708
|
Thursday, January 24, 2019, 08:42 |
Aaron Schmidt | | | | | | | | IG6 fix (w/ instruction) | TMS:IG6 had continued communication errors post power outage & would not switch on. After a power loss, IG6 switches automatically to Filament 1. Filament 1 is burnt out.
Thursday, January 24, 2019, 08:14: TMS:IG6 fixed. Switched from Filament 1 to Filament 2. FIL2 runs ok.
Instructions from Edi:
-Using the + / - keys move the cursor on the control box to select FIL2. The control box is located above the beam line turbo pump control boxes / inside the black cabinets under the TS.
-Press ok to switch FL2 : ON
-Turn IG6 on with the computer (EPICS) before it times out.
-Now IG6 is connected and can be switched on / off from the computer. |
|
709
|
Friday, February 22, 2019, 11:11 |
Aaron Schmidt | | LP-FEBIAD | | | | | | Gas line backing pump tests | Backing "mini pump" testing.
-Open gas lines & auto ramp (If using HV, close up the back)
-HV on
-Close SV5, SV4, SV3 when ready. Wait until stable. Take measurement (1/2 hr approx)
-Turn down HV. Interlock, leave heaters on.
-Turn on mini pump.
-Open, SV4, SV3 carefully.
-Open MP valve. Wait 15 min. Close MP valve
-Carefully open SV5. Quick open & shut. Monitor vacuum 7.0e-06T trip limit.
-Monitor / record. Carefully open & close until stable.
-Close up TS w/ interlock
-HV on again & test.
Friday, February 22, 2019, 11:06: Auto-ramping TGHT / TBHT to 100 / 75 A. Gas lines open.
Friday, February 22, 2019, 11:31: HV on. BIAS / EZL / EE @ 5 / 1 / 0.1 kV. Anode @ 25 V - Low settings to check for trip and practice.
Friday, February 22, 2019, 11:43: HV unstable. Bump up. BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.
Friday, February 22, 2019, 12:36: SV3 closed (Neon)
Friday, February 22, 2019, 12:46: SV4 (Argon), SV5 closed.
Friday, February 22, 2019, 12:57: HV off.
Friday, February 22, 2019, 13:00: Interlock complete. Mini pump on.
Friday, February 22, 2019, 13:10: MP valve opened manually.
Friday, February 22, 2019, 13:16: SV3 open. SV4 open.
Friday, February 22, 2019, 13:19: MP valve closed. pump off. SV5 opened / closed fast & intermittent.
Friday, February 22, 2019, 13:22: SV5 open fully. Gas lines all open.
Friday, February 22, 2019, 13:24: HV on. Interlock out.
Friday, February 22, 2019, 13:27: BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.
Friday, February 22, 2019, 13:30: Setting reset, including optics. TGHT / TBHT did not trip.TEST 1 SUCCESS!.
Monday, February 25, 2019, 07:36: Auto-ramping TGHT / TBHT to 580 / 290 A. Gas lines open.
Monday, February 25, 2019, 11:04: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200V
Monday, February 25, 2019, 13:38 : SV3 closed.
Monday, February 25, 2019, 14:25: SV5 closed.
Monday, February 25, 2019, 14:45: HV off.
Monday, February 25, 2019, 14:50: Mini-pump on.
Monday, February 25, 2019, 14:53: Open MP valve
Monday, February 25, 2019, 14:57: Open SV3 & SV4
Monday, February 25, 2019, 14:59: Close MP valve.
Monday, February 25, 2019, 15:00: Open / Close SV5 intermittently until stable.
Monday, February 25, 2019, 15:01: SV5 Open.
Monday, February 25, 2019, 15:04: Locked up. Power back to HV. Optics switched on. FC0 closed. Ready for HV
Wednesday, February 27, 2019, 08:11: Auto-cooling @ 2 A per min
Wednesday, February 27, 2019, 13:23: gas lines closed.
Friday, March 01, 2019, 10:35: IV4 reset
Friday, March 01, 2019, 10:42: Ion gauge 1 & the turbo pumps off. |
|
710
|
Friday, March 01, 2019, 14:51 |
Aaron Schmidt | | LP-FEBIAD | | | | | | Gas lines test & Emissions measurement prep | Friday, March 01, 2019, 14:50:
SV5 replaced with a new valve.
SV1 disconnected from the He line and linked to the mini pump line.
Tuesday, March 05, 2019, 08:05: Roughing.
Tuesday, March 05, 2019, 08:36: Turbo pumps on.
Tuesday, March 05, 2019, 10:03: Vacuum at 1.30e-05T
Open SV3 & SV4. Vacuum remains unchanged. No response on the RGA.
Tuesday, March 05, 2019, 10:05: SV1 opened & closed. Responds well.
Tuesday, March 05, 2019, 10:06: Mini-pump on. MP manual valve closed.
Tuesday, March 05, 2019, 10:17: MP manual valve opened. No response on RGA. Vacuum stable / going down @ 1.13e-05T.
Tuesday, March 05, 2019, 10:25: SV1 open. No response on RGA. Vacuum stable / going down @ 1.02e-05T.
Tuesday, March 05, 2019, 10:35: SV1, SV3, SV4 closed. SV5 opened / closed. Minor response on RGA & Vacuum.
Tuesday, March 05, 2019, 10:40: SV5 opened fully to pump down.
Tuesday, March 05, 2019, 10:42: SV3 & SV4 opened fully to pump down.
Tuesday, March 05, 2019, 12:56: SV5 closed.
Tuesday, March 05, 2019, 12:57: SV3 & SV4 closed.
Tuesday, March 05, 2019, 12:59: SV1 to mini pump opened.
Tuesday, March 05, 2019, 13:06: SV3 & SV4 opened.
Tuesday, March 05, 2019, 13:27: SV1 closed. SV5 opened / closed in 'quick bursts'
Tuesday, March 05, 2019, 13:31: SV5 fully opened.
Tuesday, March 05, 2019, 13:43: Mini pump off.
Wednesday, March 06, 2019, 07:56: Mini-pump on. TS locked up. Power on. Gas lines open.
Wednesday, March 06, 2019, 07:59: RGA reset.
Wednesday, March 06, 2019, 08:00: Sources & optics on.
Wednesday, March 06, 2019, 08:02: Auto-ramping TGHT / TBHT to 100 / 75 A @ 2A per min.
Wednesday, March 06, 2019, 08:07: BIAS / EZL / EE @ 10 / 5 / 0.5 kV - Low settings stable.
Wednesday, March 06, 2019, 08:19: IV4 opened.
Wednesday, March 06, 2019, 11:05: SV3 closed.
Wednesday, March 06, 2019, 11:10: SV4 & SV5 closed.
Wednesday, March 06, 2019, 11:11: SV5 re-opened.
Wednesday, March 06, 2019, 11:15: SV5 closed.
Wednesday, March 06, 2019, 11:16: SV1 to mini pump (running) opened.
Wednesday, March 06, 2019, 11:22: Sv3 & SV4 opened. No response on vacuum or RGA. SV5 good.
Wednesday, March 06, 2019, 11:30: Closed SV1, SV3, & SV4. open / close SV5 until stable.
Wednesday, March 06, 2019, 11:33: SV3 & SV4 opened.
Wednesday, March 06, 2019, 11:36: SV5 fully opened. No trip.
Wednesday, March 06, 2019, 11:40: Auto-ramping TGHT / TBHT to 350 / 250 A @ 2A per min.
Thursday, March 07, 2019, 07:23: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Thursday, March 07, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode 200 V
Thursday, March 07, 2019, 07:38: Something in the BIAS went horribly wrong. The Test Stand was crackling like a fire cracker. Very loud.
BIAS / EZL / EE / Anode off. Begin auto cooling.
Optics tripped. TMS:TP6 tripped
|
Attachment 1: gas-lines-changes.jpg
|
|
Attachment 2: Gas_line_backing_pump_test_2019.docx
|
Attachment 3: TS-2019-03-05-09-45.rga
|
Attachment 4: TS-2019-03-06-08-00.rga
|
|
711
|
Thursday, March 07, 2019, 07:55 |
Aaron Schmidt | | LP-FEBIAD | | | | | Problems/Solutions | TS restart - Troubleshoot BIAS spark | Thursday, March 07, 2019, 07:48: IV4 reset, BV6 & TMS TP6 reset.
Turbo pump restarted.
Auto cooling @ 2A per min.
Thursday, March 07, 2019, 08:40: Speed up Auto-cooling to 4A per min.
Thursday, March 07, 2019, 11:06: Power cycled the control boxes for the turbo pumps one by one. Operation in back to normal.
Thursday, March 07, 2019, 11:09: Switched to filament 2 on IG6. Reset.
Sparks from BIAS to EZL noticed at 1 kV. A wire was moved away from insulator 'O'
Sparks from BIAS to EZL @ 3kV
Friday, March 08, 2019, 11:00: Power supplies checked with John Chow.
BIAS (V) ------------------- EZL (V)
Set@-Read-Actual-----Set@-Read-Actual
1000- 982- 816---------1000- 987- 996
1500-1480-1300-------1500-1475-1530
2000-1993-1600-------2000-1993-1997
2500-2491-2070-------10000-9993-9964
3000-2989-2500
3500-3487-2900
4000-3985-3360
5000-4982-4145
Note* Lower reading on BIAS. Check the scaling with controls group.
Friday, March 08, 2019, 11:14: RGA, Ion gauge, Turbo pumps off.
Friday, March 08, 2019, 13:01: Venting for visual inspection.
Visual & Multimeter checks appear ok.
Friday, March 08, 2019, 14:37: Roughing.
Friday, March 08, 2019, 15:00: Turbos on.
Monday, March 11, 2019, 09:00: Switch everything on & slowly increase EZL & BIAS together
Monday, March 11, 2019, 09:30: Spark at approx 12-13 kV on BIAS. TGHT to 600A? Readback.
TGHT PS readback issues. John C contacted.
Power down.
Prep for TGHT PS removal. Possible capacitive effect? Test TS w/o TGHT PS after.
Monday, March 11, 2019, 13:55: New TGHT PS installed.
Tuesday, March 12, 2019, 08:37: Power / sources on
Tuesday, March 12, 2019, 08:50: BIAS to over 3kV. EZL set to 1 kV, but charged to over 5.5 kV on its own.
Tuesday, March 12, 2019, 09:30: Electrical check in the HV cage revealed a light oxide coating on the EZL post 'O'. This appears to have insulated the nut & feed through. Will require venting & removal to clean.
Ion gauge, turbo pumps off.
Tuesday, March 12, 2019, 11:10: Venting.
Wednesday, March 13, 2019, 08:30: Roughing. The brass nut & spark cap were polished, cleaned and re-installed. Other connections & wires cleaned.
Wednesday, March 13, 2019, 09:10: Turbo pumps started. Wiring up top re-connected.
Update* EZL PS removed. Tested by John C & Tomislav. The HV enable circuit wouldn't activate. Upon further investigating into the control and voltage regulating circuits of the PS, they found that the control ICs are 40% under powered, only getting 10V instead of 15V from its voltage regulator.
EZL PS to be replaced.
Wednesday, March 20, 2019, 07:03: Turbo pumps off
Wednesday, March 20, 2019, 08:28: Venting |
Attachment 1: BIAS_spark_out_issue_-_2019.docx
|
Attachment 2: TS-2019-03-07-07-51.rga
|
|
712
|
Monday, March 11, 2019, 13:56 |
Aaron Schmidt | | | | | | | Done | TGHT PS replaced | Monday, March 11, 2019, 13:55: The TGHT PS was replaced.
Brought up to 20 A. Operation. ok. |
|
713
|
Thursday, March 21, 2019, 08:33 |
Aaron Schmidt | | | | | | | | Pump down TS | Thursday, March 21, 2019, 08:32: Roughing. |
|
714
|
Tuesday, March 26, 2019, 10:44 |
Aaron Schmidt | | | | | | | Problems/Solutions | EZL PS replaced. Test | EZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS 3kV. Direct measurement reads 5.8 kV
Readback does not increase with the controls. Stops at 2.4kV & the current climbs very quickly.
Tuesday, March 26, 2019, 11:00: EZL PS routed to TS BIAS, but still controlled via EZL controls. EZL line grounded.
Brought up to 20kV, no sparks.
New EZL PS confirmed ok. BIAS PS has issues. |
Attachment 1: New_EZL_PS_testing_-_2019.docx
|
|
715
|
Wednesday, March 27, 2019, 11:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | BIAS PS replaced. Test | Wednesday, March 27, 2019, 10:25: BIAS @ 1 kV
952V - 548uA on controls readback - Scaling req'd
964V direct from the PS - 25 uA
Wednesday, March 27, 2019, 10:28:
2.75 kV
2725V - 1515uA on controls readback
2696V direct from the PS - 65.8 uA - Scaling req'd
Wednesday, March 27, 2019, 10:31:
5.5kV
5465V - 3022uA on controls readback
5.478kV direct from the PS - 137.5uA - Scaling req'd
Wednesday, March 27, 2019, 11:00: PS runs ok. Longer connection cable req'd to link to TS source. Contact controls over scaling.
Wednesday, March 27, 2019, 14:25: Sources on. BIAS connected.
Wednesday, March 27, 2019, 14:34: BIAS / EZL @ 5.5 / 1 kV. No spark.
Wednesday, March 27, 2019, 14:51: BIAS / EZL @ 10 / 5 kV. No spark.
Wednesday, March 27, 2019, 14:57: BIAS / EZL @ 20 / 10 kV. No spark.
Scaling done IOC Restarted.
Thursday, April 04, 2019, 10:33: BIAS / EZL @ 20 / 10 kV. No spark.
Thursday, April 04, 2019, 10:35: BIAS / EZL / EE @ 30 / 13 / -1.5 kV. Anode at 200 V. No spark.
Thursday, April 04, 2019, 10:49: Sources brought to 0. No spark & scaling appears complete. |
Attachment 1: NEW_BIAS_PS_testing_-_2019.docx
|
|
716
|
Friday, April 05, 2019, 07:02 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | TS operation test - LP FEBIAD | Due to previous issues, a full run / test should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA on.
Friday, April 05, 2019, 07:03: Begin opening / closing gas lines until they can be opened & stable.
Friday, April 05, 2019, 07:14: Gas lines open.
Friday, April 05, 2019, 07:16: Power / sources on. Vacuum down to 1.25e-06T
Friday, April 05, 2019, 07:18: Optics on & Set.
Friday, April 05, 2019, 07:19: IV4 Opened.
Friday, April 05, 2019, 07:21: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min
Friday, April 05, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200 V.
Friday, April 05, 2019, 09:40: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min
Friday, April 05, 2019, 14:01: Beam on FC0 & wire scans. Mass scan provides no reading. (Max current after CONST2 has changed). Inquire why.
No sparks have occurred on this run. Operationally, appears the PS switches were effective.
Friday, April 05, 2019, 14:05: Begin auto-cooling @ 2A per min.
Friday, April 05, 2019, 14:56 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.
Monday, April 08, 2019, 06:57: RGA off. Gas lines closed. IV4 Closed.
Monday, April 08, 2019, 07:01: Power / Sources off.
Monday, April 08, 2019, 07:01: IG1 off. Turbo pumps off.
Monday, April 08, 2019, 08:11: Venting. |
Attachment 1: TS_-_New_BIAS__EZL_Testing_-_2019.docx
|
Attachment 2: TS-2019-04-05-07-00.rga
|
|
717
|
Monday, April 15, 2019, 14:42 |
Aaron Schmidt | | LP-SIS | | | | 42972-1 | Done | Conditioning UC#27 HS & test FS#3 | New coil lines installed for P2N testing later.
Monday, April 15, 2019, 14:15: Roughing.
Monday, April 15, 2019, 14:49: Turbo pumps on.
Tuesday, April 16, 2019, 08:20: RGA on.
Gradually open each line. Wait 5 minutes & monitor the response.
Tuesday, April 16, 2019, 08:30: Open Return & Supply main valves.
Tuesday, April 16, 2019, 08:32: Open FS#5. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:37: Vacuum @ 4.37e-06T
Tuesday, April 16, 2019, 08:38: Open FS#4. Vacuum @ 4.37e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:43 Vacuum @ 4.29e-06T
Tuesday, April 16, 2019, 08:44 Open FS#3. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:49: Vacuum @ 4.26e-06T.
Tuesday, April 16, 2019, 08:50: Open FS#2. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:57: Vacuum @ 4.29e-06T.
Wednesday, April 17, 2019, 08:30: Power/sources on. Vacuum @ 2.46e-06T.
Wednesday, April 17, 2019, 10:30: Auto-ramping TGHT to 150 @ 2A per min. Vacuum limit increased to 3.000e-06T.
Wednesday, April 17, 2019, 11:53: Auto-ramping TGHT to 300 @ 2A per min. Vacuum @ 2.50e-06T.
Wednesday, April 17, 2019, 13:10: Auto-ramping TGHT to 350 @ 2A per min. Vacuum @ 2.95e-06T.
Thursday, April 18, 2019, 07:23: Auto-ramping TGHT to 575 @ 2A per min. Vacuum @ 2.40e-06T.
Tuesday, April 23, 2019, 06:45: Auto-Cooling TGHT @ 2A per min. Vacuum @ 9.22e-07T.
Tuesday, April 23, 2019, 08:29: RGA error. Shut off RGA.
Tuesday, April 23, 2019, 11:34: Power/sources off.
Tuesday, April 23, 2019, 11:37: IG1 off. Turbos off.
Tuesday, April 23, 2019, 12:53: Venting. |
Attachment 1: UC#27_&_FS#3_check.docx
|
Attachment 2: TS-2019-04-16-08-20.rga
|
|
718
|
Tuesday, April 23, 2019, 14:39 |
Aaron Schmidt | | LP-SIS | | | | 42752-8 | Done | Conditioning UC#28 HS | Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo pumps started.
Tuesday, April 23, 2019, 15:18: Ion gauge on.
Wednesday, April 24, 2019, 07:33: RGA on.
Wednesday, April 24, 2019, 07:37: Waterlines opened. Vacuum ok @ 7.99e-07T. No response on RGA
Wednesday, April 24, 2019, 07:41: Power / sources on.
Wednesday, April 24, 2019, 07:43: Auto-ramping TGHT to 575 @ 2A per min. Vacuum limit remains at 3.000e-06T.
Thursday, April 25, 2019, 14:07: Auto-cooling @ 2 A per min.
Friday, April 26, 2019, 07:53: sources off.
Friday, April 26, 2019, 07:55: RGA off. Power off.
Friday, April 26, 2019, 07:57: Turbos off.
Friday, April 26, 2019, 08:00: HS waterlines purged. |
Attachment 1: TS-2019-04-24-07-30.rga
|
Attachment 2: UC#28_HS.docx
|
|
719
|
Friday, April 26, 2019, 13:45 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | 42972-7 | In progress | Conditioning Ta#58 HS | Friday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo pumps on.
Friday, April 26, 2019, 14:58: RGA on.
Monday, May 06, 2019, 07:05: RGA restarted.
Monday, May 06, 2019, 07:10: Waterlines opened. Vacuum ok @ 5.13e-07T. No response on the RGA.
Monday, May 06, 2019, 07:16: Power / sources on.
Monday, May 06, 2019, 07:20: Optics set.
Monday, May 06, 2019, 07:23: Auto-ramping TGHT / TBHT to 575 / 200 A @ 2A per min.
Monday, May 06, 2019, 07:28: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.
Monday, May 06, 2019, 07:39: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, May 06, 2019, 07:57: Reset DaqPro. Ref data sheet.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.8 |
5.52 |
TBHT |
25.7 |
7.93
|
COIL + EE |
25.6 |
1.92 |
TGHT |
25.70 |
6.29 |
Monday, May 06, 2019, 09:07: TBHT at 200A ok. Halt auto ramp. Set TBHT. Cont'd auto-ramping TGHT / TBHT to 575 / 230 A @ 2A per min.
Monday, May 06, 2019, 09:47: RGA restarted. Updates?
RGA timed out around 10:30.
Monday, May 06, 2019, 11:00: RGA error. Initial communications errors, would not connect. Restarted the computer and allowed updates to take effect. EM7 error displayed.
Monday, May 06, 2019, 11:27: RGA restarted.
Monday, May 06, 2019, 13:10: EZL to 14.3 kV
Monday, May 06, 2019, 14:48 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.4 |
7.78 |
TBHT |
27.0 |
10.30
|
COIL + EE |
26.8 |
3.01 |
TGHT |
27.1 |
7.09 |
Tuesday, May 07, 2019, 07:26: Noticed a discrepancy on the mass scan. The mass peaks appear to have moved further along the mass / q. They are identical to what we used to see on previous scans, just further down the line. A calibration / scaling may be appropriate.
Element |
Mass |
Mass/q |
Beam Current |
Lithium |
6.941 |
7.508 |
1.04401e-10 |
Sodium |
22.9897 |
27.556 |
9.85687e-10 |
Mass 27 (Al) |
26.9815 |
32.2943 |
2.97834e-08 |
Potassium |
39.0983 |
46.3293 |
7.49146e-10 |
|
(peak 2) |
47.6191 |
1.568e-10 |
Rubidium |
85.4678 |
100.355 |
2.79327e-10 |
|
(peak 2) |
102.904 |
1.04431e-10 |
Cesium |
132.9055 |
156.6 |
8.6103e-10 |
|
(peak 2) |
162.532 |
2.4408e-10 |
The discrepancy appears to get larger the further we move along the masses.
Tuesday, May 07, 2019, 07:39: Auto-cooling @ 2 A per min to TGHT / TBHT @ 350 / 0 A. Check around 9:20am.
Tuesday, May 07, 2019, 09:30: Auto-cooled to TGHT / TBHT @ 350 / 0 A.
Tuesday, May 07, 2019, 11:06: Auto-cooling @ 2A per min.
Tuesday, May 07, 2019, 11:09: Auto-cooling @ 4A per min.
Tuesday, May 07, 2019, 12:51: Power / sources off. IV4 closed / reset. RGA off.
Tuesday, May 07, 2019, 12:54: Turbo pumps off.
Tuesday, May 07, 2019, 14:00: Venting. |
Attachment 1: Ta#58.docx
|
Attachment 2: TS-2019-04-26-14-56.rga
|
Attachment 3: TS-2019-05-03-11-21.rga
|
Attachment 4: TS-2019-05-06-07-05.rga
|
Attachment 5: TS-2019-05-06-09-47.rga
|
Attachment 6: TS-2019-05-06-10-57.rga
|
Attachment 7: ITE-TM2-Ta#58-LP-SIS_Test_Stand.docx
|
|
721
|
Tuesday, May 07, 2019, 13:16 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | | In progress | 9-pin connection configuration (Using Ta#58) | Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Pins connected source tray side: 1, 4, 5, 6
ST 9-pin HV rack
Pin to L TGHT - 1 - Black / COM / 5
Pin to R TGHT - 6 - Red / 9
Pin to L TBHT - 4 - Black / COM / 2
Pin to R TBHT - 5 - Red / 1
Tuesday, May 07, 2019, 15:20: Roughing.
Turbo pumps switched on w/ Ion gauge around 4pm.
Wednesday, May 08, 2019, 08:05: Multi-meters tested & connected.
Wednesday, May 08, 2019, 08:09: Power / sources on.
Wednesday, May 08, 2019, 08:13: RGA on
Wednesday, May 08, 2019, 08:14: Auto-ramping TGHT / TBHT to 575 (580) / 230 A @ 2A per min.
Wednesday, May 08, 2019, 08:30: Voltage reading off on TBHT? Connection to source tray side is wrong.
Wednesday, May 08, 2019, 08:40: Halt auto ramping. Manually tap down TBHT / TGHT
Wednesday, May 08, 2019, 08:42: Sources / RGA off.
Wednesday, May 08, 2019, 08:43: Turbo pumps off.
Wednesday, May 08, 2019, 10:40: Roughing.
Wednesday, May 08, 2019, 11:01: Turbo pumps on.
Wednesday, May 08, 2019, 13:10: Power / sources on. Vacuum @ 4.37e-06T
Wednesday, May 08, 2019, 13:19: Auto-ramping TGHT to 575 (580) A @ 2A per min. However, the vacuum is not quite ready. Increment value set to 3.000e-06T to ramp. Once the vacuum is reached, the heaters will start to ramp automatically.
Wednesday, May 08, 2019, 14:23: Auto-ramping ongoing successfully. TGHT @ 32A +. Vacuum @ 2.66e-06T
Thursday, May 09, 2019, 07:05: Auto-ramping TGHT to 575 (580) A @ 2A per min from 400 A.
Monday, May 13, 2019, 08:00: TSG:TP1A appears to have tripped over the weekend. (Around 7pm Saturday)
Closed IV4 / reset. Reset TP1A. Reset BV1A. Turn on TP1A.
Monday, May 13, 2019, 08:32: TBHT & TGHT switched back on.
Ramped down around 10 PM.
Tuesday, May 14, 2019, 07:10: Power / RGA off.
Tuesday, May 14, 2019, 07:12: IV4 closed, Ion gauge & turbo pumps off.
Tuesday, May 14, 2019, 08:35: Waterlines purged. Venting. |
Attachment 1: HV_Tests_2019_-_AL_-_1.docx
|
Attachment 2: TS-2019-05-08-08-12.rga
|
Attachment 3: TS-2019-05-08-14-20.rga
|
|
722
|
Tuesday, May 14, 2019, 10:22 |
Aaron Schmidt | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | 42972-3 | In progress | Conditioning ZrC#8 HS | Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo pumps on.
Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.
Wednesday, May 15, 2019, 08:42: Waterlines opened. Vacuum Ok @ 6.45e-07T. No response on RGA.
Wednesday, May 15, 2019, 08:58: Power / sources on.
Wednesday, May 15, 2019, 09:00: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Wednesday, May 15, 2019, 09:02: Optics set. IV4 open.
Wednesday, May 15, 2019, 09:09: BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV.
Wednesday, May 15, 2019, 09:10:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.34 |
5.24 |
TBHT |
26.28 |
8.23
|
COIL + EE |
26.11 |
2.18 |
TGHT |
26.21 |
6.44 |
Wednesday, May 15, 2019, 10:39: Abort auto-ramp. Significant out gassing note. Vacuum @3.12e-06T
TGHT / TBHT @ 77 A. Hold until stable again. Effect noted similar to ZrC#7 ( https://elog.triumf.ca/TIS/Test-Stand/450 ). Resume Auto ramp in 1 hour to TGHT / TBHT 350 / 150 A.
Wednesday, May 15, 2019, 11:54: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.
Wednesday, May 15, 2019, 14:47: TGHT / TBHT @ 146 / 146 A. Ramping to 350 / 150 A overnight.
Thursday, May 16, 2019, 07:30: Restarted RGA.
Thursday, May 16, 2019, 07:54: Mass scan taken albeit still ramping. TGHT / TBHT @ 280 / 150 A.
Thursday, May 16, 2019, 09:10: Ramping aborted @ TGHT / TBHT @ 285 (287.6) / 150 A. Allow for further out gassing.
Thursday, May 16, 2019, 13:22: Vacuum limit increased to 2.0e-06T. Vacuum @ 7.86E-07T.
Thursday, May 16, 2019, 13:23: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.
Tuesday, May 21, 2019, 07:03: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Tuesday, May 21, 2019, 12:30: TGHT Stopped at 557.2A. Readout at 578. Moved readout to 557. Readback @ 557.2A.
Wednesday, May 22, 2019, 07:09: TGHT was at voltage limit. The limit was increased. Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Wednesday, May 22, 2019, 07:32: TGHT 579.9 A / 8.051 V.
Wednesday, May 22, 2019, 13:45: Masscorr calibration confirmed.
Wednesday, May 22, 2019, 13:51: Auto-cooling @ 2A per min.
Thursday, May 23, 2019, 13:27: Sources / Power off. RGA off.
Thursday, May 23, 2019, 13:31: IV4 Closed. Turbo pumps off. |
Attachment 1: ZrC#8.docx
|
Attachment 2: TS-2019-05-14-11-05.rga
|
Attachment 3: TS-2019-05-16-07-30.rga
|
Attachment 4: TS-2019-05-21-07-10.rga
|
Attachment 5: ITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx
|
|
723
|
Wednesday, May 22, 2019, 13:47 |
Aaron Schmidt | | | | | | | | Calibrated Masscorr | Wednesday, May 22, 2019, 13:44: Calibration Confirmed.
New Masscorr setup:
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2019-05-22-13-42%20ZrC%238 |
|
724
|
Saturday, May 25, 2019, 12:43 |
Aaron Schmidt | Test FEBIAD / TM4 | LP-FEBIAD | | TM4 | 395530-3 | 42752-5 | In progress | Installed TM4 Source Tray | Silver bolts on TGHT & Coil Lines. Oxide steel bolts on TBHT. Filed target to suit / fit (Previously heated). Rubber O-rings used instead of C-seals on the water blocks.
Saturday, May 25, 2019, 12:38: Leak check ok. 0.0E-07 Torr-I/sec. He @ 30 PSI. Carla checked the multi-pin connection. OK.
Saturday, May 25, 2019, 12:46: Roughing.
Saturday, May 25, 2019, 14:30: Turbo pumps started.
Saturday, May 25, 2019, 14:34: Ion gauge on.
Monday, May 27, 2019, 07:09: RGA on.
He Leak TEST #1:
Vacuum Group Leak detector LD#4.
08:39: Vacuum @ 1.58e-06T
LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec
08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec
Full open base:
Vacuum @ 1.60e-06T. RGA status:
Water: 2.36e-006
He: -1.05e-009
LD: 3.4e-07 atm-cc/sec
Monday, May 27, 2019, 08:50: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:00: Vacuum @ 1.60e-06T . RGA status:
Water: 2.33e-006
He: -4.89e-010
LD: 3.4e-07 atm-cc/sec. Purge and close FS#2.
Monday, May 27, 2019, 09:05: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:15: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted)
Water: 2.29e-006
He: -4.19e-009
LD: 3.6e-07 atm-cc/sec. Purge and close FS#3.
Monday, May 27, 2019, 09:26: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:35: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted, continued from FS#3)
Water: 2.25e-006
He: -7.36e-009
LD: 4.0e-07 atm-cc/sec. Purge and close FS#4.
Monday, May 27, 2019, 09:45: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:55: Vacuum @ 1.58e-06T. RGA status:
Water: 2.21e-006
He: -3.16e-010
LD: 4.2atm-cc/sec. Purge and close FS#5
Monday, May 27, 2019, 10:00: Depressurize lines. Connect HPA & Purge all lines.
After 5 minutes: Vacuum @ 1.58e-06T . RGA status:
Water: 2.20e-006
He: -5.73e-010
LD: 4.3e-07 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Note: He spikes ongoing after opening line FS#3. Likely due to the use of rubber o-rings.
Monday, May 27, 2019, 10:51: Begin gradually opening the waterlines.
Monday, May 27, 2019, 10:54: Open FS#2. Vacuum @ 1.56e-06T. No Response on RGA.
Monday, May 27, 2019, 10:56: Open FS#3. Vacuum @ 1.58e-06T. No Response on RGA.
Monday, May 27, 2019, 11:00: Keiko stopped by. Soft restart done on PLC.
Monday, May 27, 2019, 11:04: Open FS#4. Vacuum @ 1.58e-06T. No Response on RGA.
Monday, May 27, 2019, 11:06: Open FS#5. Vacuum @ 1.58e-06T. No Response on RGA.
Waterlines Ok.
Prep to open gas lines.
Monday, May 27, 2019, 11:24: SV1 open w/ mini pump. Vacuum @ 1.49e-06T. No Response on RGA.
Monday, May 27, 2019, 11:25: Open SV3 & SV4 w/ mini pump. Vacuum @ 1.58e-06T. No Response on RGA. Allow 10 min.
Monday, May 27, 2019, 11:35: Mini pump switched off. SV1 Closed.
Monday, May 27, 2019, 11:37: Begin quickly opening and closing gas lines until the a stable vacuum is reached.
Monday, May 27, 2019, 11:40: Gas lines: SV3, SV4, & SV5 open.
Monday, May 27, 2019, 13:29: Power / Sources on.
Monday, May 27, 2019, 13:30: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.
Monday, May 27, 2019, 13:44: Open IV4.
Tuesday, May 28, 2019, 07:10: Gradually bring up HV to BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV in increments of 500 / 100 / 250
Tuesday, May 28, 2019, 07:22: Halted and brought back down. BIAS / EE / EZL @ 10 / -0.2 / 8.5 kV. Unusual current noticed on the EE. Only went to -200 V and the current increased to 1300uA. Typically at -1500V the current sits at 515uA.
Tuesday, May 28, 2019, 09:21: 50V added top Anode. EE current increases to 310.134uA. Odd. EE voltage increases affect the Anode current as well.
Tuesday, May 28, 2019, 09:22: Auto-cooling @ 4A per min.
Tuesday, May 28, 2019, 11:15: Power off. Gas lines closed.
Tuesday, May 28, 2019, 11:36: Connection discovered between Anode & EE. (Inside Vacuum). RGA off. IV4 closed.
Tuesday, May 28, 2019, 11:38: IG1 off. Turbos off.
Tuesday, May 28, 2019, 12:40: Venting
Tuesday, May 28, 2019, 15:02:
Short found on EE to Anode. Wires touching inside chamber. Fixed. Tubes touched to coil. No longer touching. Electrical check of source tray complete. Target re-installed.
Roughing. |
Attachment 1: TM4_Source_Tray_-_2019_-_Leak_Check.docx
|
Attachment 2: TM4_Source_Tray_-_2019.docx
|
Attachment 3: TS-2019-05-27-07-08.rga
|
|
725
|
Tuesday, May 28, 2019, 15:05 |
Aaron Schmidt | Test FEBIAD / TM4 | LP-FEBIAD | | TM4 | 395530-3 | 42752-5 | In progress | TM4 Source Tray - Episode II | SEE ELOG 724
Tuesday, May 28, 2019, 15:02: Roughing
Tuesday, May 28, 2019, 15:32: Turbos on.
Wednesday, May 29, 2019, 07:08: RGA on.
Wednesday, May 29, 2019, 07:10: Waterlines opened on FS#5. No response on RGA. Vacuum ok @ 1.32e-06T.
Power on.
Wednesday, May 29, 2019, 07:13: Mini-pump & manual valve opened. Prep / rough gas lines.
Alternate SV1, SV3, & SV4.
Wednesday, May 29, 2019, 07:27: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.
Wednesday, May 29, 2019, 07:32: Gas lines fully opened.
Wednesday, May 29, 2019, 07:37: Sources on.
Wednesday, May 29, 2019, 07:39: Anode to 50 V. No response on EE. EE to -100 V. Current response normal @ 34.188 uA.
Wednesday, May 29, 2019, 07:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode to 100 V. Coil to 10 A. Small sparks heard around 23 kV.
Wednesday, May 29, 2019, 07:54: IV4 opened.
Wednesday, May 29, 2019, 07:57: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.
Wednesday, May 29, 2019, 07:57: Spark* Computer screens flickered. RGA knocked out.
Wednesday, May 29, 2019, 08:00: Shut off & unplug the RGA.
Wednesday, May 29, 2019, 08:04: Optics set.
Wednesday, May 29, 2019, 08:23: Small spark* Nothing affected.
Wednesday, May 29, 2019, 08:35: Small spark* TSG:CBC restarted.
Wednesday, May 29, 2019, 10:26: Small spark* TSG:CBC boosted from 500 V to 2501 V. Reset to 500 V. TPS:Q1 boosted from 790 / 675 V to 1500 / 1230 V. Reset.
Wednesday, May 29, 2019, 12:04: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min. Over 100 minutes spark free.
Wednesday, May 29, 2019, 12:14: Spark* Reset optics & TSG:CBC
Wednesday, May 29, 2019, 12:35: Note*: Gradual climb on EZL current noticed as ramping current climbs.
Wednesday, May 29, 2019, 13:01: Spark* Reset optics & TSG:CBC
Wednesday, May 29, 2019, 13:50: Spark* Reset optics & TSG:CBC. TSG:CBC was boosted from 500 V to 2501 V.
Wednesday, May 29, 2019, 13:54: A small but notable out gassing event, without an audible spark occurred. Brief instability in BIAS voltage & current. Vacuum spike to over 3.0e-06T.
Wednesday, May 29, 2019, 14:01: Auto ramping TBHT to 290 A @ 2A per min. TGHT at 577 (580.4 A)
Wednesday, May 29, 2019, 14:15: Wire Scans taken. TMS:RPM0A (X Axis) revealed no beam / peak. TMS:RPM0B (Y Axis) revealed a beam peak. Will attempt to steer TMS:RPM0A (X Axis) until beam peak is revealed.
Wednesday, May 29, 2019, 14:49: Further tuning required. Optics (TPS) Q1, Q2, Q3, Q4 all adjusted. FEBIAD source side (TSG) CB1, VCB1, & CBC all adjusted. Small peak found on RPM0A (X Axis). TMS:RPM0B (Y Axis) revealed a beam peak
Mass scans have not been successful. Yet.
Wednesday, May 29, 2019, 15:00: BIAS / EE / EZL brought to 0 kV. Allow out gassing of the source tray & protect equipment overnight.
Thursday, May 30, 2019, 07:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Thursday, May 30, 2019, 07:55: Spark* Reset optics & TSG:CBC.
Thursday, May 30, 2019, 08:37: Spark* Tripped TMS:TP6 turbo pump. Closed IV4. Tripped & Boosted TPS:Q1. Reset optics & TSG:CBC. Open IV4.
Thursday, May 30, 2019, 09:00: Spark* Visible inside TS on the back of the optics tray off one of the EZL wires. EZL current spiked 1440 uA. Voltage dropped and became unresponsive over 8.5 kV.
Thursday, May 30, 2019, 09:13: BIAS / EE / EZL brought to 0 kV. Anode to 0 V. Coil to 0 A.
EZL to 7000V - Current spikes to over 500 uA.
Thursday, May 30, 2019, 09:32: Auto-cooling @ 2 A per min.
Thursday, May 30, 2019, 09:41: Auto-cooling @ 3 A per min.
Thursday, May 30, 2019, 09:49: IV4 closed. Gas lines closed. All sources expect TGHT / TBHT off.
Thursday, May 30, 2019, 12:24: Halt auto-cooling. Sources on.
Thursday, May 30, 2019, 12:32: BIAS @ 20 kV.
Thursday, May 30, 2019, 12:34: BIAS @ 30 kV.
Thursday, May 30, 2019, 12:38: BIAS / EE @ 30 / -1.5 kV
Thursday, May 30, 2019, 12:42: BIAS / EE @ 39.5 / -2 kV. Two sparks* Shut off turbos
Thursday, May 30, 2019, 12:45: Turbo pumps TP6 & TP1B restarted. Optics reset.
Thursday, May 30, 2019, 12:51: BIAS / EE / EZL @ 40 / -2 / 5.25 kV. Spark* Shut off turbos / reset.
Thursday, May 30, 2019, 12:56: BIAS / EE / EZL @ 41.5 / -2.5 / 7.5 kV. Spark* Shut off turbos / Optics. Reset.
Thursday, May 30, 2019, 13:01: BIAS / EE / EZL @ 45 / -2.5 / 7.5 kV. Visible spark inside the vacuum* Shut off turbos / Optics. Reset.
Thursday, May 30, 2019, 13:26: BIAS / EE / EZL @ 46.25 / -2.5 / 7.5 kV. Visible spark inside the vacuum, off multi-pin corner? * Shut off turbos / Optics. Reset. FC0 affected. Reset.
Thursday, May 30, 2019, 13:38: Go pro setup
Thursday, May 30, 2019, 13:41: BIAS / EE / EZL @ 48 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.
*Spark seen by Carla on the back of multi-pin (Anode wire perhaps?).
Thursday, May 30, 2019, 13:52: BIAS / EE / EZL @ 48.9 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.
*Spark seen on the base of the EZL.
Thursday, May 30, 2019, 14:00: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Thursday, May 30, 2019, 14:07: Spark* No trips
Thursday, May 30, 2019, 14:15: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. * Shut off turbos / Optics. Reset. FC0 affected. Reset.
Thursday, May 30, 2019, 14:24 BIAS / EE / EZL @ 51.3 / -2.5 / 7.5 kV. * Shut off TP6 / Optics. Reset. RPM6B affected, ran up & down on its own. Reset.
Thursday, May 30, 2019, 14:25: BIAS back to 50 kV.
Thursday, May 30, 2019, 14:31: BIAS / EE / EZL @ 51.9 / -2.5 / 7.5 kV. Visible spark inside the vacuum, from source tray to the rear ground electrode plate * Shut off turbos / Optics. Reset. FC0 affected. Reset.
IG6 ion gauge & TMS TP6 tripped. Fix. Switched to filament 2.
Thursday, May 30, 2019, 14:43: BIAS / EE / EZL @ 52.8 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Bottom corner of multi-pin bracket * Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.
Thursday, May 30, 2019, 14:54: BIAS / EE / EZL @ 53.5 / -2.5 / 7.5 kV. Sparks*
Thursday, May 30, 2019, 14:59: BIAS / EE / EZL @ 54 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Source tray EE over insulators to ground (Matt got a video, really nice)* Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.
Thursday, May 30, 2019, 15:06: BIAS / EE / EZL @ 54.7 / -2.5 / 7.5 kV. Spark. Reset a bunch.
Thursday, May 30, 2019, 15:15: BIAS @ 55 kV.
Thursday, May 30, 2019, 15:24: BIAS / EE / EZL @ 0 kV.
Thursday, May 30, 2019, 15:24: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, May 31, 2019, 07:22: BIAS @ 10 kV. IV4 opened.
Friday, May 31, 2019, 07:33: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V. Coil @ 20 A. FC0? No response.
Friday, May 31, 2019, 07:48: Coil @ 50 A. FC0 BIAS off. Troubleshoot FC0.
Friday, May 31, 2019, 08:01: Nothing on wire scans. FC0 randomly gaining, but no BIAS response. Rod N contacted on FC0.
Friday, May 31, 2019, 09:56: FC0 Fixed by Rod. N. MB1 acting up. Fixed itself through power / Canbus cycling?. Wire scans: RPM0A (X) non-responsive, RPM0B (Y) responds. Turn down HV to prep for gases.
Friday, May 31, 2019, 10:14: BIAS / EE / EZL / Anode @ 0 kV.
Friday, May 31, 2019, 10:18: Mini pump on. Manual valve opened. Prep / rough gas lines.
Alternate SV1, SV3, & SV4.
Friday, May 31, 2019, 10:31: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.
Friday, May 31, 2019, 10:36: Gas lines fully opened.
Friday, May 31, 2019, 10:48: Vacuum stable @ 1.25e-06T. HV sources back on.
Friday, May 31, 2019, 11:04: BIAS / EE / EZL @ 30 / -1.5 / 8.25 kV. Anode @ 200 V. Coil @ 50 A.
Friday, May 31, 2019, 11:32: Spark knocked out Optics & Steering. Wire scanners to zero. Unable to pick up wire scan for X or Y.
Friday, May 31, 2019, 11:35: BIAS / EE / EZL @ 30 / -2.0 / 7.5 kV.
Friday, May 31, 2019, 12:05: Tuning adjusted. RPM0A (X) no response. RPM0B (Y) Response (It's back!!!).
Friday, May 31, 2019, 12:13: But it sparked...* Reset Optics. Re-scan to recover. Wire scanners to zero. Unable to pick up wire scan for X.
Carla, Fernando, Matt K.
Friday, May 31, 2019, 12:33 Using Brad's tuning values we see a nice peak at the first set of wire scanners on the y axis but nothing on the x axis. Using CB2, went from 200V to 900V in steps of 100V and saw nothing on the x axis. This seems to indicate x axis scanner is broken. Proceeding without x axis readout. Also tried with CB1 steerers, same effect.
Friday, May 31, 2019, 13:30: Auto-ramping TBHT to 305 A @ 2 A per min.
Friday, May 31, 2019, 13:31: EZL @ 8 kV.
Friday, May 31, 2019, 13:36: Coil to 0 A.
Friday, May 31, 2019, 15:32: Successful wire scans across RPM0A & RPM0B (X,Y) and RPM6B & RPM6A (Y,X).
Friday, May 31, 2019, 16:27 : Wire scanners after the magnet look ok, but not enough beam to do a good emittance scan. Raised the tube heater to 310 A set point, got about 0.5nA at FC6. Probably could be solved with tuning, to be done Monday. Turning everything off but leaving target heating on. See pasted screenshots for current tune on mass 28.
Monday, June 03, 2019, 07:35: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 10 A.
Monday, June 03, 2019, 07:38: Coil @ 30 A.
Monday, June 03, 2019, 07:41: IV4 opened.
Monday, June 03, 2019, 07:48: BIAS / EE / EZL @ 0 kV. A named Hossein Rafighi with IT began poking around the HV rack and running cable w/ permission reference to Dale Nagra. Locked it out. No work permit was issued. Main Control Room Contacted.
Monday, June 03, 2019, 08:03: Cable run complete. Lock off. Sources on again.
Monday, June 03, 2019, 08:23: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 30 A.
Monday, June 03, 2019, 08:35: BIAS / EE / EZL @ 40 / -2 / 8 kV
Monday, June 03, 2019, 08:40: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 08:41: BIAS @ 45 kV.
Monday, June 03, 2019, 08:45: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. Mass Magnet MB1 left off.
Monday, June 03, 2019, 08:55: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 08:58: BIAS / EE / EZL @ 50 / -2 / 8 kV.
Monday, June 03, 2019, 09:07 : Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 09:21: 2 Sparks* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 09:29: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. BIAS @ 54 kV.
Monday, June 03, 2019, 09:31: BIAS / EE / EZL @ 55 / -2.5 / 8 kV.
Monday, June 03, 2019, 09:35: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset
Monday, June 03, 2019, 09:44: Spark* Optics tripped. Turbo pumps TP6 & TP1A Tripped. Close / re-open IV4. Reset
Monday, June 03, 2019, 09:49: Near BIAS 57.5 kV. Multiple sparks. BIAS unable to hold. Optics tripped, wire scanners & FC0 began running independently. Turbo pumps tripped.
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Monday, June 03, 2019, 09:57: Spark* Reset Optics. Turn off Optics for now.
Monday, June 03, 2019, 10:19: Spark* Reset Optics & Wire scanners. Anode current dropped from 10.989 mA to 7.768 mA
Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.
Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.
Monday, June 03, 2019, 11:02: BIAS / EE / EZL / Anode @ 0 kV.
Monday, June 03, 2019, 11:36: TGHT PS determined to have failed. Run w/ TBHT and test up to 50 kV.
Monday, June 03, 2019, 11:41: Sources on.
Monday, June 03, 2019, 13:17: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.
Monday, June 03, 2019, 13:24: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.
Monday, June 03, 2019, 13:37: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Monday, June 03, 2019, 13:49: Odd sound from Turbo pump TP6?
Vacuum @ 1.13e-06T. Was in the 5e-07 range earlier. Strip tool revealing gradual increase.
Monday, June 03, 2019, 13:52: Spark* Optics tripped, wire scanners & FC0 running independently. Reset
Monday, June 03, 2019, 14:13: Spark* Optics tripped. Loud, outside vacuum chamber.
Monday, June 03, 2019, 14:55: BIAS / EE / EZL @ 0 kV. Anode to 0 V.
Tuesday, June 04, 2019, 08:40: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.
Tuesday, June 04, 2019, 08:54: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.
Tuesday, June 04, 2019, 09:09: BIAS / EE / EZL @ 45 / -2.5 / 7.5 kV.
Tuesday, June 04, 2019, 09:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Tuesday, June 04, 2019, 10:21: Spark* Optics & Turbo pump TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.
Tuesday, June 04, 2019, 10:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Almost 1 hour of no sparks.
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
Tuesday, June 04, 2019, 10:32: BIAS / EE / EZL @ 51 / -2.5 / 7.5 kV.
Tuesday, June 04, 2019, 10:39: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.
Tuesday, June 04, 2019, 11:02: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.
Tuesday, June 04, 2019, 11:07: Spark* Outside TS. IG6 tripped / reset. BIAS current spike. EZL current dropped afterwards near 460 uA from 550 uA.
Tuesday, June 04, 2019, 11:22: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV.
Tuesday, June 04, 2019, 11:27: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.
Tuesday, June 04, 2019, 11:35: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.
Tuesday, June 04, 2019, 11:39: Spark* Optics tripped. Loud*, outside the vacuum chamber, above TS. EZL current jumped back up to 550 uA
BIAS current gradually increasing. from 50 uA to 55 uA since 11:35 spark.
Tuesday, June 04, 2019, 12:01: Runaway sparks* Turbo pumps & ion gauges tripped. Optics tripped. Wire scanners running independently. Both quiet & loud sparks. 3 Consistent marks in the strip tool. Reset.
Brought BIAS down to 55 kV. EE to -2.5 kV. BIAS & EZL currents have a small drop.
Tuesday, June 04, 2019, 13:21: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Over 1 hr no sparks.
Tuesday, June 04, 2019, 13:34: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.
Tuesday, June 04, 2019, 13:40: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.
Tuesday, June 04, 2019, 13:41: Spark* Optics & Turbo pump - TP6 tripped. Wire scanners and FC0 operated independently. Restarted. Quiet spark* Inside Vacuum chamber.
Tuesday, June 04, 2019, 13:46: Spark* Loud*, outside the vacuum chamber, above TS. EZL current jumped from 580 uA to 610 uA approx & is gradually increasing. BIAS current slowly decreasing.
Tuesday, June 04, 2019, 14:02: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV. Variation in EZL & BIAS currents noted.
Tuesday, June 04, 2019, 14:08: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.
Tuesday, June 04, 2019, 14:28: 20 minutes. No Spark.
Tuesday, June 04, 2019, 14:47: BIAS / EE / EZL @ 0 kV. Anode to 0 V.
Wednesday, June 05, 2019, 08:34: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.
Wednesday, June 05, 2019, 08:35: Coil down from 30 to 0 A.
Wednesday, June 05, 2019, 08:36: Open IV4.
Wednesday, June 05, 2019, 08:37: Optics on / reset.
Wednesday, June 05, 2019, 08:38: Anode to 400 V.
Wednesday, June 05, 2019, 08:44: Anode to 450 V. TBHT @ 305 A.
Wednesday, June 05, 2019, 11:15: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV. Anode @ 200 V.
Wednesday, June 05, 2019, 11:30: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Wednesday, June 05, 2019, 11:40: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.
Wednesday, June 05, 2019, 11:53: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 12:04: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber. bias to 54.9 kV.
Wednesday, June 05, 2019, 12:04: IV4 closed.
Wednesday, June 05, 2019, 12:15: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 12:16: Spark* Loud*, outside the vacuum chamber, above TS. EZL current came down from 601 uA to 537uA . IG6 off. Restarted. Bias to 54.9 kV.
Wednesday, June 05, 2019, 12:24: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 12:35: Spark* inside vacuum chamber. Optics & turbo pumps tripped
Wednesday, June 05, 2019, 13:35: Note* 1 hour @ 55 kV no sparks.
Wednesday, June 05, 2019, 13:42: BIAS / EE / EZL @ 56 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 13:49: BIAS / EE / EZL @ 57 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 13:52: TSG:CB1 went red. Communication lost it.
Wednesday, June 05, 2019, 13:54: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 14:01: Spark* inside vacuum chamber. Optics & turbo pumps tripped. Appears to be on the Anode. The test stand phone also redialed the last number contacted on its own.
Wednesday, June 05, 2019, 14:25: BIAS / EE / EZL @ 0 kV. Anode to 0 V. Auto-cooling @ 2 A per min.
Thursday, June 06, 2019, 09:10: Gas lines closed. Sources off. Optics off.
Thursday, June 06, 2019, 09:13: EE / BIAS on.
Thursday, June 06, 2019, 09:20: BIAS @ 30 kV.
Thursday, June 06, 2019, 09:30: BIAS @ 40 kV.
Thursday, June 06, 2019, 09:40: BIAS @ 45 kV. EZL slowly charging (Not on) from 12 to 420 V. EE with -15 V.
Thursday, June 06, 2019, 09:48: BIAS @ 50 kV. EZL / EE @ 606 / -17 V.
Thursday, June 06, 2019, 10:06: BIAS @ 52.2 back to 50 kV. Loud buzzing heard up top. Charge on EZL from 600 V to 1200 - 2000 V fluctuations. EZL & EE to be brought up before we break something.
Thursday, June 06, 2019, 10:16: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Thursday, June 06, 2019, 10:27: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV.
Thursday, June 06, 2019, 10:39: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.
Thursday, June 06, 2019, 11:04: BIAS / EE / EZL @ 58 / -2.9 / 7.5 kV.
Thursday, June 06, 2019, 11:06: Buzzing / crackling up top in the cage again. Unstable voltage drops. BIAS to 57 kV.
Thursday, June 06, 2019, 11:11: BIAS / EE / EZL @ 58 / -2.9 / 8.25 kV.
Thursday, June 06, 2019, 11:27: BIAS was up to 58.5 & EZL to 9 kV. Buzzing / crackling. Unstable voltage drops / Current increase. BIAS / EZL to 57.5 / 8.5 kV.
Thursday, June 06, 2019, 11:36: BIAS was up to 58.0 & EZL to 9 kV. Buzzing / crackling. More unstable voltage drops / Current increases. BIAS dropped on it's own to 56.1 kV. BIAS / EZL to 56 / 7.5 kV.
Thursday, June 06, 2019, 11:36: Spark*. Inside chamber. Turbo pumps tripped. Buzzing stopped.
Thursday, June 06, 2019, 11:51: Unable to surpass 57 kV before voltage breakdown. Buzzing comes back. Breakdown dropped to 51 kV on BIAS.
Thursday, June 06, 2019, 11:53: BIAS @ 50 kV. EZL to 0, PS off, in attempt to relieve EZL current.
Thursday, June 06, 2019, 11:56: BIAS @ 50 kV. EZL to 7.5 kV w/ 1245 uA. Typically at 550-600 uA on EZL. Unable to relieve the current.
Thursday, June 06, 2019, 12:18: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV. Current: BIAS / EZL @ 65 / 1306 uA.
Thursday, June 06, 2019, 13:14: BIAS / EE / EZL @ 56 / -2.7 / 7.25 kV. Current: BIAS / EZL @ 70 / 1450 uA.
Thursday, June 06, 2019, 13:15: Voltage breakdown. Buzzing / crackling back. Breakdown dropped to 56.2 kV on BIAS. BIAS set to 56.1 kV to stabilize.
Thursday, June 06, 2019, 13:19: EZL current limit increased.
Thursday, June 06, 2019, 13:30: BIAS / EE / EZL @ 56.5 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1856 uA.
Thursday, June 06, 2019, 13:31: Passed to BIAS 56.6 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.6 kV on BIAS. BIAS set to 55.5 kV to stabilize.
Thursday, June 06, 2019, 13:51: BIAS / EE / EZL @ 56.2 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1950 uA.
Thursday, June 06, 2019, 13:52: BIAS 56.3 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.1 kV on BIAS. BIAS set to 55.0 kV to stabilize. Unable to regain HV. Decreases each time we go up.
Thursday, June 06, 2019, 14:00: Limited via the test stand voltage breakdown up in the cage. Source tray held @ 58 kV.
Bring it down.
Thursday, June 06, 2019, 14:31: BIAS / EE / EZL @ 0 kV.
Friday, June 07, 2019, 06:41: Power / Sources off.
Friday, June 07, 2019, 06:43: IG1 & Turbo pumps off.
|
Attachment 1: TM4_Source_Tray_-_2019_-_2.docx
|
Attachment 2: TS-2019-05-29-07-08.rga
|
Attachment 3: TM4_Source_Tray_-_2019_-_3_-_HV_-_1.docx
|
Attachment 4: TM4_Source_Tray_-_2019_-_4_-_HV_-_2_-_Heat_on.docx
|
Attachment 5: TM4_Source_Tray_-_2019_-_5_-_HV_over_50_-Heat_on.docx
|
|
726
|
Monday, June 03, 2019, 11:35 |
Aaron Schmidt | | LP-SIS | | TM4 | 395530-3 | 42752-5 | Problems/Solutions | TGHT PS Failed. | Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.
Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.
PS model: Xantrex XPR 10-600
Message lights on the front of the power supply:
OTP - INT - OVP - SNS Triggered.
Front Panel Display, Status Annunciators
1. AC: The AC input is out of range and has
caused the output of
the supply to be
shut down (red)
2. OTP: The internal Over Temperature
Protection threshold has been exceeded,
disabling the supply output until the sensor
s cool to within the normal operating
temperature range (red)
3. INT: The external shutdo
wn line has been asserted, disabling the output of the
supply (green)
4. OVP: The output Over Voltage Prot
ection threshold have been exceeded,
latching the supply output off (red)
5. SNS: The remote sense line protection
circuit has been activated, latching the
supply output off (red)
6. ON: The supply output
is enabled (green)
7. OFF: The supply output
has been disabled (green)
8. LCL: The supply is in
Local control mode (green)
9. RMT: The supply is in Remote program mode (green)
10. CV: The supply is operating in
Constant Voltage mode (green)
11. CC: The supply is operating in
Constant Current mode (green)
Thursday, June 13, 2019, 14:05: ELOG 732 - PS replaced. |
|
727
|
Monday, June 03, 2019, 14:13 |
Aaron Schmidt | | | | TM4 | 395530-3 | 42752-5 | Done | TMS:TP6 Turbo pump issue. (Ok now) | Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.
The sound tapered off.
Monday, June 03, 2019, 14:32: Sound was the turbo pump spinning down. Edi restarted & reset the main controller. It was knocked out by one of the morning sparks.
|
|
729
|
Monday, June 10, 2019, 14:34 |
Aaron Schmidt | | | | | | | Done | Removed TM4 Source Tray | Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area. |
|