  Test-Stand, Page 3 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  574   Friday, March 24, 2017, 14:43 Aaron SchmidtTa#51LP-SISITWTM241790-441751-5In progressConditioning Ta#51Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo
pumps on.
 9x 
  588   Friday, June 02, 2017, 15:57 Aaron SchmidtSiC#36HP-FEBIAD-CTLITWTM241369-1042132-6/9 Conditioning SiC#36Friday, June 02, 2017, 15:20: Coil loose
(Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing
 9x 
  594   Friday, June 30, 2017, 13:31 Aaron SchmidtTa#53HP-SISITWTM242218-641751-6In progressConditioning Ta#53 Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo
pumps on.
 Ta#53.docxTS-2017-06-30-14-35.rga 
  596   Monday, July 10, 2017, 13:27 Aaron SchmidtTa#53HP-SISITWTM242218-641751-6In progressConditioning Ta#53Monday, July 10, 2017, 14:03: Roughing.
Monday, July 10, 2017, 14:27: Turbo
pumps started.
 7x 
  605   Wednesday, September 20, 2017, 14:11 Aaron SchmidtTa#54HP-SISITWTM242218-10 In progressConditioning Ta#54Wednesday, September 20, 2017, 14:08: Roughing.
Wednesday, September 20, 2017, 14:28:
Turbos on.
 6x 
  649   Friday, March 16, 2018, 08:15 Aaron SchmidtNb#8HP-SISITWTM238817-242738-12In progressConditioning Nb#08Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo
pumps started.
 6x 
  683   Friday, August 31, 2018, 12:27 Aaron SchmidtnSiC#1LP-SISITWTM243044-142752-4In progressConditioning nSiC#1Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started.
 15x 
  685   Monday, September 17, 2018, 11:52 Aaron SchmidtUC#25LP-SISITWTM2 42752-9In progressConditioning Heat Shield for UC#25Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51:
 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx 
  790   Tuesday, March 17, 2020, 11:40 Aaron SchmidtSiC#40HP-SISITWTM242218-843515-8In progressConditioning SiC#40Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines
re-opened except FS#5 (HS cooling).
 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx 
  794   Wednesday, June 10, 2020, 08:23 Aaron SchmidtC#1LP-SISITWTM243044-843515-3In progressConditioning C#1Salts: 
Li - 10 uL
Na - 10 uL
 7x 
  795   Tuesday, June 16, 2020, 11:03 Aaron SchmidtTa#60LP-SISITWTM244139-1343515-5In progressConditioning Ta#60 Tuesday, June 16, 2020, 11:01: Turbo pumps
on.

Wednesday, June 17, 2020,
 Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt 
  814   Wednesday, September 30, 2020, 06:23 Aaron SchmidtC#2LP-SISITWTM244139-943515-2In progressConditioning C#2Wednesday, September 30, 2020, 06:14: Power
/ sources on.
Wednesday, September 30, 2020, 06:17:
 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx 
  817   Tuesday, October 27, 2020, 08:54 Aaron SchmidtNb#9 LP-SISITWTM244508-243515-4In progressNb#9 ConditioningTuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13:
TP1B on.
 Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt 
  819   Friday, November 06, 2020, 12:53 Aaron SchmidtNb#9LP-SISITWTM244508-243515-4In progressConditioning Nb#9 w/ P/S Target & BracketAttached end plate parasitic / symbiotic
target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24:
 7x 
  874   Wednesday, May 26, 2021, 14:29 Aaron SchmidtUC#33 (HS)LP-SISITWTM2 44378-3In progressUC#33 HS conditioningHS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B
 Conditioning_UC#33_HS.docx 
  899   Tuesday, September 14, 2021, 17:12 Aaron SchmidtC#3LP-SISITWTM244691-744378-11In progressC#3 ConditioningTuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37:
TP1B on.
 6x 
  903   Thursday, October 14, 2021, 10:13 Aaron Schmidt LP-SISITWTM2 44378-22In progressConditioning UC#36 HSTube / TGHT only.
Thursday, October 14, 2021, 10:11:
Roughing.
 UC#36.docx 
  916   Tuesday, April 05, 2022, 14:01 Aaron SchmidtTest FEBIAD TM2-2022LP-FEBIADITWTM2 42752-5 Test FEBIAD & TS operationTuesday, April 05, 2022, 13:57: Roughing.
BV1B.
Tuesday, April 05, 2022, 14:04: BV1A
 Test_Target_LP-FEBIAD_TM2-2022.docx 
  917   Thursday, April 07, 2022, 11:19 Aaron SchmidtTest FEBIAD TM2-2022 ITWTM2 42752-5 Test FEBAID & TS operation Gas system switched on manually to
use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25:
  
  928   Wednesday, May 25, 2022, 15:48 Aaron SchmidtSiC#42HP-FEBIADITWTM244692-944378-5In progressConditioning SiC#42Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B
on.
 ER-580-290-30kV-m28.txtSiC#42.docxSiC#42_Conditioning_-_R.docx 