Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 44 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assemblyConditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only).
  
  936   Thursday, July 07, 2022, 16:52 Aaron Schmidt LP-IG-LISITWTM2 42132-3In progressConditioning UC#39 assemblyNo UCx target installed. Straight / blank
oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
  
  930   Tuesday, May 31, 2022, 13:35 Aaron SchmidtUCx HS ITWTM2 44378-19In progressConditioning UC#38 assemblyUsing a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B
  
  903   Thursday, October 14, 2021, 10:13 Aaron Schmidt LP-SISITWTM2 44378-22In progressConditioning UC#36 HSTube / TGHT only.
Thursday, October 14, 2021, 10:11:
Roughing.
 UC#36.docx 
  901   Monday, October 04, 2021, 15:38 Aaron Schmidt LP-IG-LISITETM4 42132-7In progressConditioning UC#35 IG-LIS HSMonday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08:
TP1B on. 
 UC#35.docx 
  718   Tuesday, April 23, 2019, 14:39 Aaron Schmidt LP-SIS   42752-8DoneConditioning UC#28 HS Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo
pumps started.
 TS-2019-04-24-07-30.rgaUC#28_HS.docx 
  717   Monday, April 15, 2019, 14:42 Aaron Schmidt LP-SIS   42972-1DoneConditioning UC#27 HS & test FS#3New coil lines installed for P2N testing
later.
Monday, April 15, 2019, 14:15: Roughing.
 UC#27_&_FS#3_check.docxTS-2019-04-16-08-20.rga 
  1028   Tuesday, November 05, 2024, 16:40 Brady BorrmannUC #24D (Assembly only)LP-IG-LIS   44972-5 / 42972-9In progressConditioning UC#24D Assembly42972-5 Base / 42972-9 Lid
  
  761   Wednesday, October 02, 2019, 13:42 Aaron Schmidt LP-SIS  41790-943515-9In progressConditioning UC#(30) HSWednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13:
Turbo Pumps started.
 UC#30.docx 
  760   Friday, September 27, 2019, 11:54 Aaron Schmidt LP-SIS  41790-943515-6 Conditioning UC#(29) HSUsing broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53:
Roughing.
  
  1011   Wednesday, June 19, 2024, 15:50 Brady BorrmannTiC#9HP-SIS  45447-2945235-19In progressConditioning TiC#9Wednesday, June19, 2024, Spare TiC HP-SIS
target installed. TiC#24C
Wednesday, June19, 2024, 15:00: Roughing
 2024-06-21_HPTiC-24C_target_characterization.docx 
  1007   Friday, April 26, 2024, 13:49 Aaron SchmidtTiC#7HP-FEBIADITWTM445447-545235-15In progressConditioning TiC#7FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B
  
  962   Monday, April 17, 2023, 14:08 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A
open.
  
  965   Friday, May 05, 2023, 06:49 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B
 TiC#6_Anode_&_Coil_checks.docx 
  960   Wednesday, March 29, 2023, 12:22 Aaron SchmidtTiC#5LP-FEBIADITETM444692-745235-20FailedConditioning TiC#5Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on.
 TiC#5_conditioning.docx 
  964   Monday, May 01, 2023, 14:31 Aaron SchmidtTiC#5LP-FEBIADITETM444692-545235-20In progressConditioning TiC#5New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B
 TiC#5_-_44692-5_Anode_&_Coil_checks.docxTiC#5_-_44692-5_Conditioning.docx 
  367   Friday, March 28, 2014, 10:39 Anders MjosTiC#4HP-SISITETM3  In progressConditioning TiC#4NOTE:

TBHT Power Supply is 600A. EPICS thinks
  
  801   Monday, July 20, 2020, 11:40 Aaron Schmidt(Empty-Test)   44160-143822-2In progressConditioning Test P2NSalts added: 
Cs - 15 uL
Li - 10 uL
 P2N_-_1_-_July-20-22-2020.docx 
  982   Tuesday, October 10, 2023, 15:46 Aaron SchmidtTa#68 (Spare)LP-SIS  45220-345235-11In progressConditioning Ta#68 (Spare)Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on.
 Ta#68-Spare_Conditioning.docx 
  1023   Thursday, October 03, 2024, 16:26 Aaron SchmidtTa#68HP-SISITETM245447-2645235-16 * Conditioning Ta#68HS note:
Base# 45235-16
Lid# 39956-8
  
ELOG V2.9.2-2455