0702 -0.0763 -0.0769 -0.0616 -0.0726 -0.0790 0.1251 0.2075 -0.0723 -0.0638 -0.0623 -0.0690 -0.0626 -0.0629
-0.0626 -0.0549 -0.0580 -0.0696 -0.0705 -0.0720 -0.0635 -0.0681 -0.0748 -0.0769 -0.0644 -0.0729 -0.0778 0.1248 0.2185 -0.0763 -0.0623 -0.0610 -0.0610 -0.0641 -0.0650
-0.0638 -0.0571 -0.0580 -0.0720 -0.0720 -0.0732 -0.0647 -0.0647 -0.0784 -0.0748 -0.0616 -0.0723 -0.0772 0.1245 0.2151 -0.0739 -0.0644 -0.0607 -0.0653 -0.0623 -0.0674
-0.0623 -0.0623 -0.0613 -0.0708 -0.0723 -0.0714 -0.0613 -0.0629 -0.0784 -0.0754 -0.0610 -0.0745 -0.0781 0.1282 0.2112 -0.0757 -0.0644 -0.0623 -0.0653 -0.0607 -0.0659
-0.0647 -0.0607 -0.0623 -0.0668 -0.0745 -0.0714 -0.0674 -0.0677 -0.0769 -0.0748 -0.0604 -0.0754 -0.0800 0.1242 0.2112 -0.0711 -0.0656 -0.0604 -0.0638 -0.0610 -0.0607
-0.0644 -0.0555 -0.0598 -0.0681 -0.0729 -0.0696 -0.0644 -0.0665 -0.0742 -0.0739 -0.0635 -0.0726 -0.0778 0.1248 0.2170 -0.0745 -0.0644 -0.0610 -0.0598 -0.0635 -0.0653
-0.0647 -0.0598 -0.0607 -0.0702 -0.0726 -0.0717 -0.0632 -0.0681 -0.0772 -0.0748 -0.0620 -0.0760 -0.0766 0.1196 0.2176 -0.0760 -0.0644 -0.0635 -0.0623 -0.0632 -0.0647
-0.0644 -0.0601 -0.0583 -0.0693 -0.0720 -0.0711 -0.0641 -0.0674 -0.0772 -0.0757 -0.0623 -0.0708 -0.0784 0.1196 0.2121 -0.0742 -0.0632 -0.0607 -0.0629 -0.0616 -0.0662
-0.0650 -0.0610 -0.0580 -0.0711 -0.0739 -0.0711 -0.0644 -0.0623 -0.0760 -0.0778 -0.0613 -0.0735 -0.0797 0.1270 0.2139 -0.0723 -0.0644 -0.0629 -0.0653 -0.0574 -0.0647
-0.0662 -0.0592 -0.0604 -0.0690 -0.0751 -0.0711 -0.0647 -0.0668 -0.0757 -0.0790 -0.0620 -0.0729 -0.0793 0.1245 0.2164 -0.0720 -0.0653 -0.0607 -0.0607 -0.0595 -0.0665
-0.0632 -0.0565 -0.0604 -0.0690 -0.0739 -0.0705 -0.0626 -0.0650 -0.0769 -0.0754 -0.0629 -0.0748 -0.0800 0.1236 0.2173 -0.0745 -0.0629 -0.0647 -0.0732 -0.0638 -0.0656
|
Attachment 4: ER-580-230-30kV-m134.txt
|
value (Voltage offset 40.0000)
75.0000
1.0000
95.0000
29978.0220
21
21
./emit.dat
-0.0763 -0.0742 -0.0842 -0.0854 -0.0815 -0.0867 -0.0839 -0.0821 -0.0766 -0.0867 -0.0818 -0.0861 -0.0766 0.1678 0.1974 -0.0784 -0.0754 -0.0836 -0.0882 -0.0693 -0.0766
-0.0800 -0.0754 -0.0839 -0.0851 -0.0842 -0.0827 -0.0818 -0.0827 -0.0806 -0.0885 -0.0815 -0.0842 -0.0824 0.1495 0.1978 -0.0772 -0.0809 -0.0806 -0.0885 -0.0729 -0.0760
-0.0787 -0.0610 -0.0684 -0.0821 -0.0839 -0.0754 -0.0681 -0.0748 -0.0812 -0.0812 -0.0635 -0.0827 -0.0806 0.1614 0.2170 -0.0745 -0.0797 -0.0592 -0.0620 -0.0623 -0.0610
-0.0760 -0.0641 -0.0635 -0.0830 -0.0839 -0.0723 -0.0735 -0.0742 -0.0827 -0.0848 -0.0641 -0.0809 -0.0815 0.1398 0.2686 -0.0778 -0.0772 -0.0650 -0.0690 -0.0629 -0.0653
-0.0784 -0.0629 -0.0647 -0.0858 -0.0839 -0.0723 -0.0708 -0.0757 -0.0809 -0.0861 -0.0653 -0.0839 -0.0854 0.1358 0.2646 -0.0803 -0.0778 -0.0644 -0.0705 -0.0638 -0.0650
-0.0803 -0.0632 -0.0635 -0.0793 -0.0873 -0.0684 -0.0699 -0.0732 -0.0824 -0.0845 -0.0653 -0.0824 -0.0821 0.1279 0.2527 -0.0769 -0.0760 -0.0632 -0.0699 -0.0629 -0.0620
-0.0818 -0.0623 -0.0626 -0.0812 -0.0842 -0.0702 -0.0702 -0.0751 -0.0787 -0.0839 -0.0647 -0.0833 -0.0815 0.1236 0.2469 -0.0763 -0.0784 -0.0613 -0.0705 -0.0623 -0.0623
-0.0778 -0.0635 -0.0620 -0.0818 -0.0830 -0.0714 -0.0674 -0.0748 -0.0821 -0.0861 -0.0641 -0.0833 -0.0812 0.1263 0.2600 -0.0778 -0.0763 -0.0629 -0.0677 -0.0638 -0.0638
-0.0772 -0.0659 -0.0641 -0.0790 -0.0812 -0.0714 -0.0714 -0.0732 -0.0800 -0.0867 -0.0644 -0.0836 -0.0848 0.1276 0.2701 -0.0790 -0.0763 -0.0638 -0.0665 -0.0629 -0.0644
-0.0797 -0.0620 -0.0638 -0.0818 -0.0809 -0.0720 -0.0705 -0.0732 -0.0787 -0.0891 -0.0644 -0.0854 -0.0867 0.1257 0.2582 -0.0793 -0.0757 -0.0620 -0.0742 -0.0613 -0.0653
-0.0824 -0.0632 -0.0632 -0.0790 -0.0836 -0.0674 -0.0723 -0.0732 -0.0827 -0.0870 -0.0659 -0.0861 -0.0885 0.1230 0.2567 -0.0772 -0.0769 -0.0623 -0.0653 -0.0626 -0.0653
-0.0793 -0.0616 -0.0616 -0.0812 -0.0842 -0.0699 -0.0717 -0.0751 -0.0821 -0.0824 -0.0650 -0.0821 -0.0815 0.1230 0.2655 -0.0778 -0.0790 -0.0595 -0.0763 -0.0644 -0.0629
-0.0790 -0.0641 -0.0635 -0.0775 -0.0842 -0.0717 -0.0677 -0.0748 -0.0821 -0.0845 -0.0659 -0.0821 -0.0815 0.1196 0.2676 -0.0751 -0.0769 -0.0613 -0.0601 -0.0656 -0.0629
-0.0793 -0.0656 -0.0641 -0.0781 -0.0812 -0.0699 -0.0702 -0.0717 -0.0815 -0.0864 -0.0607 -0.0812 -0.0827 0.1212 0.2594 -0.0772 -0.0775 -0.0616 -0.0696 -0.0610 -0.0635
-0.0815 -0.0638 -0.0632 -0.0766 -0.0806 -0.0674 -0.0711 -0.0748 -0.0824 -0.0858 -0.0626 -0.0827 -0.0821 0.1227 0.2609 -0.0790 -0.0742 -0.0632 -0.0684 -0.0598 -0.0656
-0.0830 -0.0629 -0.0620 -0.0854 -0.0879 -0.0690 -0.0699 -0.0748 -0.0827 -0.0836 -0.0641 -0.0818 -0.0830 0.1187 0.2673 -0.0784 -0.0790 -0.0632 -0.0732 -0.0647 -0.0644
-0.0806 -0.0635 -0.0620 -0.0815 -0.0821 -0.0714 -0.0711 -0.0760 -0.0812 -0.0861 -0.0665 -0.0839 -0.0818 0.1196 0.2643 -0.0778 -0.0790 -0.0632 -0.0714 -0.0653 -0.0610
-0.0800 -0.0623 -0.0632 -0.0793 -0.0839 -0.0693 -0.0681 -0.0745 -0.0818 -0.0827 -0.0604 -0.0815 -0.0818 0.1254 0.2637 -0.0739 -0.0769 -0.0623 -0.0702 -0.0644 -0.0644
-0.0800 -0.0641 -0.0629 -0.0778 -0.0818 -0.0702 -0.0684 -0.0735 -0.0812 -0.0839 -0.0641 -0.0824 -0.0830 0.1190 0.2655 -0.0757 -0.0748 -0.0626 -0.0681 -0.0620 -0.0641
-0.0803 -0.0647 -0.0644 -0.0797 -0.0812 -0.0674 -0.0702 -0.0745 -0.0803 -0.0848 -0.0641 -0.0821 -0.0858 0.1190 0.2631 -0.0806 -0.0760 -0.0647 -0.0693 -0.0616 -0.0656
-0.0818 -0.0632 -0.0629 -0.0793 -0.0830 -0.0690 -0.0711 -0.0739 -0.0778 -0.0858 -0.0629 -0.0821 -0.0858 0.1190 0.2615 -0.0793 -0.0757 -0.0620 -0.0757 -0.0626 -0.0629
|
|
903
|
Thursday, October 14, 2021, 10:13 |
Aaron Schmidt | | LP-SIS | ITW | TM2 | | 44378-22 | In progress | Conditioning UC#36 HS | Tube / TGHT only.
Thursday, October 14, 2021, 10:11: Roughing.
Thursday, October 14, 2021, 12:05: TP1B on.
Thursday, October 14, 2021, 12:10: TP1A on.
Thursday, October 14, 2021, 13:27: IG1 on.
Thursday, October 14, 2021, 16:08: Vacuum @ 3.73e-06T
Thursday, October 14, 2021, 16:10: FS#5 open. Vacuum Stable.
Thursday, October 14, 2021, 16:13: PS on. Sources on. TGHT manually tapped up to 10 A. OK. Allow vacuum to stabilize further.
Friday, October 15, 2021, 06:38: Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, October 15, 2021, 21:32: Auto-Cooling @ 1 A per min.
Monday, October 18, 2021, 07:50: Sources, IG1, & turbo pumps off. |
Attachment 1: UC#36.docx
|
|
955
|
Thursday, January 12, 2023, 09:04 |
Aaron Schmidt | | LP-SIS | | | 44691-14 | 44378-20 | In progress | | Test for Aurelia L. Empty LP-SIS w/ end caps in. Right side expanded.
Thermocouples installed (R - L):
X & Y For the (V) checks.
Y - Y
X - O
X - R
L - R
L - O
Datalogger: R= T1 & L=T2
X = TGHT
Y = TBHT
O = Not in use.
Thursday, January 12, 2023, 09:06: Beamline side roughed down & TP on sometime last night. Vacuum @ 2.77e-06T.
Connect volt meters to 4,5 (TBHT) & 6,7 (TGHT)
Thursday, January 12, 2023, 09:43: IG1 Bypass made. TGHT / TBHT at 10 A. Volt meter check. Both display in negatives.
Thursday, January 12, 2023, 09:54: Swapped wires around for both TGHT / TBHT volt meters. OK. Breaker / PS off. Bypass removed.
Thursday, January 12, 2023, 10:14: Roughing.
Thursday, January 12, 2023, 10:16: BV1A open.
Monday, January 16, 2023, 10:25: Sources off. IV4 closed. Turbo pumps off. |
|
848
|
Wednesday, February 10, 2021, 09:49 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-2 / 44378-3 | Failed | Energy spread calibration with SIS | Note* target has a ring on the TGHT - Right leg. EE & PE placed. Target to HS OL - OK.
Wednesday, February 10, 2021, 09:37: Roughing.
Wednesday, February 10, 2021, 09:45: Bypass / Force applied on IG1 to test Anode.
Wednesday, February 10, 2021, 09:46: Anode @ 10 V. Ok.
Wednesday, February 10, 2021, 09:47: Anode @ 200 V. Ok. No current.
Wednesday, February 10, 2021, 09:48: Anode to 0V & off. Bypass / Force removed from IG1.
Wednesday, February 10, 2021, 10:06: TP1B on.
Wednesday, February 10, 2021, 10:46: TP1A on.
Wednesday, February 10, 2021, 13:42: Vacuum @ 9.08e-06T. open FS#5
Wednesday, February 10, 2021, 13:46: Vacuum increased to 9.70e-06T as well as the backing pressure increased. Turbo pumps off. Going to swap the assembly out completely however continue with the same LP-SIS oven.
Wednesday, February 10, 2021, 15:20: HS 44378-3 Installed w/ LP-SIS oven #44691-8. Roughing
Wednesday, February 10, 2021, 15:48: TP1B on.
Wednesday, February 10, 2021, 16:02: TP1A on.
Wednesday, February 10, 2021, 16:11: Bypass / Force applied on IG1 to test Anode. Anode @ 200 V. Ok. No current.
Wednesday, February 10, 2021, 16:13: Anode to 0V & off. Bypass / Force removed from IG1. EZL & EE check ok. IG1 on for real.
Wednesday, February 10, 2021, 16:14: Vacuum @ 6.12e-05T & Dropping.
Wednesday, February 10, 2021, 16:16: FS#5 open. Both IG1 & the backing lines are pumping down quickly.
Contacted MCR. Reminder, mechanical services still intends to service the DI water pump. Constant DI water flow is not guaranteed.
https://elog.triumf.ca/TIS/Test-Stand/847
Thursday, February 11, 2021, 00:13: : Anode to 10V. Auto-ramping TGHT/TBHT to 200/100 A @ 2 A/min
Thursday, February 11, 2021, 09:03: Auto-ramping TGHT/TBHT to 400/200 A @ 2 A/min
From: Jas Uppal <juppal@triumf.ca>Sent: February 11, 2021 9:12 AM
To: Fernando Maldonado Millan <maldonado@triumf.ca>
Subject: Re: Cu-LCW water lines status for the ISAC test stand
Hi Fernando,
There are no plans for Cu-LCW system to be switched off today. I believe they are still working on correcting the issue that caused the trip two days ago. Once it is corrected and we are ready to switch to the secondary pump, the switch over "should" be relatively invisible with possibly a slight drop in line pressure.
Jas Uppal
Thursday, February 11, 2021, 10:31: TGHT/TBHT at 400/200 A. Anode still at 10 V
Thursday, February 11, 2021, 10:33: Auto-ramping TGHT/TBHT to 580/230 A @ 2 A/min
Thursday, February 11, 2021, 10:42: BIAS/EZL/EE @ 30/13/1.5 kV.
Thursday, February 11, 2021, 13:42: Uncapable of holding HV. Maybe the new heatshield needs more time to outgas.
Thursday, February 11, 2021, 13:44: BIAS/EZL/EE @ 0.000 kV
Friday, February 12, 2021, 10:07: In order to trouble shoot the ISAC TS, I let the sparks to continue. Initially, they occurred in the extraction electrode spark gap and were both visible and audible. However, they stop and the instabilitiy was present.
I rise the voltage again and let the spark happen for a longer period of time.
I saw how the collimator wire on the far back of the source tray was moving as if a hurricane was inside, which is very strange. I followed up the wire and I saw how it was sparking to something (see attached photo)
I say something because from the angle is difficult to say if it was going to the chamber itself or to the HS waterlines. Both scenarios are concerning
First of all the collimator is never biased and it if any case the jacket (MHV cable) is on ground ground
In case the discharge happened from wire to the chamber, then the collimator wire was charging up, it is extremely important o note that the jacketed cable goes outside the box very close to one of the turbos.
In the other scenario where the discharge was happening from the wire to the HS waterlines, that is, HV to ground, the simply creating a clearance should be enough. In this case as well is relevant to know that this jackted cable leaves the farday cage.
I will create clearance from collimator wire to HS waterlines.
Friday, February 12, 2021, 10:33: BIAS/EZL/EE @ 0.000 kV
Friday, February 12, 2021, 10:35: Auto-cooling TGHT/TBHT to 0 A @ 4A/min.
Friday, February 12, 2021, 11:05: Discharge confirmed visually to go into the HS waterlines, (HV to ground) (see second photo attached)
Friday, February 12, 2021, 11:06: Inside the blue rack, I could hear ticks that match the discharges, probably the collimator PS is there. Will check later with things off.
Friday, February 12, 2021, 13:17: Turbos off.
Friday, February 12, 2021, 14:36: Venting. |
Attachment 1: spark_inside_chamber_roof.png
|
|
Attachment 2: spark_inside_chamber_front_view.png
|
|
|
843
|
Monday, February 01, 2021, 08:38 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration | Monday, February 01, 2021, 08:38 : The anode seems to be shorted but we can still test the amount of dispersion at the image position, and correlate with energy spread.
Monday, February 01, 2021, 11:27: Bias/EZL/EE @ 30/0/1.5 kV.
Monday, February 01, 2021, 11:44: Mass scan in progress. The peaks appear to be shifted. Large peak at m/q160 and double peak at m/q 100u, where I think it should be 133Cs and 85Rb and 87Rb.
Monday, February 01, 2021, 14:04: HV turned itself off, nothing tripped nor change. Not sure if related to the emittance scan that I was running. Setting it to zero before restarting it.
Monday, February 01, 2021, 20:14: Ramping things down and call it a day. My laptop charger broke and I don't want to leave the HV on.
Wire scanners look fine but the emittance meter was not working. Keiko soft reboot it but to luck.
AS
Tuesday, February 02, 2021, 08:51: E-rig re-calibrated. Mass scans taken. It appears we have evaporated all the salts. Turning off the HV & auto-cooling @ 3A per min.
Tuesday, February 02, 2021, 12:18: IV4 closed, power/sources off. Turbo pumps off.
Tuesday, February 02, 2021, 12:50: Venting.
Remove, add salts, EE ok.
Tuesday, February 02, 2021, 13:58: Rouging.
Tuesday, February 02, 2021, 14:26: Turbo pump on - TP1B.
Tuesday, February 02, 2021, 14:37: Turbo pump on - TP1A. Ion gauge on.
AS
Wednesday, February 03, 2021, 07:36: Vacuum ok @ 1.01e-06 T.
Wednesday, February 03, 2021, 07:38: Opened FS#5. Vacuum ok.
Wednesday, February 03, 2021, 07:41; Power / Sources on. Optics on.
Wednesday, February 03, 2021, 07:43: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Wednesday, February 03, 2021, 07:46: IV4 open
Wednesday, February 03, 2021, 07:48: BIAS / EE / EZL @ 20 / -1.0 / 0 kV to start. will go to 30 & 1.5 kV once the TGHT reaches 350 A.
Wednesday, February 03, 2021, 09:40: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, February 03, 2021, 10:55: BIAS / EE / EZL @ 30 / -1.5 / 0 kV. Lot's of sparks on the initial conditioning from 8:30am until almost 10:20. Appears stable now.
FM
Wednesday, February 03, 2021, 13:01: Spark. The HV bias voltage remained at 10 kV for several seconds. TSG:CBC was @ 2500 V. Likely, a sustained discharge towards the steerer had the HV bias power supply to get current limited
Wednesday, February 03, 2021, 13:25: HV bias power supply gets current limited as of 15 kV. Setpoints to 0 to allow some discharge. Didn't work. Asking someone on site to have a look on the PS.
No sign whatsoever of a spark to any device.
Wednesday, February 03, 2021, 18:27: HV has been erratic all day. Waiting for some stabilization allowed the system to reach ~24 kV. Now it has dropped to 20 kV.
Wednesday, February 03, 2021, 18:28: Increasing current limit on the bias PS from 0.015 to 0.02 mA
Wednesday, February 03, 2021, 18:55: Spark in the water lines. Current drop 60% from 0.03 to 0.01 uA. Spark observed in the GND electrode water lines
Wednesday, February 03, 2021, 19:11: Able to reach 28 kV but a spark ocurred. TSG:CBC adn TSG:Q1 readback 2500 and 1500 V (similarly to the spark at 1 pm). Bias is current limited again, even at the new current limit.
- I think there might a short with one of the steerers cables, or a bit unlikely, to the quad.
- Slow charge up process, that does not discharges.
Wednesday, February 03, 2021, 19:32: Bias/EZL/EE @ 0.000 kV
Wednesday, February 03, 2021, 22:59: Tapped down TGHT/TBHT to 500/200 A to preserve the salts.
AS
Thursday, February 04, 2021, 06:42: Auto-cooling TGHT / TBHT down to 300 / 150 A.
Thursday, February 04, 2021, 09:14: Optics set to standard settings. Checking BIAS w/ EE & EZL
Thursday, February 04, 2021, 09:21: BIAS / EE / EZL to 16.5 / -1.0 / 10 kV. Actual on BIAS 14.5 to 15 kV on BIAS:RDVOL & w/ 0.029 mA on BIAS:RDCUR.
Thursday, February 04, 2021, 09:24: BIAS discharge. 16.5 kV on BIAS:RDVOL & w/ 0.004 mA on BIAS:RDCUR.
Thursday, February 04, 2021, 09:32: Brought BIAS up to 19 kV, but then it sparks and dropped to 13.5 kV on BIAS:RDVOL & w/ 0.029 mA on BIAS:RDCUR. Brought the BIAS down to 13 kV, & the current dropped out, then stabilized. Brought it back up to 16.5 kV. Holding 16.5 kV on BIAS:RDVOL & w/ 0.004 mA on BIAS:RDCUR.
Thursday, February 04, 2021, 09:36: BIAS / EE / EZL to 16.5 / -1.0 / 10 kV
Thursday, February 04, 2021, 09:39: Auto-cooling TGHT / TBHT down to 0 A.
Thursday, February 04, 2021, 09:40: 17 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 09:45: 17.5 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 09:51: 18 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 09:55: 18.5 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 10:00: 19 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 10:14: 19.5 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 10:20: 20 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
FM
Thursday, February 04, 2021, 12:54: 20.5 kV / 0.006 mA
Thursday, February 04, 2021, 12:58: 21 kV / 0.005 mA
Thursday, February 04, 2021, 13:02: 21.5kV / 0.006 mA
Thursday, February 04, 2021, 13:08: 22 kV / 0.005 mA.
Thursday, February 04, 2021, 13:12: 22.5 kV / 0.006 mA.
Thursday, February 04, 2021, 13:58: 30 kV / 0.008 mA.
Thursday, February 04, 2021, 14:04: Spark. Bias is current limited.
Thursday, February 04, 2021, 14:39 : Small bright spot at the TGHT or HS cooling lines from the solder of the GND water lines.
Without voltage this is not noticeable. Likely a corona discharge happening at this location and hence limiting the current.
Opening to create clearance. Also to troubleshot the cathode power supply.
Thursday, February 04, 2021, 16:07: Turbos off. |
Attachment 1: ESC_-_Jan_29_start.docx
|
Attachment 2: ESC_-__Feb_3_start.docx
|
Attachment 3: ER-580-230-30kV-m7.txt
|
value (Voltage offset 40.0000)
71.0000
1.2000
95.0000
29978.0220
21
21
./emit.dat
-0.1279 -0.1059 -0.1047 -0.1093 -0.1065 -0.1126 -0.1224 -0.1303 -0.1080 -0.0192 -0.1056 -0.0919 -0.0830 -0.0922 -0.0891 -0.0870 -0.0900 -0.0864 -0.0824 -0.0824 -0.0790
-0.0888 -0.1001 -0.1016 -0.1047 -0.0961 -0.0842 0.5807 3.4351 3.1683 1.8256 1.0776 -0.0720 -0.0775 -0.0897 -0.0854 -0.0824 -0.0833 -0.0806 -0.0790 -0.0763 -0.0751
-0.0589 -0.0494 0.0848 0.2289 1.4883 1.8115 1.8109 1.9238 2.3145 0.2689 -0.0198 -0.0311 -0.0748 -0.0818 -0.0760 -0.0781 -0.0769 -0.0742 -0.0760 -0.0754 -0.0751
-0.0873 0.4486 0.4468 0.5981 0.4752 0.9253 1.4035 -0.0079 -0.0421 -0.0732 -0.0763 -0.0824 -0.0763 -0.0824 -0.0781 -0.0766 -0.0754 -0.0775 -0.0772 -0.0766 -0.0790
-0.0916 -0.0696 -0.0143 0.0873 0.0195 -0.0186 -0.0217 -0.0769 -0.0818 -0.0797 -0.0766 -0.0830 -0.0781 -0.0833 -0.0732 -0.0757 -0.0781 -0.0763 -0.0742 -0.0757 -0.0760
-0.0879 -0.0739 -0.0839 -0.0806 -0.0607 -0.0653 -0.0671 -0.0769 -0.0842 -0.0763 -0.0748 -0.0864 -0.0754 -0.0839 -0.0754 -0.0781 -0.0778 -0.0754 -0.0735 -0.0781 -0.0757
-0.0885 -0.0742 -0.0772 -0.0912 -0.0732 -0.0690 -0.0650 -0.0751 -0.0867 -0.0729 -0.0757 -0.0833 -0.0726 -0.0833 -0.0769 -0.0790 -0.0800 -0.0739 -0.0745 -0.0754 -0.0726
-0.0879 -0.0751 -0.0861 -0.0854 -0.0775 -0.0723 -0.0763 -0.0748 -0.0797 -0.0729 -0.0748 -0.0824 -0.0748 -0.0839 -0.0763 -0.0775 -0.0769 -0.0757 -0.0772 -0.0745 -0.0760
-0.0903 -0.0748 -0.0815 -0.0839 -0.0757 -0.0757 -0.0766 -0.0729 -0.0806 -0.0748 -0.0772 -0.0821 -0.0760 -0.0858 -0.0748 -0.0772 -0.0763 -0.0757 -0.0760 -0.0748 -0.0778
-0.0894 -0.0742 -0.0827 -0.0851 -0.0748 -0.0757 -0.0806 -0.0751 -0.0803 -0.0766 -0.0766 -0.0839 -0.0757 -0.0839 -0.0729 -0.0778 -0.0790 -0.0757 -0.0778 -0.0754 -0.0766
-0.0867 -0.0748 -0.0797 -0.0900 -0.0748 -0.0766 -0.0766 -0.0732 -0.0824 -0.0757 -0.0735 -0.0839 -0.0748 -0.0821 -0.0751 -0.0781 -0.0772 -0.0754 -0.0745 -0.0769 -0.0729
-0.0906 -0.0763 -0.0833 -0.0836 -0.0760 -0.0772 -0.0726 -0.0757 -0.0842 -0.0739 -0.0769 -0.0821 -0.0720 -0.0812 -0.0775 -0.0797 -0.0781 -0.0739 -0.0745 -0.0751 -0.0742
-0.0897 -0.0769 -0.0830 -0.0848 -0.0769 -0.0830 -0.0711 -0.0641 -0.0693 -0.0616 -0.0717 -0.0824 -0.0751 -0.0839 -0.0754 -0.0757 -0.0763 -0.0748 -0.0775 -0.0726 -0.0760
-0.0891 -0.0775 -0.0784 -0.0833 -0.0723 -0.0690 -0.0626 -0.0443 -0.0488 -0.0531 -0.0650 -0.0803 -0.0748 -0.0845 -0.0766 -0.0800 -0.0781 -0.0766 -0.0742 -0.0745 -0.0760
-0.0891 -0.0735 -0.0797 -0.0806 -0.0601 -0.0580 -0.0464 -0.0269 -0.0400 -0.0461 -0.0601 -0.0815 -0.0784 -0.0845 -0.0745 -0.0769 -0.0769 -0.0754 -0.0751 -0.0760 -0.0760
-0.0879 -0.0708 -0.0739 -0.0763 -0.0577 -0.0519 -0.0302 -0.0204 -0.0412 -0.0458 -0.0620 -0.0800 -0.0751 -0.0827 -0.0745 -0.0781 -0.0775 -0.0732 -0.0739 -0.0748 -0.0729
-0.0854 -0.0684 -0.0757 -0.0729 -0.0558 -0.0476 -0.0293 -0.0211 -0.0378 -0.0458 -0.0626 -0.0815 -0.0757 -0.0812 -0.0763 -0.0800 -0.0766 -0.0748 -0.0757 -0.0742 -0.0732
-0.0839 -0.0693 -0.0665 -0.0702 -0.0540 -0.0473 -0.0308 -0.0278 -0.0439 -0.0494 -0.0638 -0.0781 -0.0751 -0.0833 -0.0748 -0.0775 -0.0754 -0.0742 -0.0769 -0.0751 -0.0739
-0.0888 -0.0714 -0.0739 -0.0659 -0.0562 -0.0452 -0.0385 -0.0275 -0.0391 -0.0516 -0.0641 -0.0803 -0.0742 -0.0845 -0.0763 -0.0757 -0.0769 -0.0760 -0.0757 -0.0751 -0.0766
-0.0876 -0.0717 -0.0708 -0.0735 -0.0565 -0.0522 -0.0372 -0.0302 -0.0458 -0.0507 -0.0632 -0.0793 -0.0772 -0.0842 -0.0739 -0.0748 -0.0769 -0.0769 -0.0726 -0.0763 -0.0751
-0.0879 -0.0696 -0.0751 -0.0708 -0.0571 -0.0507 -0.0436 -0.0323 -0.0458 -0.0513 -0.0632 -0.0824 -0.0745 -0.0821 -0.0763 -0.0797 -0.0778 -0.0751 -0.0763 -0.0745 -0.0757
|
Attachment 4: Er-580-230-30kV-m133.txt
|
value (Voltage offset 40.0000)
71.0000
1.2000
95.0000
29992.6740
21
21
./emit.dat
-0.1190 -0.1062 -0.1035 -0.1089 -0.1074 -0.1050 -0.1096 -0.0970 -0.1050 -0.0665 -0.0964 -0.0970 -0.0916 -0.0961 -0.0967 -0.0894 -0.0906 -0.0851 -0.0882 -0.0815 -0.0797
-0.0842 -0.0989 -0.0964 -0.1019 -0.0986 -0.0983 -0.0769 0.1080 0.2115 0.1575 0.0726 -0.0931 -0.0842 -0.0916 -0.0925 -0.0839 -0.0864 -0.0815 -0.0861 -0.0787 -0.0739
-0.0696 -0.0620 -0.0433 -0.0531 0.0797 0.0943 0.2325 0.3882 0.2945 0.1141 -0.0140 -0.0107 -0.0745 -0.0851 -0.0787 -0.0821 -0.0803 -0.0815 -0.0757 -0.0760 -0.0757
-0.0766 0.0211 0.0204 0.0110 0.0656 0.2075 0.2969 -0.0543 -0.0702 -0.0763 -0.0818 -0.0854 -0.0790 -0.0845 -0.0745 -0.0793 -0.0815 -0.0803 -0.0800 -0.0766 -0.0748
-0.0861 -0.0754 -0.0266 0.0339 -0.0183 -0.0644 -0.0635 -0.0787 -0.0842 -0.0818 -0.0803 -0.0858 -0.0806 -0.0854 -0.0769 -0.0812 -0.0803 -0.0751 -0.0745 -0.0751 -0.0778
-0.0848 -0.0763 -0.0909 -0.0842 -0.0702 -0.0797 -0.0885 -0.0793 -0.0845 -0.0800 -0.0803 -0.0876 -0.0803 -0.0873 -0.0769 -0.0839 -0.0815 -0.0754 -0.0757 -0.0751 -0.0751
-0.0845 -0.0732 -0.0928 -0.0906 -0.0748 -0.0812 -0.0897 -0.0778 -0.0815 -0.0797 -0.0815 -0.0861 -0.0793 -0.0864 -0.0757 -0.0833 -0.0800 -0.0739 -0.0748 -0.0757 -0.0748
-0.0824 -0.0763 -0.0912 -0.0861 -0.0739 -0.0812 -0.0784 -0.0763 -0.0797 -0.0790 -0.0809 -0.0854 -0.0824 -0.0864 -0.0784 -0.0800 -0.0806 -0.0790 -0.0757 -0.0757 -0.0751
-0.0842 -0.0778 -0.0906 -0.0900 -0.0772 -0.0821 -0.0839 -0.0751 -0.0797 -0.0824 -0.0800 -0.0858 -0.0821 -0.0848 -0.0760 -0.0806 -0.0812 -0.0763 -0.0812 -0.0754 -0.0751
-0.0836 -0.0757 -0.0824 -0.0873 -0.0787 -0.0763 -0.0809 -0.0769 -0.0830 -0.0830 -0.0833 -0.0879 -0.0815 -0.0867 -0.0732 -0.0818 -0.0824 -0.0763 -0.0766 -0.0748 -0.0763
-0.0854 -0.0751 -0.0931 -0.0949 -0.0760 -0.0772 -0.0894 -0.0803 -0.0827 -0.0812 -0.0809 -0.0876 -0.0793 -0.0854 -0.0748 -0.0858 -0.0824 -0.0748 -0.0757 -0.0748 -0.0742
-0.0830 -0.0723 -0.0931 -0.0937 -0.0729 -0.0809 -0.0894 -0.0778 -0.0800 -0.0775 -0.0803 -0.0867 -0.0812 -0.0861 -0.0760 -0.0824 -0.0806 -0.0757 -0.0745 -0.0757 -0.0751
-0.0815 -0.0754 -0.0925 -0.0885 -0.0735 -0.0787 -0.0854 -0.0751 -0.0797 -0.0793 -0.0815 -0.0861 -0.0809 -0.0854 -0.0769 -0.0815 -0.0778 -0.0735 -0.0757 -0.0754 -0.0754
-0.0790 -0.0763 -0.0867 -0.0928 -0.0748 -0.0769 -0.0867 -0.0748 -0.0797 -0.0790 -0.0812 -0.0870 -0.0818 -0.0885 -0.0739 -0.0790 -0.0815 -0.0751 -0.0772 -0.0748 -0.0732
-0.0848 -0.0726 -0.0894 -0.0851 -0.0751 -0.0751 -0.0781 -0.0726 -0.0824 -0.0812 -0.0809 -0.0870 -0.0800 -0.0867 -0.0717 -0.0800 -0.0824 -0.0745 -0.0751 -0.0735 -0.0751
-0.0827 -0.0735 -0.0928 -0.0934 -0.0748 -0.0809 -0.0900 -0.0726 -0.0815 -0.0778 -0.0803 -0.0864 -0.0800 -0.0861 -0.0745 -0.0815 -0.0818 -0.0751 -0.0717 -0.0739 -0.0766
-0.0815 -0.0748 -0.0891 -0.0854 -0.0735 -0.0754 -0.0781 -0.0739 -0.0790 -0.0760 -0.0806 -0.0854 -0.0806 -0.0845 -0.0763 -0.0824 -0.0790 -0.0739 -0.0745 -0.0772 -0.0745
-0.0818 -0.0757 -0.0925 -0.0870 -0.0723 -0.0760 -0.0809 -0.0729 -0.0769 -0.0784 -0.0809 -0.0848 -0.0769 -0.0873 -0.0763 -0.0818 -0.0781 -0.0751 -0.0769 -0.0769 -0.0742
-0.0842 -0.0742 -0.0916 -0.0867 -0.0729 -0.0751 -0.0748 -0.0720 -0.0745 -0.0806 -0.0827 -0.0864 -0.0821 -0.0867 -0.0748 -0.0790 -0.0800 -0.0757 -0.0760 -0.0757 -0.0745
-0.0845 -0.0742 -0.0906 -0.0839 -0.0720 -0.0742 -0.0748 -0.0732 -0.0803 -0.0784 -0.0793 -0.0842 -0.0784 -0.0854 -0.0735 -0.0800 -0.0812 -0.0754 -0.0754 -0.0732 -0.0748
-0.0845 -0.0732 -0.0912 -0.0876 -0.0729 -0.0766 -0.0809 -0.0729 -0.0803 -0.0781 -0.0772 -0.0854 -0.0772 -0.0830 -0.0745 -0.0812 -0.0803 -0.0742 -0.0735 -0.0735 -0.0754
|
|
840
|
Thursday, January 21, 2021, 10:10 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration - SIS with TBHT negatively biased | Thursday, January 21, 2021, 10:05: Anodeless Negative Bias On Surface Ion Source, or ANBOSIS (still working on the acronym). installed to test energy spread vs position.
The SIS allow a more forgiving operation while calibrating such that other sources can have these type of measurements.
Thursday, January 21, 2021, 10:43: Electrical connection make sense inside the source tray both with and without TIS. Anode confirmed to be on HV common through 9-pin.
Thursday, January 21, 2021, 10:46: Roughing.
Thursday, January 21, 2021, 11:17: Turbos on.
Thursday, January 21, 2021, 11:25: IG1 on.
Thursday, January 21, 2021, 12:52: IG1@2.67e-5 T
AS
Friday, January 22, 2021, 07:04: Vacuum @ 4.57e-06T.
Friday, January 22, 2021, 07:07: FS#2 open. Vacuum ok @ 4.57e-06T
Friday, January 22, 2021, 07:13: FS#3 Open. Vacuum ok @ 4.57e-06T
Friday, January 22, 2021, 07:24: FS#4 Open. Vacuum ok @ 4.48e-06T
Friday, January 22, 2021, 07:30: FS#5 Open. Vacuum ok @ 4.48e-06T
Friday, January 22, 2021, 07:39: Reboot IOC (Optics page has a white out)
Friday, January 22, 2021, 07:44: Power / Sources on.
Friday, January 22, 2021, 07:49: Reboot PLC / IOC again. Surface source page ok. Optics page still in white out.
Friday, January 22, 2021, 07:52: Controls to TGHT / TBHT non-responsive. 10 / 5 A on TGHT / TBHT @ 0 / 0 A on epics & the PS.
Friday, January 22, 2021, 08:15: Tested HV. OK on both EZL & BIAS w/ 500 V each, then back to 0 V. TGHT / TBHT still not responding.
AS
Friday, January 29, 2021, 09:52: TS checks ok. Fixed. TGHT / TBHT @ 10 A each. BIAS / EE / EZL @ 500 / -200 / 300 V to check.
https://elog.triumf.ca/TIS/Test-Stand/842
Friday, January 29, 2021, 09:53: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Friday, January 29, 2021, 10:05: BIAS / EE / EZL @ 30 /-1.5/13 kV.
Friday, January 29, 2021, 10:08: Lot's of sparking*** Reduce BIAS / EE / EZL to 20 / -1.5 / 10 kV.
FM
Friday, January 29, 2021, 11:24: BIAS / EE / EZL @ 29 /-1.5/13 kV.. No Sparks. Ramping up to 30 kV in steps of 100V.
Friday, January 29, 2021, 11:28: Reached 30kV on bias. No sparks after 2 minutes. Previously, the sparks happened within seconds after reaching 30 kV, according to the striptool.
Friday, January 29, 2021, 11:41: There were five inaudible sparks. They are likely occurring inside as the target-ion source is being heated. Small rise in vacuum occurred and then the spark started.
Friday, January 29, 2021, 11:42: BIAS / EE / EZL to 0.000 kV to allow outgassing
Friday, January 29, 2021, 12:44 Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.
Friday, January 29, 2021, 13:32: TGHT/TBHT @500/200 A.
Friday, January 29, 2021, 13:44. Spark on top.
Friday, January 29, 2021, 13:48 : BIAS / EE / EZL @ 30 /-1.5/13 kV.
Friday, January 29, 2021, 13:49: Anode gets current limited even at 1 V. Could this indicate a short, or that the anode is floating?
Friday, January 29, 2021, 13:53: Spark across extraction electrode spark gap.
Friday, January 29, 2021, 14:13: Auto-ramping TBHT to 225 A @ 3 A per min.
Friday, January 29, 2021, 14:32: 10 min ago, the IG6 timed out. Nothing tripped but the epics couldn't restarted. Manually turned Fil1 on controller but didn't work. Fil2 did the trick. Back to normal.
Friday, January 29, 2021, 14:42: Spark gap again. It turned the separator section yellow (except MB1)"
Friday, January 29, 2021, 15:08: Auto-ramping TGHT to 580 A @ 2 A per min. Good vac level set to 3.5e-7T
Friday, January 29, 2021, 15:17: Inaudible spark. First spark after 25 min.
Friday, January 29, 2021, 15:30: Playing with TBHT current. Couple of sparks when playing with the steerers and einzel lens. TGHT auto-ramp waiting for good vacuum.
Friday, January 29, 2021, 16:25: Vacuum reached bad vaccum level. Currentes were step back. No sparks for around 40 minutes.
Friday, January 29, 2021, 16:41: System seems to be dirty. It will likely take the weekend to reach nominal vacuum levels.
I will reduce the HV and keep the heaters on. I will keep an eye during the weekend.
Friday, January 29, 2021, 16:44: 50 minutes without sparks
Friday, January 29, 2021, 16:46: BIAS / EE / EZL to 0.000 kV to allow outgassing during the weekend.
Saturday, January 30, 2021, 11:59: Vacuum has steadily decrease over time allowing the auto ramp-up routine to make progress.
Saturday, January 30, 2021, 12:00 IG1 @ 3.58e-6T . TGHT/TBHT @ 566/230 A. All voltage still at 0 V.
Saturday, January 30, 2021, 12:56: TGHT/TBHT @ 580/230 A.
Sunday, January 31, 2021, 09:32: TGHT/TBHT @ 580/230 A. IG1@2.59e-6T.
Sunday, January 31, 2021, 10:48: BIAS / EE / EZL @ 30 /-1.5/13 kV. No sparks on the way up. Beam is now noticeable on the wire scanners, When I first tried with colder target current no beam.
Sunday, January 31, 2021, 13:31: After around 3 hours, only two sparks have occurred.
Sunday, January 31, 2021, 13:54: Spark. All of them seem to be going to EZL.
Sunday, January 31, 2021, 15:13: Spark. Separators optics turned yellow.
Sunday, January 31, 2021, 15:38: Spark.
Sunday, January 31, 2021, 16:11: Things were looking good so i decided t o try a mass scan , however a series of sparks started. I set all biases to 0 and stop the tests for today. |
|
842
|
Friday, January 29, 2021, 09:13 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | In progress | TS settings ok. | Friday, January 29, 2021, 09:11: CANBUS controller was replaced. Quick systems check ok. Sources, HV, & Optics all good.
Friday, January 29, 2021, 10:05: HV & Ramping check.
Friday, January 29, 2021, 10:08:
|
|
845
|
Thursday, February 04, 2021, 19:22 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration with SIS | See e-log entry: 884:
Thursday, February 04, 2021, 18:45: Roughing
Thursday, February 04, 2021, 19:13: Turbos on.
Thursday, February 04, 2021, 19:22: IG1 on.
AS
Friday, February 05, 2021, 06:20: Waterline FS#5 open. Vacuum ok @ 1.71e-06T.
Friday, February 05, 2021, 06:23:
Friday, February 05, 2021, 06:26: Tried to put 100 - 1000 V on the BIAS. Goes to 0.0 kV - BIAS:RDVOL / 0.029 mA - BIAS:RDCUR, straight to current limit. BIAS is shorted.
Friday, February 05, 2021, 06:32: Power / Sources / Optics off. Ion gauge & Turbo pumps off.
Friday, February 05, 2021, 07:28: Venting.
Friday, February 05, 2021, 08:37: Roughing. Target was re-salted. GE line was close/light touch to (B) line. Adjusted. Waterlines open on FS#5.
Friday, February 05, 2021, 09:06; Turbo pump TP1B on.
Friday, February 05, 2021, 09:14: Turbo pump TP1A on
Friday, February 05, 2021, 09:19: TP1A tripped. Wait on backing pressure.
Friday, February 05, 2021, 09:35: Vacuum Bypass on BV1A to turn on TP1A.
Friday, February 05, 2021, 09:39: TP1A at speed. Ion gauge on. Bypass removed.
Friday, February 05, 2021, 09:55: IG1 off. Bypass used on IG1. EE on, BIAS on.
Friday, February 05, 2021, 09:56: 500 - 1000 V - BIAS:RDVOL / 0.000 mA - BIAS:RDCUR. Ok.
Friday, February 05, 2021, 09:58: BIAS & EE off. Bypass removed. IG1 back on. Initial check ok. Vacuum to go below 1.0e-05T.
Friday, February 05, 2021, 11:37: Power / Sources / Optics on & set. Vacuum @ 6.46e-06T.
Friday, February 05, 2021, 11:42: BIAS / EE / EZL @ 10 / -1.0 / 7.5 kV
Friday, February 05, 2021, 11:50: BIAS / EE / EZL @ 20 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A.
Friday, February 05, 2021, 11:58: BIAS / EE / EZL @ 25 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A. Anode checked up to 100 V & down again. Ok.
Friday, February 05, 2021, 12:06: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A.
Friday, February 05, 2021, 12:14: BIAS / EE / EZL @ 35 / -1.5 / 13.5 kV. TGHT / TBHT @ 10 / 10 A.
Friday, February 05, 2021, 12:24: It charged up and began sparking continuously around 12:23.
Friday, February 05, 2021, 12:33: BIAS / EE / EZL @ 15 / -1.0 / 10 kV. TGHT / TBHT @ 10 / 10 A. The sparks were both clearly audible & visible on the spark gap up top (Image to be included in word doc)
FM
Friday, February 05, 2021, 14:16: BIAS / EE / EZL @ 30/ -1.5 / 13 kV. Anode @ 50 V.
Friday, February 05, 2021, 14:18: Auto ramp-up TGHT/TBHT to 580/230 A @ 4A/min
Friday, February 05, 2021, 15:08: Anode shorted, I think the tube heater is touching the plasma electrode. TGHT/TBHT @ 209/209 A. TBHT voltage= 2.2. At the same time the bias current jump from 0.008 to 0.01.
Friday, February 05, 2021, 15:12: Reducing the TBHT to 190 A 2 V. Bias current linearly reducing with tbht current. The cathode is not current limited anymore. Wondering if the TBHT power supply is causing an electrical backflow or if the ion source is touching the plasma electrode.
Friday, February 05, 2021, 15:16: Auto ramp-up TGHT/TBHT to 580/230 A @ 2 A/min
Friday, February 05, 2021, 15:21: The same effect as before at TBHT=223 A. When reducing to 190 A, anode goes up.
Friday, February 05, 2021, 15:30: Auto ramp-up TGHT to 580 A @ 4A/min and TBHT to 230 @ 1 A/min.
Friday, February 05, 2021, 15:55: Sparks, not audible nor visible. I think I saw one on the top part of the water blocks. Lowering bias to 10 kV.
Friday, February 05, 2021, 15:56 : Auto-ramp range to 4A/min on both TGHT and TBHT
Friday, February 05, 2021, 19:23: almost 2.5 hours without sparks. RPM tests performed. Voltages to zero. Will rise later or tomorrow remotely.
Taped down to 180/500 A on TBHT/TGHT. All voltages to BIAS / EE / EZL @ 0.000 kV.
Saturday, February 06, 2021, 11:14: Auto ramp-up TGHT/TBHT to 580/230 A @ 4A/min
Saturday, February 06, 2021, 12:16: BIAS / EE / EZL @ 30/ 1.5 / 0kV.
Saturday, February 06, 2021, 12:30: The previous tune is not working anymore. I have to re-tune . EZL now helps to have a better tune, no need for extreme steering
Well well well, after several scans I observed the following:
- Bias readback changes by 14 V. This doesn't necessarily means this is the absolute value, it could be better or worse.
- Magnet oscillates around 1 gauss, enough to move the beam to the sides.
- Different settings on the rpm scans does not yield to different results in the data
- Intensity variations causes one of the rpms scans to be lower or higher.
- Total source scans are always mirrored as long as nothing else varies.
- Separated ion scans varied wildly. No two consecutive scans are the same. Likely a combination of Bias voltage and magnet current ripples.
- Following Baartman's proceedure on a cherry-picked data set, I estimated an energy spread of 11.75 eV. To be discussed with him
Saturday, February 06, 2021, 20:00 Biases to 0.000 kV
Saturday, February 06, 2021, 20:00 : Auto-cooling TGHT/TBHT to 400/150 A @ 3 A/min
Saturday, February 06, 2021, 21:02: On the way down, TBHT 150 A and when TGHT cross 480 A the anode came back to life. Wonder if this could help diagnose deflection on the surface ion source (might be helpful for the P2N)
Sunday, February 07, 2021, 08:26: Auto ramp-up TGHT/TBHT to 560/210 A @ 2A/min
Sunday, February 07, 2021, 09:18: Anode got current limited again when TGHT/TBHT @ 446/200 A
Sunday, February 07, 2021, 11:26: Auto ramp-up TGHT/TBHT to 560/210 A @ 2A/min
Sunday, February 07, 2021, 11:31: Once again, the latest tune did not work. I suspect the ion source deformation varied from thermal cycle to thermal cycle. With a crooked beam, the EZL will send the beam off-center and the quad will not compensate that. The double peak observed in the beam size scan indicates that the focusing is not correct.
Sunday, February 07, 2021, 18:41: With Baartman RPM scans, the x axis in in cm, as verified with an emittance scan.
New parameters on the emittance rig for this tune. Offset from 40 to -50. This shifts the phase space in the y axis such that is visible on the plot.
Even in a different mass, the position scans on the dispersion plan are not reproducible.
Sunday, February 07, 2021, 18:52: Auto-cooling TGHT/TBHT to 400/150 A @ 6A/min / 3 A/min, respectively.
Sunday, February 07, 2021, 18:53: Biases to 0.000 kV
I think the fast cool-down rate prevented the TBHTto be able to sustained voltage.
Sunday, February 07, 2021, 19:35: Auto-cooling TGHT/TBHT to 0 A @ 3A/min
TBHT able to sustain voltage once TBHT=191 A and TGHT=372 A
Monday, February 08, 2021, 07:14: IV4 close
Monday, February 08, 2021, 07:15: IG1 off. Turbos off. |
Attachment 1: ESC_-_Feb_5_Start.docx
|
|
846
|
Monday, February 08, 2021, 09:20 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration with SIS. No PE | Re-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17: Roughing.
Monday, February 08, 2021, 09:46: TP1B on
Monday, February 08, 2021, 11:45: Vacuum @ 6.70e-06T. Open waterlines
Monday, February 08, 2021, 11:49: Vacuum spike. Turn off IG1 & turbo pumps. Will vent to swap gaskets.
Monday, February 08, 2021, 12:45: Venting.
Swap & tighten.
Monday, February 08, 2021, 13:33: Roughing
Monday, February 08, 2021, 14:01: TP1B on.
Monday, February 08, 2021, 14:18: TP1A on.
Monday, February 08, 2021, 14:22: Opened waterline. Vacuum was in the e-05T range and dropping however it slowed and a spike was noted on CG1A & CG1B. Turbo pumps off to vent. Will inspect the seal face.
Monday, February 08, 2021, 15:08: Venting.
Monday, February 08, 2021, 15:57: Swapped out gaskets. Checked gasket faces & Re-installed HS. Roughing.
Monday, February 08, 2021, 16:44: TP1B on.
Monday, February 08, 2021, 16:51: TP1A on.
Monday, February 08, 2021, 16:58: IG1 on
Monday, February 08, 2021, 17:00: Opened waterlines. Backing pressure ok, Vacuum continuing to improve@ 7.90e-05T.
Monday, February 08, 2021, 17:03: Power/sources on. vacuum @ 5.19e-05T
FM
Tuesday, February 09, 2021, 00:46: IG1 @ 2.14e-6T. Auto-ramping to 580/230 @ 2A/min
Tuesday, February 09, 2021, 07:17. Anode got current limited again when TBHT/TGHGT were @ 215/215 A.
AS
Tuesday, February 09, 2021, 08:32: BIAS / EE / EZL @ 20 / -1.5 / 10 kV
Tuesday, February 09, 2021, 09:02: BIAS / EE / EZL @ 30 / -2.0 / 13 kV
Tuesday, February 09, 2021, 09:16: BIAS remains @ 30 kV. Adjusting Optics, EE, & EZL to tune. Minimal beam on FC0 noted.
Tuesday, February 09, 2021, 10:02: HV off. Check Anode & down stream.
Tuesday, February 09, 2021, 10:36: Auto-cooling @ 4 A per min
Tuesday, February 09, 2021, 10:40: Aborted. TGHT / TBHT back to 580 / 230 A. A few more checks.
Tuesday, February 09, 2021, 10:58: Auto-cooling @ 4 A per min
Tuesday, February 09, 2021, 11:08: HV off.
Tuesday, February 09, 2021, 13:41: Power / sources off. FS#5 closed off. Turbo pumps off.
FM.
After inspecting the ion source, and revising the electrical connections, I suspect that the TBHT was floating all the time and only when it was in contact with the plasma electrode it held HV.
When the plasma electrode was removed, there was no reference whatsoever, and the ions were not extracted.
It seems then that the resistor R4 (ISK4562D) is necessary to provide a reference to the TBHT in a similar way R1 provides one to extraction electrode.
Tuesday, February 09, 2021, 20:52: Installing R4. If the anode works this time, it will be worth checking why this reference is necessary. From the electric diagram, the chassis ground should be HV ground.
|
Attachment 1: ESC_-_Feb_8_Start.docx
|
|
930
|
Tuesday, May 31, 2022, 13:35 |
Aaron Schmidt | UCx HS | | ITW | TM2 | | 44378-19 | In progress | Conditioning UC#38 assembly | Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B on.
Tuesday, May 31, 2022, 14:06: TP1A on.
Tuesday, May 31, 2022, 14:13: IG1 on.
Wednesday, June 01, 2022, 07:41: Vacuum @ 2.13e-06T. Waterline FS#5 open.
Wednesday, June 01, 2022, 07:43: Power/Sources on.
Wednesday, June 01, 2022, 07:51: Auto-ramping TGHT to 580A @ 2A per min.
Monday, June 06, 2022, 07:09: Auto-cooling @ 2A per min.
Wednesday, June 08, 2022, 07:07: Turbo pumps off.
Wednesday, June 08, 2022, 07:53: Venting. |
|
932
|
Saturday, June 18, 2022, 10:04 |
Aaron Schmidt | SiC#43 | HP-FEBIAD | ITW | TM2 | 42464-1 | 44378-16 | In progress | Conditioning SiC#43 | Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on.
Saturday, June 18, 2022, 10:41: TP1B on.
Saturday, June 18, 2022, 10:48: TP1A on.
Saturday, June 18, 2022, 10:55: IG1 on.
Saturday, June 18, 2022, 11:13: Gases on. Cage closed up. SV5 remains on. SV4 (Argon tank) Closed.
Saturday, June 18, 2022, 11:14: Vacuum @ 2.49e-05T.
Saturday, June 18, 2022, 11:15: Waterline FS#5 opened.
Saturday, June 18, 2022, 11:22: Electrical check w/ IG1 bypass
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Saturday, June 18, 2022, 11:23: All checks clear. Bypass removed. Ready for remote operation. Vacuum @ 2.14e-05T
Saturday, June 18, 2022, 21:34: Sources on. Vacuum @ 3.38e-06T. IV4 open.
Saturday, June 18, 2022, 21:36: Optics on. Standard tune.
Saturday, June 18, 2022, 22:24: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min to out gas overnight.
Saturday, June 18, 2022, 22:55: BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V. Coil @ 10 A. Low settings left as a general electrical check to run as the target heats up.
Sunday, June 19, 2022, 16:37: Vacuum @ 1.60e-06T.
Sunday, June 19, 2022, 16:40: Open SV4 (Argon gas - W/ quick steps on procedure). Vacuum ok.
Sunday, June 19, 2022, 16:42: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Sunday, June 19, 2022, 19:48: BIAS / EE / EZL / Anode @ 0. Coil to 0.
Sunday, June 19, 2022, 19:59: Anode tapped up manually to 400 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Anode tapped up manually to 0 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Coil tapped up manually to 100 A @ approx 1 A per second.
Sunday, June 19, 2022, 20:15: Full Trip. Vacuum limit passed. TGHT / TBHT Went to 0 A
Sunday, June 19, 2022, 20:17: TGHT / TBHT @ 580 / 290 A.
Sunday, June 19, 2022, 20:31: Stable. Vacuum @ 4.21e-06T.
Sunday, June 19, 2022, 20:58: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V.
Sunday, June 19, 2022, 21:00: Coil @ 10 A. Vacuum @ 3.49e-06T.
Sunday, June 19, 2022, 21:07: Begin mass & wire scans.
Sunday, June 19, 2022, 21:39: Scans complete.
Monday, June 20, 2022, 05:58: Further mass, wire, & emittance scans.
Monday, June 20, 2022, 06:29: Coil @ 40 A, Anode @ 300 V. Optics set to FM tune.
Monday, June 20, 2022, 06:59: Scans complete. Auto-cooling @ 3 A per min.
Monday, June 20, 2022, 07:03: Coil & Anode to 0 A / 0 V.
Monday, June 20, 2022, 07:07: BIAS / EE / EZL @ 0 kV.
Monday, June 20, 2022, 10:12: IV4 closed.
Monday, June 20, 2022, 10:13: Gases closed. IG1 off. Turbo pumps off.
Monday, June 20, 2022, 11:09: Venting. |
Attachment 1: SiC#43_Conditioning_-_R.docx
|
Attachment 2: ER-580-290-30kV-m27.txt
|
value (Voltage offset 40.0000)
75.0000
1.0000
95.0000
29978.0220
21
21
./emit.dat
-0.0726 -0.0821 -0.0858 -0.0894 -0.0873 -0.0873 -0.0912 -0.0885 -0.0919 -0.0919 -0.0873 -0.0925 -0.0922 -0.0900 -0.0919 -0.0931 -0.0900 -0.0897 -0.0931 -0.0766 -0.0845
-0.0732 -0.0824 -0.0839 -0.0903 -0.0830 -0.0909 -0.0882 -0.0903 -0.0909 -0.0940 -0.0891 -0.0912 -0.0900 -0.0922 -0.0894 -0.0919 -0.0909 -0.0873 -0.0916 -0.0735 -0.0851
-0.0705 -0.0677 -0.0647 -0.0836 -0.0793 -0.0708 -0.0735 -0.0797 -0.0894 -0.0854 -0.0684 -0.0717 -0.0916 -0.0717 -0.0702 -0.0873 -0.0751 -0.0684 -0.0696 -0.0723 -0.0803
-0.0720 -0.0677 -0.0708 -0.0830 -0.0842 -0.0684 -0.0711 -0.0833 -0.0909 -0.0873 -0.0742 -0.0787 -0.0909 -0.0748 -0.0693 -0.0900 -0.0763 -0.0745 -0.0742 -0.0732 -0.0827
-0.0723 -0.0705 -0.0748 -0.0830 -0.0861 -0.0775 -0.0714 -0.0821 -0.0894 -0.0876 -0.0732 -0.0818 -0.0919 -0.0726 -0.0732 -0.0955 -0.0766 -0.0766 -0.0754 -0.0732 -0.0827
-0.0739 -0.0720 -0.0778 -0.0833 -0.0848 -0.0845 -0.0739 -0.0842 -0.0894 -0.0854 -0.0742 -0.0821 -0.0909 -0.0729 -0.0848 -0.0888 -0.0757 -0.0735 -0.0739 -0.0754 -0.0800
-0.0732 -0.0732 -0.0735 -0.0833 -0.0833 -0.0864 -0.0726 -0.0830 -0.0861 -0.0864 -0.0748 -0.0809 -0.0897 -0.0702 -0.0870 -0.0900 -0.0754 -0.0720 -0.0726 -0.0745 -0.0766
-0.0720 -0.0729 -0.0763 -0.0812 -0.0833 -0.0815 -0.0739 -0.0839 -0.0894 -0.0885 -0.0787 -0.0824 -0.0891 -0.0757 -0.0867 -0.0937 -0.0769 -0.0751 -0.0766 -0.0739 -0.0812
-0.0711 -0.0708 -0.0729 -0.0821 -0.0836 -0.0800 -0.0763 -0.0790 -0.0894 -0.0873 -0.0729 -0.0754 -0.0916 -0.0732 -0.0848 -0.0885 -0.0769 -0.0757 -0.0778 -0.0690 -0.0800
-0.0708 -0.0705 -0.0729 -0.0842 -0.0851 -0.0827 -0.0775 -0.0827 -0.0891 -0.0885 -0.0726 -0.0787 -0.0934 -0.0726 -0.0815 -0.0937 -0.0757 -0.0739 -0.0809 -0.0739 -0.0784
-0.0729 -0.0714 -0.0732 -0.0845 -0.0845 -0.0803 -0.0772 -0.0836 -0.0876 -0.0879 -0.0723 -0.0797 -0.0909 -0.0739 -0.0827 -0.0897 -0.0775 -0.0748 -0.0705 -0.0735 -0.0760
-0.0739 -0.0739 -0.0720 -0.0873 -0.0830 -0.0806 -0.0766 -0.0839 -0.0851 -0.0873 -0.0745 -0.0803 -0.0894 -0.0754 -0.0833 -0.0903 -0.0769 -0.0729 -0.0751 -0.0739 -0.0784
-0.0714 -0.0754 -0.0732 -0.0864 -0.0827 -0.0818 -0.0790 -0.0836 -0.0882 -0.0879 -0.0778 -0.0809 -0.0903 -0.0739 -0.0827 -0.0922 -0.0760 -0.0751 -0.0803 -0.0739 -0.0839
-0.0729 -0.0720 -0.0732 -0.0888 -0.0854 -0.0827 -0.0766 -0.0830 -0.0916 -0.0864 -0.0748 -0.0836 -0.0900 -0.0714 -0.0778 -0.0922 -0.0742 -0.0742 -0.0809 -0.0726 -0.0809
-0.0681 -0.0720 -0.0723 -0.0848 -0.0851 -0.0800 -0.0760 -0.0824 -0.0885 -0.0864 -0.0729 -0.0809 -0.0906 -0.0739 -0.0824 -0.0909 -0.0748 -0.0717 -0.0894 -0.0748 -0.0797
-0.0717 -0.0711 -0.0745 -0.0815 -0.0842 -0.0836 -0.0745 -0.0845 -0.0894 -0.0885 -0.0726 -0.0790 -0.0900 -0.0742 -0.0790 -0.0922 -0.0742 -0.0732 -0.0742 -0.0745 -0.0751
-0.0684 -0.0720 -0.0745 -0.0848 -0.0812 -0.0815 -0.0775 -0.0851 -0.0888 -0.0897 -0.0751 -0.0821 -0.0922 -0.0742 -0.0775 -0.0919 -0.0763 -0.0739 -0.0711 -0.0754 -0.0775
-0.0693 -0.0745 -0.0732 -0.0879 -0.0851 -0.0818 -0.0751 -0.0830 -0.0894 -0.0873 -0.0772 -0.0815 -0.0916 -0.0745 -0.0812 -0.0916 -0.0751 -0.0745 -0.0790 -0.0720 -0.0784
-0.0696 -0.0717 -0.0742 -0.0870 -0.0827 -0.0809 -0.0754 -0.0864 -0.0888 -0.0861 -0.0729 -0.0827 -0.0925 -0.0720 -0.0766 -0.0922 -0.0726 -0.0726 -0.0793 -0.0742 -0.0797
-0.0687 -0.0723 -0.0742 -0.0836 -0.0815 -0.0772 -0.0757 -0.0836 -0.0842 -0.0870 -0.0735 -0.0797 -0.0891 -0.0745 -0.0751 -0.0919 -0.0705 -0.0745 -0.0812 -0.0745 -0.0763
-0.0696 -0.0720 -0.0748 -0.0854 -0.0842 -0.0809 -0.0781 -0.0836 -0.0885 -0.0897 -0.0745 -0.0797 -0.0922 -0.0754 -0.0772 -0.0912 -0.0732 -0.0742 -0.0696 -0.0742 -0.0806
|
Attachment 3: SiC#43.docx
|
|
947
|
Wednesday, November 23, 2022, 13:52 |
Aaron Schmidt | | | | | | 44378-14 | In progress | FEBIAD Coil Tests | Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 FS#5 on (HS bypassed with a water loop)
Wednesday, November 23, 2022, 13:55: TSG:IG1 Bypass on
Wednesday, November 23, 2022, 14:03: Signage up. Main breaker on.
Wednesday, November 23, 2022, 14:07: FS#5 off & purged. Not needed.
Wednesday, November 23, 2022, 15:01: measured magnetic field of coil at 8A
end test
Monday, November 28, 2022, 11:45: start test set up the hall probe with the jig to move it on the table and centered the hall probe in the magnet. signage up Main breaker on
Monday, November 28, 2022, 13:17: start collecting data at 8 amps
Monday, November 28, 2022, 16:11: end test
Tuesday, November 29, 2022, 10:50:Signage up Main Breaker on Testing started; with current of 8 amps
Taking measurements of temperature at 8A 9A and 10A
Tuesday, November 29, 2022, 15:25 : system locked out and took out magnet
end test
Wednesday, November 30, 2022, 12:40: Test started. Breaker on. signage up. put in low profile magnet with wire ties to keep coils together.
taking data with 8A of current
Wednesday, November 30, 2022, 16:25: end of test power supply off breaker off
|
|