Entry  Friday, March 24, 2017, 14:43, Aaron Schmidt, Ta#51, LP-SIS, ITW, TM2, 41790-4, 41751-5, In progress, Conditioning Ta#51 9x
Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo pumps on.
Friday, March 24, 2017, 16:04: Ion gauge on.
Entry  Friday, June 02, 2017, 15:57, Aaron Schmidt, SiC#36, HP-FEBIAD-CTL, ITW, TM2, 41369-10, 42132-6/9, , Conditioning SiC#36 9x
Friday, June 02, 2017, 15:20: Coil loose (Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing
Friday, June 02, 2017, 16:13: Turbo pumps on.
Entry  Friday, June 30, 2017, 13:31, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53  Ta#53.docxTS-2017-06-30-14-35.rga
Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo pumps on.
Friday, June 30, 2017, 14:31: Ion gauge on.
Entry  Monday, July 10, 2017, 13:27, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53 7x
Monday, July 10, 2017, 14:03: Roughing.
Monday, July 10, 2017, 14:27: Turbo pumps started.
Monday, July 10, 2017, 14:33: Ion gauge on.
Entry  Wednesday, September 20, 2017, 14:11, Aaron Schmidt, Ta#54, HP-SIS, ITW, TM2, 42218-10, , In progress, Conditioning Ta#54 6x
Wednesday, September 20, 2017, 14:08: Roughing.
Wednesday, September 20, 2017, 14:28: Turbos on.
Wednesday, September 20, 2017, 14:33: Ion gauge on.
Entry  Friday, March 16, 2018, 08:15, Aaron Schmidt, Nb#8, HP-SIS, ITW, TM2, 38817-2, 42738-12, In progress, Conditioning Nb#08 6x
Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo pumps started.
Friday, March 16, 2018, 10:40: Ion gauge on.
Entry  Friday, August 31, 2018, 12:27, Aaron Schmidt, nSiC#1, LP-SIS, ITW, TM2, 43044-1, 42752-4, In progress, Conditioning nSiC#1 15x
Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo pumps started.

Wednesday, September 05, 2018, 11:03: RGA on.
Entry  Monday, September 17, 2018, 11:52, Aaron Schmidt, UC#25, LP-SIS, ITW, TM2, , 42752-9, In progress, Conditioning Heat Shield for UC#25 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx
Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51: Roughing. Doors sealed
Monday, September 17, 2018, 12:30: Turbo pumps started.
Entry  Tuesday, March 17, 2020, 11:40, Aaron Schmidt, SiC#40, HP-SIS, ITW, TM2, 42218-8, 43515-8, In progress, Conditioning SiC#40 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx
Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines re-opened except FS#5 (HS cooling).
Tuesday, March 17, 2020, 12:08: Turbo pumps on.
Entry  Wednesday, June 10, 2020, 08:23, Aaron Schmidt, C#1, LP-SIS, ITW, TM2, 43044-8, 43515-3, In progress, Conditioning C#1 7x
Salts: 
Li - 10 uL
Na - 10 uL
Entry  Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60  Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt
Tuesday, June 16, 2020, 11:01: Turbo pumps on.

Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.
Wednesday, June 17, 2020, 07:51: Power / Sources on.
Entry  Wednesday, September 30, 2020, 06:23, Aaron Schmidt, C#2, LP-SIS, ITW, TM2, 44139-9, 43515-2, In progress, Conditioning C#2 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx
Wednesday, September 30, 2020, 06:14: Power / sources on.
Wednesday, September 30, 2020, 06:17: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Wednesday, September 30, 2020, 06:22: Optics set (minus MB1).
Entry  Tuesday, October 27, 2020, 08:54, Aaron Schmidt, Nb#9 , LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Nb#9 Conditioning Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt
Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13: TP1B on.
Tuesday, October 27, 2020, 10:13: TP1A on.
Entry  Friday, November 06, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Conditioning Nb#9 w/ P/S Target & Bracket 7x
Attached end plate parasitic / symbiotic target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: Roughing.
Friday, November 06, 2020, 12:53: TP1B on.
Entry  Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning Conditioning_UC#33_HS.docx
HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on. 
Entry  Tuesday, September 14, 2021, 17:12, Aaron Schmidt, C#3, LP-SIS, ITW, TM2, 44691-7, 44378-11, In progress, C#3 Conditioning 6x
Tuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37: TP1B on.
Tuesday, September 14, 2021, 17:47: TP1A on.
Entry  Thursday, October 14, 2021, 10:13, Aaron Schmidt, , LP-SIS, ITW, TM2, , 44378-22, In progress, Conditioning UC#36 HS UC#36.docx
Tube / TGHT only.
Thursday, October 14, 2021, 10:11: Roughing.
Thursday, October 14, 2021, 12:05: TP1B on. 
Entry  Tuesday, April 05, 2022, 14:01, Aaron Schmidt, Test FEBIAD TM2-2022, LP-FEBIAD, ITW, TM2, , 42752-5, , Test FEBIAD & TS operation Test_Target_LP-FEBIAD_TM2-2022.docx
Tuesday, April 05, 2022, 13:57: Roughing. BV1B.
Tuesday, April 05, 2022, 14:04: BV1A on.
Tuesday, April 05, 2022, 14:28: TP1B on.
Entry  Thursday, April 07, 2022, 11:19, Aaron Schmidt, Test FEBIAD TM2-2022, , ITW, TM2, , 42752-5, , Test FEBAID & TS operation 
 Gas system switched on manually to use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: Roughing. 
Thursday, April 07, 2022, 11:17: TP1B on.
Entry  Wednesday, May 25, 2022, 15:48, Aaron Schmidt, SiC#42, HP-FEBIAD, ITW, TM2, 44692-9, 44378-5, In progress, Conditioning SiC#42 ER-580-290-30kV-m28.txtSiC#42.docxSiC#42_Conditioning_-_R.docx
Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on.