Thursday, November 16, 2023, 09:43, Aaron Schmidt, , LP-SIS, , , , , In progress, Thermal tests
|
Aurelia has been testing on the ISAC TS since last week. Thermocouples are installed in the end cap, left side & the ionizer.
No elog was initiated, but much has happened.
Site wide power outage on Friday/Saturday caused problems. The TS was running at that time & was also affected. Reboots occurred on the weekend |
Monday, November 27, 2023, 16:09, Ferran Boix Pamies, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, November 27, 2023, 16:09 Roughing
Monday, November 27, 2023, 17:22 Both turbos are on, leaving vacuum over night.
Tuesday, November 28, 2023, 09:28 after pumping over night IG1 is at .15e-6 T. Water cooling on. |
Thursday, January 18, 2024, 10:49, Aaron Schmidt, , LP-SIS, , , 44139-2, 45235-22, In progress, Conditioning UCx HS
|
Straight/closed TGHT tube oven installed. SIS Assembly.
Thursday, January 18, 2024, 10:32: Roughing.
Thursday, January 18, 2024, 10:57: TP1B on. |
Monday, January 22, 2024, 13:55, Aaron Schmidt, , LP-SIS, , , 45447-19, 45235-22, In progress, Conditioning UCx HS - 2
|
Conditioning HS for UCx. LP-SIS oven / end caps installed
Monday, January 22, 2024, 13:53: Roughing.
Monday, January 22, 2024, 14:21: TP1B On. |
Tuesday, February 06, 2024, 11:48, Aaron Schmidt, SiC# (Stock), HP-SIS, , , 41369-2, 45235-14, In progress, Conditioning (Stock SiC-24C) SiC HP-SIS
|
Tuesday, February 06, 2024, 11:45: Roughing.
Tuesday, February 06, 2024, 13:27: TP1B on.
Tuesday, February 06, 2024, 13:33: TP1A on. |
Friday, February 16, 2024, 10:30, Aaron Schmidt, SiC# (Stock), HP-FEBIAD, , , 45447-4, 45235-21, In progress, Conditioning stock SiC HP FEBIAD
|
Friday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38: TP1B on.
Friday, February 16, 2024, 17:47: TP1A on. |
Tuesday, April 09, 2024, 16:01, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use
|
Tuesday, April 09, 2024, 15:25: Roughing.
Wednesday, April 10, 2024, 05:41: TP1B on.
Wednesday, April 10, 2024, 05:47: TP1A on. |
Wednesday, April 17, 2024, 14:16, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use - Run 2
|
https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T. |
Friday, April 19, 2024, 11:33, Dave Neilson, -, LP-FEBIAD, , , 44692-4, 42972-10, In progress, Development target test - Calibrated leak - Anode mode
|
Friday, April 19, 2024, 11:32: assembly installed in test stand. VV1 closed, pumping down
Friday, April 19, 2024, 11:56: TP1A and TP1B on.
Friday, April 19, 2024, 12:34: water cooling on. no effect on vacuum. |
Friday, April 26, 2024, 13:49, Aaron Schmidt, TiC#7, HP-FEBIAD, ITW, TM4, 45447-5, 45235-15, In progress, Conditioning TiC#7
|
FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B started. |
Thursday, May 02, 2024, 13:45, Dave Neilson, -, LP-SIS, , , 44691-8, 45235-26, In progress, Mass marker testing
|
Wednesday, May 01, 2024, 12:44: pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: TP1A on.
Thursday, May 02, 2024, 9:10: water cooling on. no effect on vacuum |
Friday, May 17, 2024, 17:24, Brady Borrmann, UC#, LP-FEBIAD, ITE, , 44692-4, 45235-18, In progress, Conditioning Spare Development Target
|
Friday, May 17, 2024, Spare FEBIAD Development target installed
Friday, May 17, 2024, 17:00: Roughing
Friday, May 17, 2024, 17:38: TP1B started. |
Thursday, May 30, 2024, 16:00, Aaron Schmidt, , LP-FEBIAD, , , 44692-4, 45235-18, In progress, Conditioning spare FEBIAD
|
Anode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down. |
Wednesday, June 19, 2024, 15:50, Brady Borrmann, TiC#9, HP-SIS, , , 45447-29, 45235-19, In progress, Conditioning TiC#9
|
Wednesday, June19, 2024, Spare TiC HP-SIS target installed. TiC#24C
Wednesday, June19, 2024, 15:00: Roughing
Wednesday, June19, 2024, 17:25: TP1B started. |
Wednesday, July 31, 2024, 18:50, Aaron Schmidt, TiC Spare, HP-FEBIAD, ITW, TM4, 45447-2, 42752-7, In progress, Conditioning Spare for TiC#7
|
Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24: TP1B on.
Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T. |
Friday, August 09, 2024, 21:08, Ferran Boix Pamies, Ta#67 Thin foils , LP-SIS, ITE, TM4, 45447-14 , 45235-10, In progress, Ta#67 thin foil retesting
|
Friday, August 09, 2024, 21:07 Insulators, retainer and Re foil have been replaced, source cup machined so the ion source does not short against it.
Venting TS now.
Friday, August 09, 2024, 22:17 Roughing. |
Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly
|
42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20: Roughing.
Tuesday, October 29, 2024, 18:52: TP1B on. |
Thursday, October 31, 2024, 13:53, Aaron Schmidt, , , , , , , In progress, Chamber empty & Fix IG6
|
Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, 11:40: Vent beamline.
Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section. |
Tuesday, November 05, 2024, 16:40, Brady Borrmann, UC #24D (Assembly only), LP-IG-LIS, , , , 44972-5 / 42972-9, In progress, Conditioning UC#24D Assembly
|
42972-5 Base / 42972-9 Lid
Tuesday, November 05, 2024, 16:30: Roughing.
Tuesday, November 05, 2024, 17:04: TP1B on. |
Wednesday, November 13, 2024, 14:36, Aaron Schmidt, UC#(47) - Not included, LP-SIS, ITE, TM3, 44691-8, 45235-24, In progress, Conditioning UC#47 (Assembly only)
|
Gas line is attached.
Wednesday, November 13, 2024, 14:18: Roughing.
Wednesday, November 13, 2024, 18:20: Closed backing valves. Vacuum @ 2.140 T? |
|