  Test-Stand, Page 30 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject
  985   Thursday, November 16, 2023, 09:43 Aaron Schmidt LP-SIS    In progressThermal tests

Aurelia has been testing on the ISAC TS since last week. Thermocouples are installed in the end cap, left side & the ionizer.

No elog was initiated, but much has happened.

Site wide power outage on Friday/Saturday caused problems. The TS was running at that time & was also affected. Reboots occurred on the weekend & testing resumed. IG6 was reset yesterday.

Thursday, November 16, 2023, 09:30: IV4 closed. TP6, TP2, TP1B, TP1A off. IG6 & IG1 off. PS off.


Thursday, November 16, 2023, 13:11: TP6 & TP2 restarted.


Monday, November 20, 2023, 12:06: IV4 closed. IG6 off. TP6 & TP2 off.

Monday, November 20, 2023, 12:42: Venting beamline side.

  986   Monday, November 27, 2023, 16:09 Ferran Boix Pamies LP-SIS  45220-245235-13In progressHV power surge test plus mass scans

Monday, November 27, 2023, 16:09  Roughing

Monday, November 27, 2023, 17:22 Both turbos are on, leaving vacuum over night.

Tuesday, November 28, 2023, 09:28  after pumping over night IG1 is at .15e-6 T. Water cooling on.

Tuesday, November 28, 2023, 14:34  HV test started. Sparks on the TC seen at BIAS/EE/EZL 31/-1.8/15kV. TC values recovered after sparks, TP6 tripped during sparks as well. Venting chamber to reposition TC.

Tuesday, November 28, 2023, 17:37 I couldn't manage to close properly the side door of the chamber... waiting for help tomorrow.

Wednesday, November 29, 2023, 10:51 Roughing started earlier in the morning. IG1 at 1e-5 T. Ramping up bias.

Wednesday, November 29, 2023, 11:41 HV tests lead to 45kV sparks on the TC. Nothing seen on the RPi.

Wednesday, November 29, 2023, 13:22 The ballast of TMSRP2 was opened to attempt to improve the roughing in the beam line section. Things appear to be somehow better now, TMSTP6 and TMSTP2 are on now.

Wednesday, November 29, 2023, 16:00 IG1 is at 3.58e-6. HV tests starting again.

Wednesday, November 29, 2023, 23:36 HV tests ended earlier in the afternoon. No spark up to 55kV when gauge in the HV cage started sparking as usual.

Wednesday, November 29, 2023, 23:38 TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:400A, TBHT:160A

Thursday, November 30, 2023, 09:05  TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:580A, TBHT:230A

Thursday, November 30, 2023, 12:12 Mass scans started earlier in the morning. 1st scan completed at 0.1A/s, repeating it again now with 0.05A/s.

Thursday, November 30, 2023, 15:04 HV tests again up to 55kV. 2 sparks inside the vacuum, to be checked if they affected TC measurement with the pi. Gauge still sparks in the upper HV cage.

Friday, December 01, 2023, 12:05.  Error saving mass scan data Thursday. Repeating mass scans at 0.02,0.01,0.005 scan speeds. note* must delete old data prior to saving. -> save procedure: Delete Old Data, Right click plot, save as plot.txt, click Clean, Show/Save Data, enter file name and save. Filenames: 2023-12-01-* 

Friday, December 01, 2023, 15:22.  Spent some time selectively tuning various elements of the beam. Report in local folder, file "2023-12-01 beam tuning".

Friday, December 01, 2023, 15:23. Recording mass scan with inactive quadrupole elements. File name 2023-12-01_Q-off.txt

Sunday, December 03, 2023, 22:02 : Vacuum looks good.  4e-7 T.   Heating up target for Monday morning. 1A/30s up to TGHT:580A, TBHT:230A

Monday, December 04, 2023, 12:21: This morning, increased BIAS to 30kV. Ran mass scan with adjusted beam tune up to FC0. This mass scan was repeated with inactive quadrupole elements up to FC0 to compare with Friday.  2023-12-02_RBsalt_SIS_test1.txt and 2023-12-02_RBsalt_SIS_test2.txt

Tuesday, December 05, 2023, 14:12 HV tests restarted, TC wire brought closer to the ground wall. IG1 at 2.3e-6 T. Ramping up HV.

Wednesday, December 06, 2023, 13:48 Both yesterday and today the TC wire was not close enough to spark even at 60kV. Venting the chamber one more time to bring the TC closer. 

Thursday, December 07, 2023, 10:18 Vacuum at 5e-7T we see sparks at about 47kV. Lost control of epics during sparks, PS shut off manually. Everything recovered after.

Thursday, December 07, 2023, 13:32 After spark tests at ~55kV, Pi seems not to be affected by the sparks. Tests without the power surge components yielded similar results. We discovered that the sparks on the TC are partially diverted by spark gaps and probably other elements in the top HV cage.

 Monday, December 11, 2023, 10:35 Turbopumps winding down.

  991   Thursday, January 18, 2024, 10:49 Aaron Schmidt LP-SIS  44139-245235-22In progressConditioning UCx HS

Straight/closed TGHT tube oven installed. SIS Assembly.

Thursday, January 18, 2024, 10:32: Roughing.

Thursday, January 18, 2024, 10:57: TP1B on.

Thursday, January 18, 2024, 11:08: TP1A on.

Thursday, January 18, 2024, 11:17: IG1 on.

Thursday, January 18, 2024, 11:27: IV4 cycled ok.

Thursday, January 18, 2024, 12:07: IV4 open. PS / Sources on. Waterlines already open.

Thursday, January 18, 2024, 14:57: TPS:Q1 un-plugged, cycled, & reset. OK. Optics set to previous tune.


Friday, January 19, 2024, 06:45: TGHT on. Auto-ramping TGHT to 580 A @ 2 A per min. 

 

Friday, January 19, 2024, 13:30: BIAS on at 30kV , preparing for mass scan  - dn

Friday, January 19, 2024,  13:45: noting that mass scan 'field' parameter is not displayed in scanner. nor does the hall probe seem to be registering any changes on the magnet -dn

Friday, January 19, 2024,  15:00: after troubleshooting for quite a while, we fixed the problem by resetting/reconfiguring the canbus controllers. IOC reset did not help the problem and nor did power cycling the box 2A-5, which is believed to be routed to the hall probe.

noted that resetting the IOC did trip the BIAS and drop it to 0V.

Friday, January 19, 2024,  15:15: BIAS back to 30kV, resume mass scan.

Friday, January 19, 2024, 16:00, mass scan completed, data extracted.

Friday, January 19, 2024, 16:36: BIAS brought down to 0V over 15 min. auto cooling initiated at -1A / 30s


Monday, January 22, 2024, 10:36: EZL / EE to 0 V. Sources off.

Monday, January 22, 2024, 10:39: IV4 & FC0 closed.

Monday, January 22, 2024, 10:41: Power off. IV4 reset.

Monday, January 22, 2024, 10:42: IG1 off. Turbo pumps off.

Monday, January 22, 2024, 12:29: Venting via the turbo pumps.

  992   Monday, January 22, 2024, 13:55 Aaron Schmidt LP-SIS  45447-1945235-22In progressConditioning UCx HS - 2

Conditioning HS for UCx. LP-SIS oven / end caps installed

Monday, January 22, 2024, 13:53: Roughing.

Monday, January 22, 2024, 14:21: TP1B On.

Monday, January 22, 2024, 14:34: TP1A on.

Monday, January 22, 2024, 14:41: IG1 on. Vacuum @ 3.95e-05T & dropping.

Monday, January 22, 2024, 14:46: FS#5 open. Vacuum stable. 2.41e-05T & dropping. Power on.


Tuesday, January 23, 2024, 07:40: IV4 open.

Tuesday, January 23, 2024, 07:42: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute. 

Tuesday, January 23, 2024, 13:43 increasing BIAS to 30kV - dn 

Tuesday, January 23, 2024, 14:03 BIAS at 30kV

Tuesday, January 23, 2024, 14:06 beginning mass scan

Tuesday, January 23, 2024, 16:06: Data exported and saved

 Tuesday, January 23, 2024, 16:15: Decreasing BIAS to 0V

Tuesday, January 23, 2024, 16:27: BIAS at 0V

Tuesday, January 23, 2024, 16:41:   Vacuum in main chamber consistently at ~1.4e-6 T throughout. 


Wednesday, January 24, 2024, 07:39: Auto-cooling @ 2 A per min. 

Wednesday, January 24, 2024, 08:59: Auto-cooling Halted. Auto-ramp back up to 580 / 230 A @ 2 A per min. 

Wednesday, January 24, 2024, 15:30:  Target already hot  - TBHT 230A, TGHT 580A

Wednesday, January 24, 2024, 15:31: increasing BIAS to 30kV  

Wednesday, January 24, 2024, 15:41: beginning mass scan - Completed and repeated for confirmation

Wednesday, January 24, 2024, 16:55: decreasing BIAS to 0kV

Wednesday, January 24, 2024, 17:10: BIAS at 0kV

 Thursday, January 25, 2024, 10:13: increasing bias to 30kV

Thursday, January 25, 2024, 10:30: BIAS at 30kV

Thursday, January 25, 2024, 10:40 : beginning mass scan 

Thursday, January 25, 2024, 13:41 Tuned various parameters, multiple mass scans 

Thursday, January 25, 2024, 16:19:  decreasing BIAS to 0V

Thursday, January 25, 2024, 16:42  BIAS at 0V

Thursday, January 25, 2024, 16:42 Target cooling.

 
 


 

Monday, January 29, 2024, 08:55:     Closed IV4, switched off turbo pumps, and opened VV1 to vent test stand and bring to atmospheric pressure. In preparation to remove target and add high mass salt.

Monday, January 29, 2024, 09:04:   Does not appear to be venting. investigating. appears that the valve did not actuate on first instruction. Worked on repeated attempt.

Monday, January 29, 2024, 11:43 : at 700+ T, opening for target assembly removal.

 Monday, January 29, 2024, 12:37 10µL Rb salt added to target. Assembly placed back into test stand. Pumping down.

 Tuesday, January 30, 2024, 09:25: Vacuum stable. 8e-7 T.  Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.

Tuesday, January 30, 2024, 15:13:   increasing BIAS to 30kV 

Tuesday, January 30, 2024, 15:39  bias at 30kV, beginning mass scan 

Tuesday, January 30, 2024, 16:48 Scans complete, lowering bias.

 Wednesday, January 31, 2024, 16:02 increasing bias to 30kV

Wednesday, January 31, 2024, 16:40 scanned

Wednesday, January 31, 2024, 16:40 decreasing bias 

Wednesday, January 31, 2024, 16:48 bias at 0V. cooling target 

Thursday, February 01, 2024, 09:21:   venting 

Thursday, February 01, 2024, 11:14 :  removed target assembly. added 5 salts: Na, Li,K,Rb,Cs.   Placed target assembly back in test stand. pumping down.

Thursday, February 01, 2024, 16:51 Vacuum at 2e-6

Thursday, February 01, 2024, 16:52 heating target. TGHT and TBHT to 580 230 A overnight. .6A / min and .2A / min

Friday, February 02, 2024, 10:17 Target hot. Vacuum stable at 1e-6. increasing bias to 30kV 

Friday, February 02, 2024, 10:42 scanning 

Friday, February 02, 2024, 16:06 reducing bias 

Friday, February 02, 2024, 16:18 bias at 0V. cooling target to 0 A at 2A per minute 


PS & breaker off earlier via DN. 

Monday, February 05, 2024, 13:58: TS was vented. HS removed - AS. 

  993   Tuesday, February 06, 2024, 11:48 Aaron SchmidtSiC# (Stock)HP-SIS  41369-245235-14In progressConditioning (Stock SiC-24C) SiC HP-SIS

Tuesday, February 06, 2024, 11:45: Roughing.

Tuesday, February 06, 2024, 13:27: TP1B on.

Tuesday, February 06, 2024, 13:33: TP1A on.

Tuesday, February 06, 2024, 13:47: IG1 on.


Wednesday, February 07, 2024, 06:54: Vacuum @ 7.55e-07T.

Wednesday, February 07, 2024, 06:56: PS on. FS#5 open. Vacuum stable.

Wednesday, February 07, 2024, 06:58: Coil jumped from 0A with the breaker off to 200 A w/ 4.2 V.

Wednesday, February 07, 2024, 06:59: Coil PS switched on. Increase coil current to 75 A & back down again. No change. Will need to trouble shoot this once this target is complete.

Wednesday, February 07, 2024, 07:04: Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min. Good vac / bad vac settings set back to 5.00e-06T / 7.00e-06T. Note: The TS will trip at 1.00e-05T.

Wednesday, February 07, 2024, 07:09: FC0 still acting up. Optics on.

Wednesday, February 07, 2024, 10:28:  Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Wednesday, February 07, 2024, 12:10: IV4 open.

Wednesday, February 07, 2024, 12:14: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, February 07, 2024, 12:15 : Opening & Closing FC0 for a measurment does not interfere with IV4.

Wednesday, February 07, 2024, 12:42: One audible spark. Knocked out TMS : Q2/Q5. Reset.

Wednesday, February 07, 2024, 13:34: Mass & Wire scans complete with 2 tunes. Ok.


Thursday, February 08, 2024, 09:02: Auto-cooling @ 2A per min.


Coil PS removed. (See elog 995)

Friday, February 16, 2024, 04:57: IV4 closed

Friday, February 16, 2024, 04:58: IG1 & TP off.

  996   Friday, February 16, 2024, 10:30 Aaron SchmidtSiC# (Stock)HP-FEBIAD  45447-445235-21In progressConditioning stock SiC HP FEBIAD

Friday, February 16, 2024, 10:30: Roughing

Friday, February 16, 2024, 17:38: TP1B on. 

Friday, February 16, 2024, 17:47: TP1A on. 

Friday, February 16, 2024, 17:55: IG1 on. New Coil PS was installed.


Tuesday, February 20, 2024, 07:51: Waterline FS#5 open.

Tuesday, February 20, 2024, 07:58: Cage closed. PS on.

Tuesday, February 20, 2024, 08:01: Check. TGHT / TBHT manually to 5 / 5 A. Coil & Anode not responding.

Tuesday, February 20, 2024, 09:40: Pressure gauge reconnected within cage. Gas lines purged, refilled with argon. SV5 closed.

Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.

Coil set to 15 A, did not adjust.

Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.

Tuesday, February 20, 2024, 12:24: SV4 open. SV5 is closed. Cage is closed.

Tuesday, February 20, 2024, 12:26: All power & sources on.

Tuesday, February 20, 2024, 12:29: Optics on & set w/ updated tune.

Tuesday, February 20, 2024, 12:56: PS off to switch to Cathode BIAS mode.

Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D. Cage closed up. PS on.

Tuesday, February 20, 2024, 14:52: Anode/Cathode short. PS off & remove the cage again.

Tuesday, February 20, 2024, 15:20: IG1 off. Chamber TP off.


Wednesday, February 21, 2024, 07:30: Venting.

Wednesday, February 21, 2024, 08:32: Short found on waterlines (E) to (D)

Wednesday, February 21, 2024, 08:34: IG1 Bypass in effect.

Wednesday, February 21, 2024, 08:37: BIAS / EE / EZL to 1 / -0.5 / 0.5 kV. Note* If voltage is put on the EE before the BIAS, a small amount of voltage also goes to the BIAS. To keep an eye on. Back to 0 V.

Wednesday, February 21, 2024, 08:40: Coil to 5 A, Anode to 50 V. OK. Back to 0 A / V

Wednesday, February 21, 2024, 08:41: TGHT / TBHT both to 5 / 5 A ok. Back to 0 A. All checks ok.

Wednesday, February 21, 2024, 08:42: IG1 Bypass removed.

Wednesday, February 21, 2024, 09:14: TP1B on.

Wednesday, February 21, 2024, 09:22: TP1A on.

Wednesday, February 21, 2024, 09:31: IG1 on.

Wednesday, February 21, 2024, 14:00: HV & Coil checks. OK. IV4 open.


Thursday, February 22, 2024, 08:17: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, February 22, 2024, 08:23: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, February 22, 2024, 08:26:  BIAS / EE / EZL @ 45 / -2.0 / 19 kV. 2 large sparks on the tap up.

Thursday, February 22, 2024, 08:42: BIAS / EE / EZL @ 47.5 / -2.0 / 22 kV. Small sparks on the tap up

Thursday, February 22, 2024, 09:00: BIAS / EE / EZL @ 50 / -2.0 / 25 kV. Sparks on the tap up.

Thursday, February 22, 2024, 09:10: One spark. Reset steering & optics.

Thursday, February 22, 2024, 09:17: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, February 22, 2024, 09:39: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.13e-07.

Thursday, February 22, 2024, 12:06: Coil @ 0 A

Thursday, February 22, 2024, 12:10: Anode @ 100 V.

Thursday, February 22, 2024, 12:12: Anode @ 200 V.

Thursday, February 22, 2024, 12:16: Anode @ 500 V.

Thursday, February 22, 2024, 12:26: Anode @ 0 V.

Thursday, February 22, 2024, 12:38: BIAS / EE / EL @ 0 kV.

Thursday, February 22, 2024, 12:58: Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min. 

Thursday, February 22, 2024, 16:25: Vacuum @ 1.16e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Thursday, February 22, 2024, 18:35: TGHT / TBHT @ 580 / 290 A. 

Thursday, February 22, 2024, 18:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. FC0 @ 100nA = 7.71e-09 

Thursday, February 22, 2024, 18:48: Anode @ 100 V. Coil to 10 A. FC0 @ 100nA = 6.82e-09 

Thursday, February 22, 2024, 19:00: FC0 is stuck!!!. However it is not releasing HPA? Confirmed by the MCR over MS teams video chat. IV4 Closed. (Angry tech noises)

Thursday, February 22, 2024, 19:02: BIAS/ EE / EZL @ 0 KV. Anode & Coil to 0. 

Thursday, February 22, 2024, 19:07: Auto-cooling @ 2 A per minute. 

Thursday, February 22, 2024, 19:08: Closed SV4 & SV5. 


Friday, March 08, 2024, 06:59: Issues with FC0 & RP2 resolved. Soft start on TP6 initiated.

Friday, March 08, 2024, 07:06: Gas lines filled with Argon.

Friday, March 08, 2024, 07:08: Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 200 A

Friday, March 08, 2024, 07:32: TBHT @ 41 A. TGHT @ 0 A?

Friday, March 08, 2024, 07:35: TGHT PS was physically off (Why???). Turned on. Manually tapped up to 25 A. Ok. Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.

Friday, March 08, 2024, 08:05: TP6 tripped. Half way spun up. Soft start restarted.

Friday, March 08, 2024, 08:47: TP6 at speed. TP2 on.

Friday, March 08, 2024, 08:52: IG6 on.

Friday, March 08, 2024, 09:05: Optics on. Quick checks on BIAS / EE / EZL, Cathode (Anode), & Coil OK. 

Friday, March 08, 2024, 09:33: IV4 open. 

Friday, March 08, 2024, 10:18: Vacuum @ 2.43e-07T. Halted auto-ramping. Increase. Auto-ramping TGHT / TBHT @ 2 A per min to 580 / 290 A.

Friday, March 08, 2024, 13:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Friday, March 08, 2024, 15:59: Mass & wire scans complete. Appear the anode PS is likely positive. Auto-cooling @ 2 A per min.  

Friday, March 08, 2024, 16:04: HV off. Gases closed. 


Monday, March 11, 2024, 23:09: Auto-ramping TGHT / TBHT to 580 / 290 A @ 1 A per min. 


Tuesday, March 12, 2024, 09:45: Gas on.

Tuesday, March 12, 2024, 09:51: BIAS / EE / EZL @ 30 / -1.5 / 13

Tuesday, March 12, 2024, 10:36: Anode @ 100 V. Coil @ 20 A.

Tuesday, March 12, 2024, 11:19: Mass & Wire scans complete.

Tuesday, March 12, 2024, 13:51: EE at -2.5. mass scan

 Tuesday, March 12, 2024, 13:55: EE at -1.5. Coil at 0A. mass scan

Tuesday, March 12, 2024, 14:11: Coil at 20A, TSH:ANODE at  0V. mass scan 

Tuesday, March 12, 2024, 14:30: coil and anode on. gas turned off. 

Tuesday, March 12, 2024, 16:59: decreasing bias 

Tuesday, March 12, 2024, 17:07 decreasing TBHT TGHT to 0, 1A/s 

Attachment 1: Stock_SiC_Elog_996_HP-FEBIAD_Cathode_BM_-_HV_&_Coil.docx
Attachment 2: HP-FEBIAD_Elog_996_-_Ramp_up_&_mass_scans.docx
Attachment 3: Stock_SiC_Elog_996_HP-FEBIAD_Cathode_BIAS_mode_-_2.docx
  1002   Tuesday, April 09, 2024, 16:01 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online use

Tuesday, April 09, 2024, 15:25: Roughing.


Wednesday, April 10, 2024, 05:41: TP1B on. 

Wednesday, April 10, 2024, 05:47: TP1A on. 

Wednesday, April 10, 2024, 06:01: IG1 on. 

Wednesday, April 10, 2024, 12:21: Waterline FS#5 open. Vacuum stable @ 1.23e-06T.

Wednesday, April 10, 2024, 12:25: Power / sources on.

Wednesday, April 10, 2024, 12:32: TGHT / TBHT @ 5/5A tapped up & back down manually. Ok.

Wednesday, April 10, 2024, 12:33: Anode @ 25 V, Coil @ 10 A. Tapped up & down manually. Ok.

Wednesday, April 10, 2024, 12:35: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Tapped up & down manually. Ok.

Wednesday, April 10, 2024, 12:37: Vacuum @ 1.19e-06T. Ok, but will allow to drop further.


Thursday, April 11, 2024, 10:21: Gas lines open.

Thursday, April 11, 2024, 10:34: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 11, 2024, 10:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, April 11, 2024, 10:41: Significant sparking for about 5 seconds. BIAS / EE / EZL @ 43 / -2.0 / 19 kV.

Thursday, April 11, 2024, 10:42: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.

Thursday, April 11, 2024, 10:46: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV. Sparking again. On the spark gap.

Thursday, April 11, 2024, 10:56: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.

Thursday, April 11, 2024, 11:26: 30 minutes @ 50 kV. 2 sparks in that time. The second spark tripped the optics & IG6. They were reset.

Thursday, April 11, 2024, 11:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 11, 2024, 11:38: HV tapped to 0 kV.

Thursday, April 11, 2024, 11:39: Vacuum @ 8.27e-07T.

Thursday, April 11, 2024, 13:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 8.16e-07T.

Thursday, April 11, 2024, 13:26: Coil @ 80 A. Tapped up manually at 4 A per min approx.

Thursday, April 11, 2024, 13:28: Vacuum @ 1.01e-06T

Thursday, April 11, 2024, 13:57: Vacuum @ 2.96e-06T

Thursday, April 11, 2024, 14:19: Coil @ 0 A.

Thursday, April 11, 2024, 14:21: Anode @ 100 V.

Thursday, April 11, 2024, 14:22: Anode @ 200 V.

Thursday, April 11, 2024, 14:24: Anode @ 500 V.

Thursday, April 11, 2024, 14:28: Anode @ 0 V.

Thursday, April 11, 2024, 14:32: HV to 0 kV.


Friday, April 12, 2024, 06:30: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Friday, April 12, 2024, 13:23: Auto-ramping aborted. TGHT @ 556 A, Vacuum @  4.94e-06T. Allow 20 min for stabilization.

Friday, April 12, 2024, 13:44: Auto-ramping TGHT to 580 A @ 2 A per min. Vacuum @ 4.57e-06T. 

Friday, April 12, 2024, 14:15: Aborted auto-ramp. Vacuum @ 5.20e-06T. Will manually tap up. 

Friday, April 12, 2024, 14:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 5.31e-06T. The extraction electrode is acting up. Doubling the voltage on what is input. Add 50 V on the slider, 100 V will go to the readback. 

Friday, April 12, 2024, 14:49: HV back to 0 kV. 

Friday, April 12, 2024, 15:12: EE Troubleshooting. Cage open & multiple tests to adjust the voltage.

Friday, April 12, 2024, 15:19: Auto-cooling @ -2 A per min 

Attachment 1: EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx
Attachment 2: 2024_-_ITW-_TM4_LP_FEBIAD.docx
  1004   Wednesday, April 17, 2024, 14:16 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online use - Run 2

https://elog.triumf.ca/TIS/Test-Stand/1003

EE Issue resolved. TS closed up.

Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.

Wednesday, April 17, 2024, 14:12: TGHT / TBHT manually tapped up to 5 / 5 A.

Wednesday, April 17, 2024, 14:13: BIAS / EE / EZL @ 2.5 / -1.0 / 1.0 kV. Ok.

Wednesday, April 17, 2024, 14:15: Anode to 100 V. Ok. Coil PS is still.

Wednesday, April 17, 2024, 14:19: Rear cage reopened. Coil PS on. Coil @ 5 A. Ok. Gas on in the morning.

Wednesday, April 17, 2024, 14:21: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. Coil back to 0 A.


Thursday, April 18, 2024, 05:57: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Thursday, April 18, 2024, 08:26: Gas lines purged & reopened full of Ar.

Thursday, April 18, 2024, 08:39: Optics set with common tune.

Thursday, April 18, 2024, 08:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 18, 2024, 08:50: Begin mass & wire scans w/o Anode & Coil

Thursday, April 18, 2024, 08:55: MB1 appears to be tripped & out of sync.

Thursday, April 18, 2024, 08:57: Switched MB1 PS off, controller off. Restart them. PS on, then controller. Reset on epics & Can Diagnostics TMS:HallMB1 (cfg)

Thursday, April 18, 2024, 08:59: MB1 ready. Continue testing / mass scan.

Thursday, April 18, 2024, 09:37: Anode to 100 V. Coil to 20 A.

Thursday, April 18, 2024, 10:15: Set optics to Dave's previous tune.

Thursday, April 18, 2024, 10:49: Primary mass & wire scans set complete.

Thursday, April 18, 2024, 11:01: Anode & Coil to 0. Scanning w/ Dave's previous tune.

Thursday, April 18, 2024, 11:52: BIAS / EE / EZL to 0 kV. Gas lines closed. IV4 closed.

Thursday, April 18, 2024, 11:53: Begin auto-cooling @ 2 A per min.


Friday, April 19, 2024, 06:56: Power off. IG1 off. TP1B & TP1A off.  

Friday, April 19, 2024, 09:03:   VV1 open -  venting 

Attachment 1: 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx
  1005   Friday, April 19, 2024, 11:33 Dave Neilson-LP-FEBIAD  44692-442972-10In progressDevelopment target test - Calibrated leak - Anode mode

 Friday, April 19, 2024, 11:32:   assembly installed in test stand.  VV1 closed, pumping down

Friday, April 19, 2024, 11:56:   TP1A and TP1B on. 

Friday, April 19, 2024, 12:34:   water cooling on. no effect on vacuum.

Friday, April 19, 2024, 12:34:  Argon gas set to 0.5 bar. No effect on vacuum.

Monday, April 22, 2024, 09:24  beginning TGHT TBHT ramp to 440A/290A at 1A/30s.    COIL increased to 80A for conditioning. vacuum monitored.

Monday, April 22, 2024, 09:47:   vacuum peaks at ~8e-7 T.

Monday, April 22, 2024, 10:49  vacuum recovered and stable at  4.2e-7 T. 

Monday, April 22, 2024, 10:49  TGHT TBHT ramp rate toward 440/290 increased to 1.4A/10s.  COIL increased to 90A for conditioning. vacuum continues to be closely monitored.

 Monday, April 22, 2024, 11:39  TGHT TBHT have reached 440/290.  Waiting for vacuum to drop to stable value. Currently at 1.12e-6 T.

 Monday, April 22, 2024, 13:10:    vacuum stable at 9.9e-7 T

Monday, April 22, 2024, 13:11   increasing bias to 30kV 

Monday, April 22, 2024, 14:30   Unintentionally, TBHT had been increased to 230 instead of 290. Increasing to 290. 

Monday, April 22, 2024, 14:40.  BIAS sparking. Decreasing bias and increasing COIL back to 90A to condition. (spark frequency approximately 1/min)

 Monday, April 22, 2024, 15:12   increasing TGHT TBHT to 490/320 for conditioning   -  monitoring vacuum and bias closely

Monday, April 22, 2024, 15:23   prior to vacuum recovering, bias sparked again. decreasing to 25kV while vacuum recovers. 

 Monday, April 22, 2024, 15:37 vacuum plateaued at 2.5e-6T

 Monday, April 22, 2024, 16:50 Vacuum significantly decreased to ~1.5e-6.  increased bias to 30kV to observe argon beam activity. looks normal. data to be collected tomorrow after vacuum down further. Sparks were still observed at 30kV although significantly less frequently. (1/5min)

 Monday, April 22, 2024, 16:52    decreasing bias to 0 V

 Tuesday, April 23, 2024, 09:24  Vacuum at 9.6e7 T.  decreasing COIL to 0, increasing bias to 30 kV

Tuesday, April 23, 2024, 09:51   BIAS at 30kV, no sparks seen. 

 Tuesday, April 23, 2024, 09:58.  Argon gas on. COIL at 40A, ANODE at 200V. Using short mass scan to find Ar-40 peak. 

Tuesday, April 23, 2024, 10:33:   ran degaussing script in anode mode - measure_id=6018

Tuesday, April 23, 2024, 10:36  COIL set to 80A, ANODE at 340V, BIAS at 29 660 V.  

Tuesday, April 23, 2024, 10:37 mass scan 

 Tuesday, April 23, 2024, 10:57 closed sv4, open sv1. to pump down argon gas lines. then closed sv5 and sv1. 

Tuesday, April 23, 2024, 10:57   mass scan

 Tuesday, April 23, 2024, 11:19   TGHT TBHT decreased to 440 290

Tuesday, April 23, 2024, 11:35  mass scan

Tuesday, April 23, 2024, 11:49    turned argon gas back on

Tuesday, April 23, 2024, 11:50    mass scan 

Tuesday, April 23, 2024, 12:13     decreasing bias to 0 V

Tuesday, April 23, 2024, 12:33   decreasing TGHT TBHT to 100A at 1.4A/10s 

 Tuesday, April 23, 2024, 13:29   decreasing TGHT TBHT to 0A at 1A/30s

 Tuesday, April 23, 2024, 14:13   increasing bias to test HV

Tuesday, April 23, 2024, 15:00   when bias was at ~50kV, epics shut down at the test stand computer. Internet disconnected. there were two sparks over ~10min at 50kV, but there was no spark at the same time as the epics shut down

Tuesday, April 23, 2024, 15:05  It appears that this also actuated BV1B and BV6, then turning off TP1B and TP6 turbo pumps.

Tuesday, April 23, 2024, 15:16:  continuing to increase HV remotely, while monitoring closely for any sparks. the HV appears to be stable. 

Tuesday, April 23, 2024, 15:20  at 54.6 kV, the bias current rapidly increased from 0.02mA to 0.135mA. There was no decrease in voltage and no accompanying spark. HV was decreased until current dropped, before increasing HV again.

Tuesday, April 23, 2024, 16:01  decreased bias to 0V. 

Tuesday, April 23, 2024, 16:01   Turbo pumps restarted. 

 Wednesday, April 24, 2024, 09:25    TP1B and TP1A off. winding down to begin venting

 Wednesday, April 24, 2024, 10:47    VV1 open. venting.

  1007   Friday, April 26, 2024, 13:49 Aaron SchmidtTiC#7HP-FEBIADITWTM445447-545235-15In progressConditioning TiC#7

FM-SW calibrated leak installed.

Friday, April 26, 2024, 13:48: Roughing.

Friday, April 26, 2024, 14:20: TP1B started.

Friday, April 26, 2024, 14:26: TP1B Green. OK.

Friday, April 26, 2024, 14:30: TP1A on.


Monday, April 29, 2024, 08:44: Vacuum @ 4.58e-07T. Waterline FS#5 open. Vacuum ok.

Monday, April 29, 2024, 08:50: Power / sources on. Tap up check. TGHT / TBHT to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 100 V. Coil to 4 A. Ok. Tap back down.

Monday, April 29, 2024, 10:44: IV4 open.

-BB:

Monday, April 29, 2024, 11:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, April 29, 2024, 11:12: BIAS / EE / EZL @ 40 / -1.8 -2.0 / 17 kV.

Monday, April 29, 2024, 11:19: BIAS / EE / EZL @ 43 / -2.0 / 19 kV.

Monday, April 29, 2024, 11:23: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.

Monday, April 29, 2024, 11:27: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV.

Monday, April 29, 2024, 11:33: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.

Monday, April 29, 2024, 12:05: 30 minutes @ 50 kV. 3 sparks at the very end. 2 inside and 1 outside.

Monday, April 29, 2024, 12:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 4.67e-07T. Start tapping up coil.

Monday, April 29, 2024, 12:32: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.2e-07T

Monday, April 29, 2024, 14:00: Vacuum @ 7.20e-07T (30-60 min depending on whether the out gassing levels or begins to decrease)

Monday, April 29, 2024, 14:02: Coil @ 0 A.

Monday, April 29, 2024, 14:05: Anode @ 100 V.

Monday, April 29, 2024, 14:07: Anode @ 200 V.

Monday, April 29, 2024, 14:09: Anode @ 500 V.

Monday, April 29, 2024, 14:11: Anode @ 0 V.

Monday, April 29, 2024, 14:33: HV @ 0 V.

Monday, April 29, 2024, 14:34: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per minute.


Tuesday, April 30, 2024, 07:18: Auto-ramping TGHT / TBHT to 580 / 290 @ 2A per minute. 

Tuesday, April 30, 2024, 13:44: Gas lines purged & refilled with Ar.

Tuesday, April 30, 2024, 13:48: optics set.

Tuesday, April 30, 2024, 13:51: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, April 30, 2024, 13:56: Anode @ 100 V. Coil @ 20 A

Tuesday, April 30, 2024, 13:59: Reset / Cfg MB1

Tuesday, April 30, 2024, 14:40: Initial mass & wire scans complete.

Tuesday, April 30, 2024, 15:07:  Argon gas lines purged. 

Tuesday, April 30, 2024, 15:07:  Mass scan repeated.

Tuesday, April 30, 2024, 15:42:   Gas on. Magnet set to 40.1 mass/charge. Anode & coil vs fc6 output optimization scan started. 0-90A coil and 0-400V anode.

Tuesday, April 30, 2024, 15:55:   Vacuum is noticeably rising. If it reaches 5e-6T, will terminate the scan.

Tuesday, April 30, 2024, 15:59:  rate of increase appears to be slowing and reaching a plateau.

Tuesday, April 30, 2024, 16:01:    optimization data at measure_id=6058.  image at bottom.

Tuesday, April 30, 2024, 16:03: COIL and anode set to 0. decreasing BIAS/EZL/EE to 0V

Tuesday, April 30, 2024, 16:12: decreasing TGHT TBHT at 1A/30s to 0

 Wednesday, May 01, 2024, 09:38:   TP1B and TP1A turned off, winding down

 Wednesday, May 01, 2024, 10:1: VV1 open, venting.  Water cooling off. purged lines

 

 

 

  1008   Thursday, May 02, 2024, 13:45 Dave Neilson-LP-SIS  44691-845235-26In progressMass marker testing

 Wednesday, May 01, 2024, 12:44:  pumped down to rough vacuum, TP1B now on.

Wednesday, May 01, 2024, 12:49:  TP1A on.

Thursday, May 02, 2024, 9:10:  water cooling on. no effect on vacuum

 

Thursday, May 02, 2024, 10:02:  TGHT and TBHT heating to 100A/100A at 1A/30s

Thursday, May 02, 2024, 11:02:  TGHT and TBHT heating to 230A/230A at 1.4A/10s

 Thursday, May 02, 2024, 13:53:  increasing BIAS to 30kV, EE to 2500V, EZL to 13kV

 Thursday, May 02, 2024, 14:11:  increasing  TGHT  to 280A.

 Thursday, May 02, 2024, 14:18  seeing a few sparks decreasing BIAS temporarily

Thursday, May 02, 2024, 14:25 sparks continued. decreased TGHT to 260A and saw them subside. increasing bias again.

 Thursday, May 02, 2024, 14:42 conducting mass scan - 2024-05-02-15-05 mm LPSIS a.txt

 Thursday, May 02, 2024, 15:09   increased COIL to 20A. mass scan repeated.  2024-05-02-15-37 mm LPSIS b.txt

Thursday, May 02, 2024, 15:38 decreasing TGHT to 230A, COIL at 0A

Thursday, May 02, 2024, 15:43:   repeating mass scan. 2024-05-02-16-09 mm LPSIS c.txt   * no signal. very unexpected.

Thursday, May 02, 2024, 16:10:  increased COIL to 20A, repeating mass scan.  2024-05-02-16-35 mm LPSIS d.txt

Thursday, May 02, 2024, 16:35   decreasing BIAS, EE, EZL to 0V

Thursday, May 02, 2024, 16:50 increasing TGHT to 290A at 1A/30s, to be left hot overnight.

 Friday, May 03, 2024, 10:26 increasing BIAS to 30kV, EE to 2500V, EZL to 13kV

Friday, May 03, 2024, 10:50  conducting mass scan, COIL at 0A  - 2024-05-03-11-19 mm LPSIS e.txt
 
Friday, May 03, 2024, 11:19  increasing COIL to  20A. repeating mass scan   - 2024-05-03-11-47 mm LPSIS f.txt

 Friday, May 03, 2024, 11:47 increasing COIL to  40A. repeating mass scan     -   2024-05-03-12-21 mm LPSIS g.txt

 Friday, May 03, 2024, 12:22  decreasing TGHT to 260A.    

 Friday, May 03, 2024, 12:32 mass scan:   - 2024-05-03-12-59 mm LPSIS g.txt     <- accidentally labeled g. cannot change

Friday, May 03, 2024, 13:01   decreased COIL to 20A.   mass scan:  2024-05-03-13-30 mm LPSIS i.txt

Friday, May 03, 2024, 13:31  decreased COIL to 0A. mass scan:   2024-05-03-13-59 mm LPSIS j.txt

 Friday, May 03, 2024, 14:01  reducing TGHT to 230A.  mass scan:  2024-05-03-14-37 mm LPSIS k.txt

Friday, May 03, 2024, 14:38   increasing coil to 20A.    mass scan:   2024-05-03-15-14 mm LPSIS l.txt

Friday, May 03, 2024, 15:15   increasing coil to 40A. mass scan:     2024-05-03-15-42 mm LPSIS m.txt

Friday, May 03, 2024, 15:43  COIL -> 0A. decreasing EE EZL BIAS to 0V.

Friday, May 03, 2024, 15:59   decreasing TGHT and TBHT to 0A at 1A/30s

 

 

 

 

 

  1009   Friday, May 17, 2024, 17:24 Brady BorrmannUC#LP-FEBIADITE 44692-445235-18In progressConditioning Spare Development Target

Friday, May 17, 2024, Spare FEBIAD Development target installed

Friday, May 17, 2024, 17:00: Roughing

Friday, May 17, 2024, 17:38:  TP1B started.

Friday, May 17, 2024, 17:43 TP1B Green. OK.

Friday, May 17, 2024, 17:46 : TP1A on.

Friday, May 17, 2024, 17:54 : TP1A Green. OK.

 Tuesday, May 21, 2024, 09:47 :   TP1A and TP1B switched off. Source tray calibrated leak to be removed.

 Tuesday, May 21, 2024, 10:13 :   VV1 open for venting to atmospheric pressure.

Tuesday, May 21, 2024, 11:26 :  Source tray calibrated leak removed, target calibrated leak connected to gas line. Chamber closed, roughing valves open. Roughing down.

 Tuesday, May 21, 2024, 12:02  TP1B on

Tuesday, May 21, 2024, 12:04: TP1A on. 

 Tuesday, May 21, 2024, 15:12  gradually raising BIAS/EL/EE voltages to 50kV/25kV/2kV.

Tuesday, May 21, 2024, 15:58  increasing BIAS to 50+kV, watching for sparks.

Tuesday, May 21, 2024, 16:38: voltage stable at 55kV. after 10 minutes, of high voltage with no sparks, dropping the voltages to 0V.

Wednesday, May 22, 2024, 11:36:  increasing voltage BIAS/EL/EE to 30kV/15kV/1.5kV.

Wednesday, May 22, 2024, 11:56 gradually increasing COIL to 80A, letting vacuum recover as necessary. 

Wednesday, May 22, 2024, 13:31:  COIL to 90A, recovering vacuum.

 Wednesday, May 22, 2024, 16:58 increasing TGHT TBHT to 440A/290A at 1A/30s. reducing COIL to 0A and voltages to 0V overnight

Thursday, May 23, 2024, 11:14 :  increasing voltage BIAS/EL/EE to 30kV/13kV/1.5kV.

Thursday, May 23, 2024, 11:33:  Sensor on beam line vacuum TMSIG6 not working. reports bad vacuum, despite both TMSTP6 TMSTP2 running at full speed. Likely that vacuum is at appropriate level.

Thursday, May 23, 2024, 11:35: turning on optics and confirming correct tune.  --- cannot do this due to interlock on TP6.  investigating problem. -- switched to filament 2 on control panel

Thursday, May 23, 2024, 13:14:  after setting magnet to argon-40, running degaussing script for coil / anode optimization  - measure_id= 6220.  heat map at bottom. . optimal point at 120V 40A (local maximum)

Thursday, May 23, 2024, 13:45:  allowing vacuum to recover after scan. vacuum during scan was approximately 4e-6 T

Thursday, May 23, 2024, 13:57 running mass scan with gas on -  2024-05-23-14-25 LP FEBIAD backup leak 1.txt

Thursday, May 23, 2024, 14:29 mass scan gas off (purged) - 2024-05-23-15-03 LP FEBIAD backup leak 2.txt

Thursday, May 23, 2024, 15:04   increasing tght tbht to 490A 320A 

Thursday, May 23, 2024, 15:26:  when at TGHT TBHT = 461A/313A, the anode power supply began current limiting (shorted to hvc)

Thursday, May 23, 2024, 15:28  cooling to 460A/310A

Thursday, May 23, 2024, 15:35  cooling to 450A/300A 

 Thursday, May 23, 2024, 15:44  stopped cooling at 455A/305A as the anode became UNshorted.

Thursday, May 23, 2024, 16:19  mass scan with gas off - 2024-05-23-16-18 LP FEBIAD backup leak 3.txt

Thursday, May 23, 2024, 16:21   gas on - mass scan -  2024-05-23-16-51 LP FEBIAD backup leak 4.txt

Thursday, May 23, 2024, 16:52 :  increasing TGHT TBHT again to test anode shorting threshold:  - shorted at: 458A/308A.  then decreased to 450A/300A, did not UNshort until after a few minutes at that current.  shorted when increased to 456/306

Thursday, May 23, 2024, 17:22   decreasing voltages to 0V

 Thursday, May 23, 2024, 11:14 :  increasing voltage BIAS/EL/EE to 30kV/13kV/1.5kV.

 Tuesday, May 28, 2024, 12:59  cooling target to 0A. will remove target to attempt fix on anode short.

 Tuesday, May 28, 2024, 17:17   TGHT TBHT at 0A. TP1A and TP1B off.

 

 

 

 

  1010   Thursday, May 30, 2024, 16:00 Aaron Schmidt LP-FEBIAD  44692-445235-18In progressConditioning spare FEBIAD

Anode short repaired (Should be :) )

Thursday, May 30, 2024, 15:56: Roughing.

Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down.

Bypassed IG1. TGHT / TBHT @ 5 A. Ok.

Anode to 100 V. Ok.

Thursday, May 30, 2024, 16:12: TGHT / TBHT / Anode to 0. Bypass removed.

Thursday, May 30, 2024, 16:26: TP1B on.

Thursday, May 30, 2024, 16:33: TP1A on.

Thursday, May 30, 2024, 16:41: IG1 on.


Friday, May 31, 2024, 08:50: Anode to 400 V. OK. Tapped back down. Vacuum @ 5.07e-07T 

Friday, May 31, 2024, 09:12   increasing TGHT TBHT to 440 230A at 1A/30s- dn

 Friday, May 31, 2024, 10:20  at ~130A, increased heating rate to 1.4A/10s - dn

 Friday, May 31, 2024, 11:22  anode increased to 200V, TGHT TBHT at 440 230A.  increasing TBHT to 290A

Friday, May 31, 2024, 11:38  ANODE shorted to hvc at TBHT=286A

Friday, May 31, 2024, 11:39  decreased TBHT to 285A. waiting to reestablish ANODE voltage.

Friday, May 31, 2024, 11:48 decreased TBHT to 280A, waiting to reestablish ANODE voltage. 

 Friday, May 31, 2024, 12:59 decreased TBHT to 275A, waiting to reestablish ANODE voltage.  

Friday, May 31, 2024, 12:09 decreased TBHT to 270A, waiting to reestablish ANODE voltage.  ---> recovered after 2 min at 270

Friday, May 31, 2024, 14:09 decreased TGHT TBHT to 0 for target removal monday.

Monday, June 03, 2024, 09:04 TP1A TP1B off. Waiting 30min for turbo pumps to slow, prior to venting to atmosphere.

 Monday, June 03, 2024, 10:07 venting. VV1 open. - target subsequently removed for testing possible shorting fix

Friday, June 14, 2024, 16:37:  Ceramic spacer placed between the anode and plasma electrode.

Target returned to test stand. Rough vacuum on.

Monday, June 17, 2024, 09:34:  TP1A on, TP1B on.

 Monday, June 17, 2024, 16:54  increasing tght tbht to 440 230 A at 1A/30s

 Tuesday, June 18, 2024, 14:14 Increasing ANODE to 100V .    Voltage holding.  Increasing TBHT to 290A, watching anode voltage for possible temperature induced short.

 Tuesday, June 18, 2024, 14:54   ANODE shorted at TBHT = 290A.   cooling TBHT to reestablish ANODE OL.

Tuesday, June 18, 2024, 15:04 ANODE OL reestablished at TBHT = 283A

Tuesday, June 18, 2024, 15:05  Increasing TBHT again. 1A/2min

Tuesday, June 18, 2024, 15:32 ANODE shorted again when TBHT reached 290A

Tuesday, June 18, 2024, 15:32   cooling tght tbht. ANODE OL reestablished at TBHT 275A

Tuesday, June 18, 2024, 15:42 reheating to 440A 290A with ANODE at zero, to see if there is a difference compared to heating with ANODE ON/OFF

 Tuesday, June 18, 2024, 15:55  confirmed shorted when hot. cooling to zero. 1A/30s

 

 

  1011   Wednesday, June 19, 2024, 15:50 Brady BorrmannTiC#9HP-SIS  45447-2945235-19In progressConditioning TiC#9

Wednesday, June19, 2024, Spare TiC HP-SIS target installed. TiC#24C

Wednesday, June19, 2024, 15:00: Roughing

Wednesday, June19, 2024, 17:25:  TP1B started.

Wednesday, June 19, 2024, 15:30:  TP1B Green. OK.

Wednesday, June 19, 2024, 15:30 : TP1A on.

Wednesday, June 19, 2024, 15:40: Time out on TP1A

Wednesday, June 19, 2024, 15:43: Turn on BV1A & TP1A

Wednesday, June 19, 2024, 15:43 : TP1A Green. OK.

Wednesday, June 19, 2024, 15:44: IG1 turned on @ 3.92e-05 T

_________   dave neilson

 Thursday, June 20, 2024, 10:23: Water cooling valves opened. no effect on vacuum.    

Thursday, June 20, 2024, 11:19: Power on. Increasing TGHT TBHT to 440A 290A at 1A/30s

Thursday, June 20, 2024, 15:59  increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV.

Thursday, June 20, 2024, 16:21   slowly increasing BIAS to test for high voltage sparking  --- sparked at 33.6kV, sparked at 34kV. 34.6kV, 37.8kV sparking infrequent (period >5min)

Thursday, June 20, 2024, 17:18  decreasing high voltages  to 0

Thursday, June 20, 2024, 17:36  decreased TGHT to 300A overnight.

Friday, June 21, 2024, 09:16 Increasing TGHT to 580A (1A/30s) for testing

 Friday, June 21, 2024, 12:28  increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV.

 Friday, June 21, 2024, 16:31  decreasing BIAS / EE / EZL to 0

Tuesday, June 25, 2024, 10:05 : TP1A TP1B off. preparing to vent chamber for target replacement.


Wednesday, July 10, 2024, 12:22: Venting - AS

Wednesday, July 10, 2024, 14:57: Roughing.

 

Attachment 1: 2024-06-21_HPTiC-24C_target_characterization.docx
  1016   Wednesday, July 31, 2024, 18:50 Aaron SchmidtTiC SpareHP-FEBIADITWTM445447-242752-7In progressConditioning Spare for TiC#7

Wednesday, July 31, 2024, 18:47: Roughing.

Wednesday, July 31, 2024, 19:24: TP1B on.

Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T.

Wednesday, July 31, 2024, 19:33: TP1A Started. CG1A @ 0.164T.

Wednesday, July 31, 2024, 19:41: TP1A at speed. Whining a bit, but it's alive.

Wednesday, July 31, 2024, 19:42: IG1 on.


Thursday, August 01, 2024, 08:00: Vacuum @ 3.14e-0T. Waterline FS#5 open. Vacuum ok. CG1A @ 0.028T.

Thursday, August 01, 2024, 08:04: IV4 open.

Thursday, August 01, 2024, 08:09: Cage closed up. PS / Sources on. Note* TGHT/TBHT breakers were on. Anode was off. All "On" now.

Thursday, August 01, 2024, 08:13: Manual tap up checks. TGHT / TBHT @ 5 / 5 A. Anode @ 100 V / 15.873 mA. Coil PS acting up. Set to 7 A, displays 9.87A & fluctuates.

Thursday, August 01, 2024, 08:19: Anode to 0 V. Coil reduced to 0 A, however still reads back 4.15 A on epics. PS @ 0A.

Thursday, August 01, 2024, 08:24: Cage open. HV sources off. Coil back to 7A. Epics shows 9.82-10.11A (Blue). Fluctuates, PS direct reading @ 7A - Steady.

Thursday, August 01, 2024, 08:39: Cage closed up. HV sources back on.

Thursday, August 01, 2024, 08:40: BIAS / EE / EZL set to 1 / -0.5 / 1 kV. Anode to 100 V / 15.873 mA. Coil remains @ 7A. Epics 10.35A (Blue) Fluctuates still. PS direct reading @ 7A.

Thursday, August 01, 2024, 08:49: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, August 01, 2024, 08:54: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.

Thursday, August 01, 2024, 08:56: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, August 01, 2024, 08:57: 1 Spark. External - Audible.

Thursday, August 01, 2024, 09:01: Anode @ 200 V / 17.094 mA. Vacuum @ 2.75e-06T.

Thursday, August 01, 2024, 09:04: Anode @ 300 V / 18.315 mA.

Thursday, August 01, 2024, 09:05: Anode @ 400 V / 19.536 mA.

Thursday, August 01, 2024, 09:05: Anode @ 500 V / 20.757 mA. Interesting, the coil epics read back (Blue) moved to 6.98 (7) A.The coil read back stability appears to have occurred in conjunction with the 8:57am spark*.

Thursday, August 01, 2024, 09:17: 20 min stable. Can assume the spark was the coil instability discharging. Coil remain stable reading @ 7A. BIAS / EE / EZL @ 40 / -2.0 / 17 kV (20 min). Anode @ 500 V / 19.536 mA. (10 min+).

Thursday, August 01, 2024, 09:29: BIAS / EE / EZL to 0 kV. Anode to 0.

Thursday, August 01, 2024, 09:36: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 @ per min.

Thursday, August 01, 2024, 09:37: Tap up coil to 10 A. Stable. Read back on all ends match up.

Thursday, August 01, 2024, 09:39: Coil @ 20 A. Stable. Hold. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:05: Coil @ 30 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:13: Coil @ 40 A. Vacuum @ 2.68e-06T.

Thursday, August 01, 2024, 10:18: Coil @ 50 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:24: Coil @ 60 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:27: Coil @ 70 A. Vacuum @ 2.77e-06T.

Thursday, August 01, 2024, 10:32: Coil @ 80 A. Vacuum @ 3.03e-06T. Note* Coil was cleaned prior to installation & acrylic within dissolved. Successful run on coil.

Thursday, August 01, 2024, 10:43: Coil to 0 A. However in the last 20 A, the read back & epics did not match again. Slowly discharging on epics, although the PS read back was accurate.

Thursday, August 01, 2024, 13:29 FBP:  Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min . IG1:3.56e-6.

Thursday, August 01, 2024, 16:00: AS - Aborted target ramping. TGHT / TBHT @ 448 / 248 A. Vacuum limited at 5.0e-06T. Allow to out gas. Continue tomorrow am.


Friday, August 02, 2024, 06:01: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. Vacuum: 1.60e-06T.

Friday, August 02, 2024, 08:28 turning on HV

Friday, August 02, 2024, 08:35 BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No issues.

Friday, August 02, 2024, 08:40 Same kind of sparks as the previous thin foil Ta observed

Friday, August 02, 2024, 08:49 Bias lowered to 20kV

Friday, August 02, 2024, 10:39 HV issues could not be identified, we recorded some sparks from within the target near the multipin and TBHT. Outgassing coil and running mass scan. Source tray to be thoroughly checked after retrieving the target. 

Friday, August 02, 2024, 15:04  gradually increased COIL current to 100A over time while monitoring vacuum to ensure no heater trips. Vacuum now at 2.4e-6 T

Friday, August 02, 2024, 15:05 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV 

Friday, August 02, 2024, 15:26   now at  BIAS / EE / EZL to 30 / -1.5 / 13 kV  --- first spark at 30kV. 

Friday, August 02, 2024, 15:37   sparking occurring at 4-5min intervals. set anode to 120V, coil to 40A. finding Ar peak via scan.   Argon operated at 0.5 bar.

Friday, August 02, 2024, 15:57   Ar peak located at 95.5332A. on magnet. tested gas on / off to confirm - current at FC6 = 1.37 nA

Friday, August 02, 2024, 16:02  ran febiad coil/anode scan. 

Friday, August 02, 2024, 16:33  data at test number = 7462 can be further visualized using the shared jupyter notebook code.  data taken at anode voltage 260V was disrupted due to a spark derailing a number of optics elements in the beamline. they were soon corrected, but this data was missed.

 Friday, August 02, 2024, 16:34   -   mass scan with  180V 70A      (Argon ON) ---- doesn't seem to be recording background noise well. ie the common background recording artifact is present. records constant numbers instead of numbers in range (1e-13,5e-12). often appears in mass scan image at slants 

Friday, August 02, 2024, 17:07    -   mass scan rerun after switching off argon and pumping down the lines. however, only run from mass 49 down, as the signal above was completely blank

Friday, August 02, 2024, 17:25  ramping down bias ee and ezl

 Friday, August 02, 2024, 17:45  decreasing TGHT and TBHT to 0a at 1A/30s

 

 

 

 

  1018   Friday, August 09, 2024, 21:08 Ferran Boix PamiesTa#67 Thin foils LP-SISITETM445447-14 45235-10In progressTa#67 thin foil retesting

Friday, August 09, 2024, 21:07 Insulators, retainer and Re foil have been replaced, source cup machined so the ion source does not short against it. Venting TS now.

Friday, August 09, 2024, 22:17 Roughing.

Friday, August 09, 2024, 22:35: TP1B on. - AS

Friday, August 09, 2024, 22:42: TP1A on. - AS.

Friday, August 09, 2024, 22:50: Both TP at speed. 2.65e-05T Vacuum. FS#5 open.

Friday, August 09, 2024, 22:52: PS on. - AS.


AS:

Saturday, August 10, 2024, 07:02: TGHT / TBHT @ 26 / 5 A. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT tapped back down to 5 A. 

Saturday, August 10, 2024, 07:05: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Saturday, August 10, 2024, 07:27: Halt ramping @ 45 / 45 A. Set auto-ramping TGHT / TBHT to 500 / 230 @ 2 A per min. Optics are set.

Saturday, August 10, 2024, 09:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 321 / 230 & still ramping. One spark on tap up.

Saturday, August 10, 2024, 10:02: Small peaks on RPM0A & RPM0B. No signal on FC0. One spark*.

Saturday, August 10, 2024, 10:07: Spark* 

Saturday, August 10, 2024, 10:11: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT / TBHT @ 344 / 230 & still ramping.

Saturday, August 10, 2024, 11:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV 

Saturday, August 10, 2024, 11:38: 1 spark* 

Saturday, August 10, 2024, 11:40: TGHT / TBHT @ 500 / 230 A. FC0 & wire scans produced signals / peaks. 

Saturday, August 10, 2024, 11:45: Starting mass scan. 

Saturday, August 10, 2024, 12:17: Mass scan taken. Wire scans on Mass 27 taken. Signals noted on mass 40 & 138 approx. Also of note. One large spark. Steerers reset. Signal on TGHT current.

https://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2024_07_26_Ta_67_thinfoil_1st_massscan.txt

Saturday, August 10, 2024, 12:21: Begin HV Check.

Saturday, August 10, 2024, 12:24: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.

Saturday, August 10, 2024, 12:28: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Saturday, August 10, 2024, 12:44: Began sparking after 40. Brought back down 

Saturday, August 10, 2024, 12:56: HV @ 0 kV. 

Saturday, August 10, 2024, 13:05: BIAS / EE / EZL @ 30 / -1.5 / 13 kV 

Saturday, August 10, 2024, 13:07: BIAS / EE / EZL @ 35 / -1.8 / 15 kV 

Saturday, August 10, 2024, 13:10: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Saturday, August 10, 2024, 13:24: Spark* reset optics. 

Saturday, August 10, 2024, 13:44: BIAS / EE / EZL @ 30 / -1.5 / 13 kV  

Saturday, August 10, 2024, 14:03: HV to 0 kV. 

Saturday, August 10, 2024, 14:12: Begin Auto-cooling @ 2 A per min. 


Monday, August 12, 2024, 05:43: Sources Off. IV4 Closed.

Monday, August 12, 2024, 05:45: IG1 & Chamber TP off. 

Monday, August 12, 2024, 07:46: TS Computer rebooted. IV4 reset. PS off. Venting.

Attachment 1: ITE-TM4-Ta#67-LP-SIS_Thin_Foil.docx
  1026   Tuesday, October 29, 2024, 18:25 Aaron SchmidtUC#46 (assembly only)LP-IG-LISITWTM4 42972-6 / 39956-1In progressConditioning UC#46 Assembly

 42972-6 Base / 39956-1 Lid

Tuesday, October 29, 2024, 18:20: Roughing. 

Tuesday, October 29, 2024, 18:52: TP1B on. 

Tuesday, October 29, 2024, 18:58: TP1A on.

Tuesday, October 29, 2024, 19:06: IG1 on.


Wednesday, October 30, 2024, 07:23: Vacuum @ 8.25e-07T. Waterline FS#5 open.

Wednesday, October 30, 2024, 07:25: Power on.

Wednesday, October 30, 2024, 07:32: PS for TGHT keeps timing out? Goes red. Won't start. 

Tapped up TBHT to 10 A. TGHT?

Wednesday, October 30, 2024, 08:20: Manually cycled the PS. No longer trips.

Tapped up TGHT to 5 A. OK

Wednesday, October 30, 2024, 08:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, October 30, 2024, 14:32: Auto-cooling @ 2 A per min.

 


Thursday, October 31, 2024, 08:30: TP/ IG1 off. 

Thursday, October 31, 2024, 12:52: Venting. 

  1027   Thursday, October 31, 2024, 13:53 Aaron Schmidt      In progressChamber empty & Fix IG6

 Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.


Monday, November 04, 2024, 11:40: Vent beamline. 

Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.

Monday, November 04, 2024, 13:51: TMS:TP2 on. 

Monday, November 04, 2024, 13:57: TMS:TP6 on. TMS:IG6 on.


Tuesday, November 05, 2024, 15:00: Venting Chamber

Tuesday, November 05, 2024, 15:19: IG6 still displaying issues. Contacted Edi, 

Tuesday, November 05, 2024, 15:35: Controller replaced. Switch to Filament 2. IG6 on. Reading 3.73e-07T. 


Wednesday, November 13, 2024, 09:16: IG6 is tripped again. 

Wednesday, November 13, 2024, 09:17: Reset & switched back to Filament 2. There is no filament 1. Reading 3.91e-07T.

  1028   Tuesday, November 05, 2024, 16:40 Brady BorrmannUC #24D (Assembly only)LP-IG-LIS   44972-5 / 42972-9In progressConditioning UC#24D Assembly

42972-5 Base / 42972-9 Lid

Tuesday, November 05, 2024, 16:30: Roughing. 

Tuesday, November 05, 2024, 17:04: TP1B on.

Tuesday, November 05, 2024, 17:13: TP1A on.

Tuesday, November 05, 2024, 17:21: IG1 on @ 2.41e-05T 


Wednesday, November 06, 2024, 10:35: Vacuum @ 5.75e-07T. Waterline FS#5 open. 

Wednesday, November 06, 2024, 16:24: TGHT/TBHT ramping to 580/230A at 2A/min

 


Thursday, November 07, 2024, 09:16:  Increasing BIAS/EE/EZL to 30/2.5/13 kV slowly

Thursday, November 07, 2024, 11:26:  as expected, no beam out to FC0. slowly increasing to bias to 45kV alongside ezl to 28kV

Thursday, November 07, 2024, 11:27:   TGHT dropped out for 1s. Did not register a trip or anything. simply jumped down to 0A and immediately recovered.

Thursday, November 07, 2024, 14:40:   At 45kV, there were no sparks noticed. The target assembly was brought down to 0V and ramped down to 0A/0A at -2A/min  


Wednesday, November 13, 2024, 09:15: PS Off. TP off - AS. 

Wednesday, November 13, 2024, 11:26: VV1 opened - BB. 

  1029   Wednesday, November 13, 2024, 14:36 Aaron SchmidtUC#(47) - Not includedLP-SISITETM344691-845235-24In progressConditioning UC#47 (Assembly only)

Gas line is attached. 

Wednesday, November 13, 2024, 14:18: Roughing.

Wednesday, November 13, 2024, 18:20: Closed backing valves. Vacuum @ 2.140 T? 


Thursday, November 14, 2024, 06:23: Venting manually.  

Thursday, November 14, 2024, 06:50: Left line slightly un-seated. Swapped out waterline gaskets. Close. Roughing.

Thursday, November 14, 2024, 07:22: TP1B on. 

Thursday, November 14, 2024, 07:33: Backing pressure below 0.100T. TP1A on. 

Thursday, November 14, 2024, 07:43: TP1A Tripped. Backing pressure @ 0.067T.

Thursday, November 14, 2024, 07:47: TP1B off to bring backing pressure below 0.050T. 

Thursday, November 14, 2024, 07:56: Re-opened & Restarted TP1B

Thursday, November 14, 2024, 08:38: Re-closed. Will have to allow TP to spin down before opening the vent valve to give the interlock a reset. (We should remove that or have a bypass in the future)

Thursday, November 14, 2024, 08:46: Coordinated opening BV1A & BV1B simultaneously from 2 computers to bypass the interlock. Success. TP1B. On & green. TP1A started.  

Thursday, November 14, 2024, 08:52: TP1A at speed (Green) Teamwork makes the dream work!!! IG1 on.

Thursday, November 14, 2024, 13:41: Vacuum @ 1.10e-06T. Waterline FS#5 open. Vacuum ok.

Thursday, November 14, 2024, 13:43: Power / Sources on. 

Thursday, November 14, 2024, 13:46: Checks. TGHT / TBHT to 5/5A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. OK. Tap back down. Allow vacuum to drop further. Ready for operation. 

Thursday, November 14, 2024, 13:48: Open IV4. Timed out. Tighten sensor. Reset. Open IV4. 


Friday, November 15, 2024, 05:25: Vacuum @ 4.23e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. 

Friday, November 15, 2024, 09:01: Vacuum @ 6.01e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Friday, November 15, 2024, 11:46: Optics on. 

Friday, November 15, 2024, 11:54: TGHT tripped completely off & was unable to restart while turning up the HV. Was at 580 A. BIAS / EE / EZL was tapped up to near 27.5 / -1.5 / 13 kV.

Friday, November 15, 2024, 12:05: Verified nothing appears to have burnt up or similar. Unable to begin auto-cooling on TBHT as it requires both heater PS to operate. Will tap down TBHT manually. TGHT is set @ 0A.

Friday, November 15, 2024, 12:11: TBHT tapped down to 0A. 

Friday, November 15, 2024, 12:14: Once at 0 A, the TGHT PS status turned from red to black??? Was able to reset & turn it back on. Brought it up to 5 A. That's different. 

Friday, November 15, 2024, 12:23: Sources PS off. Will re-ramp on Monday.


Monday, November 18, 2024, 07:24: Vacuum @ 2.43e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min. 

Monday, November 18, 2024, 09:17: Vacuum @ 2.69e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Monday, November 18, 2024, 13:02: Sources / Optics On.

Monday, November 18, 2024, 13:08: BIAS / EE / EZL to 20 / -1.5 / 13 kV.

Monday, November 18, 2024, 13:10: BIAS / EE / EZL to 27 / -1.5 / 13 kV. 

Monday, November 18, 2024, 13:20: TGHT Shut off again during a mass scan!

Monday, November 18, 2024, 13:22: Restarted TGHT. This is problematic. TGHT @ 580A. 

Monday, November 18, 2024, 13:25: Redo mass scan. 

Monday, November 18, 2024, 13:59: Mass / wire scans complete. HV to 0 kV. 

Monday, November 18, 2024, 14:00: Auto-cooling @ 2 A per min.


Tuesday, November 19, 2024, 10:04: IV4 closed

Tuesday, November 19, 2024, 10:06: Sources off.

Tuesday, November 19, 2024, 10:07: IG1 & TP off. 

Tuesday, November 19, 2024, 11:16: Power off / lockout. FS#5 purged. Venting. 

Attachment 1: UC#47_empty_conditioning_test_1_-_Failed.docx
Attachment 2: UC#47_empty_conditioning_test_2.docx