906
|
Friday, November 12, 2021, 13:01 |
Aaron Schmidt | Ta#63 | LP-SIS | ITE | TM4 | 44691-11 | 44378-12 | In progress | Conditioning Ta#63 | Friday, November 12, 2021, 13:01: BV1B
open. Roughing.
Friday, November 12, 2021, 13:05: |
|
|
908
|
Tuesday, December 21, 2021, 13:34 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-6 | In progress | Salts test HS & Holiday Shutdown | LP-SIS modified w/ 2 holes on the center
block to accept a pair of Ta tubes that are
run to the coil PS. |
|
|
923
|
Thursday, May 05, 2022, 14:43 |
Aaron Schmidt | | P2N-SIS | | | 45241-1 | 45240-1 | In progress | P2N assembly conditioning. | Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper |
|
|
924
|
Monday, May 09, 2022, 10:08 |
Luca Egoriti | | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Beginning of May:
The cabling on the top of the test
stand was changed to adapt for P2N testing. |
|
|
925
|
Tuesday, May 10, 2022, 10:09 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 45241-1 | 45240-1 | In progress | P2N assembly conditioning - 2 | Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed |
|
|
927
|
Thursday, May 12, 2022, 10:50 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | In progress | P2N assembly conditioning - 4 | PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing. |
|
|
928
|
Wednesday, May 25, 2022, 15:48 |
Aaron Schmidt | SiC#42 | HP-FEBIAD | ITW | TM2 | 44692-9 | 44378-5 | In progress | Conditioning SiC#42 | Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B
on. |
|
|
930
|
Tuesday, May 31, 2022, 13:35 |
Aaron Schmidt | UCx HS | | ITW | TM2 | | 44378-19 | In progress | Conditioning UC#38 assembly | Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B |
|
|
931
|
Wednesday, June 08, 2022, 10:01 |
Aaron Schmidt | Ta#64 | LP-SIS | ITE | TM4 | 44691-12 | 44378-13 | In progress | Conditioning Ta#64 & HV Test. | Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33:
Roughing. |
7x |
|
932
|
Saturday, June 18, 2022, 10:04 |
Aaron Schmidt | SiC#43 | HP-FEBIAD | ITW | TM2 | 42464-1 | 44378-16 | In progress | Conditioning SiC#43 | Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data |
|
|
934
|
Thursday, June 23, 2022, 11:00 |
Aaron Schmidt | SiC#44 | HP-FEBIAD | ITE | TM4 | 37978-1 | 44378-24 | In progress | Conditioning SiC#44 | Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A
open. |
|
|
936
|
Thursday, July 07, 2022, 16:52 |
Aaron Schmidt | | LP-IG-LIS | ITW | TM2 | | 42132-3 | In progress | Conditioning UC#39 assembly | No UCx target installed. Straight / blank
oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing. |
|
|
938
|
Monday, July 11, 2022, 09:17 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Monday, July 11, 2022, 09:15: Roughing. |
|
|
939
|
Tuesday, August 30, 2022, 13:58 |
Aaron Schmidt | | | | | 44062-7 | 44378-25 | In progress | Conditioning UC#40 assembly | Conditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only). |
|
|
940
|
Tuesday, September 27, 2022, 07:55 |
Aaron Schmidt | C#4 | LP-SIS | ITE | TM4 | 44691-3 | 44378-23 | In progress | Conditioning C#4 w/ thermocouples | Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X |
|
|
941
|
Thursday, September 29, 2022, 13:50 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Water loop installed.
Thursday, September 29, 2022, 13:50:
Roughing |
|
|
942
|
Tuesday, October 18, 2022, 13:25 |
Aaron Schmidt | C#5 | LP-SIS | | | 45235-5 | 44691-13 | In progress | Conditioning C#5 | Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open |
|
|
944
|
Tuesday, November 15, 2022, 11:24 |
Aaron Schmidt | UC#41 assembly | LP-SIS | ITE | TM4 | 45220-8 | 45235-4 | In progress | Conditioning UC#41 assembly | LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00: |
|
|
947
|
Wednesday, November 23, 2022, 13:52 |
Aaron Schmidt | | | | | | 44378-14 | In progress | FEBIAD Coil Tests | Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 |
|
|
949
|
Tuesday, December 06, 2022, 11:20 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Tests | Thermocouples installed:
O - O
O - Anode |
|
|