Friday, November 12, 2021, 13:01, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, 44378-12, In progress, Conditioning Ta#63
|
Friday, November 12, 2021, 13:01: BV1B open. Roughing.
Friday, November 12, 2021, 13:05: BV1A open.
Friday, November 12, 2021, 13:34: TP1B on. |
Tuesday, December 21, 2021, 13:34, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-6, In progress, Salts test HS & Holiday Shutdown
|
LP-SIS modified w/ 2 holes on the center block to accept a pair of Ta tubes that are run to the coil PS.
*Note modified HS plates at the ion source to accommodate the LP-SIS (Has a slightly bent ionizer tube from the drilling)
-Plan to shut down the ISAC TS on 12/23/2021 for the holidays. |
Thursday, May 05, 2022, 14:43, Aaron Schmidt, , P2N-SIS, , , 45241-1, 45240-1, In progress, P2N assembly conditioning.
|
Thursday, May 05, 2022, 14:43: Roughing. Open BV1B
Thursday, May 05, 2022, 14:46: Upper chamber cage closed. The rest remains open. Open BV1A.
Thursday, May 05, 2022, 15:20: TP1B up to speed. |
Monday, May 09, 2022, 10:08, Luca Egoriti, , P2N-SIS, ITE, TM4, , , In progress, P2N heating test
|
Beginning of May:
The cabling on the top of the test stand was changed to adapt for P2N testing. The TGHT and COIL PS were disconnected, and their DC cable terminals
were connected instead to the TDK-LAMBDA P2Nheaters. The configuration on top of the ITS module is the following: |
Tuesday, May 10, 2022, 10:09, Aaron Schmidt, , P2N-SIS, ITE, TM4, 45241-1, 45240-1, In progress, P2N assembly conditioning - 2
|
Ref: https://elog.triumf.ca/TIS/Test-Stand/924. During testing, it was noted one leg was glowing vs the other. P2N assembly was removed & inspected.
No contact or defects were found.
Tuesday, May 10, 2022, 10:05: Roughing. |
Thursday, May 12, 2022, 10:50, Aaron Schmidt, , P2N-SIS, ITE, TM4, 44812-2, 45240-1, In progress, P2N assembly conditioning - 4
|
PE shimmed & extended 1mm due to likely ion source contact.
Thursday, May 12, 2022, 10:41: Roughing.
Thursday, May 12, 2022, 11:26: TP1B on. |
Wednesday, May 25, 2022, 15:48, Aaron Schmidt, SiC#42, HP-FEBIAD, ITW, TM2, 44692-9, 44378-5, In progress, Conditioning SiC#42
|
Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on. |
Tuesday, May 31, 2022, 13:35, Aaron Schmidt, UCx HS, , ITW, TM2, , 44378-19, In progress, Conditioning UC#38 assembly
|
Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B on. |
Wednesday, June 08, 2022, 10:01, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, 44378-13, In progress, Conditioning Ta#64 & HV Test. 7x
|
Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33: Roughing.
Wednesday, June 08, 2022, 10:07: TP1B on. |
Saturday, June 18, 2022, 10:04, Aaron Schmidt, SiC#43, HP-FEBIAD, ITW, TM2, 42464-1, 44378-16, In progress, Conditioning SiC#43
|
Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on. |
Thursday, June 23, 2022, 11:00, Aaron Schmidt, SiC#44, HP-FEBIAD, ITE, TM4, 37978-1, 44378-24, In progress, Conditioning SiC#44
|
Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on |
Thursday, July 07, 2022, 16:52, Aaron Schmidt, , LP-IG-LIS, ITW, TM2, , 42132-3, In progress, Conditioning UC#39 assembly
|
No UCx target installed. Straight / blank oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
Thursday, July 07, 2022, 16:53: BV1A Open. |
Monday, July 11, 2022, 09:17, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Monday, July 11, 2022, 09:15: Roughing. |
Tuesday, August 30, 2022, 13:58, Aaron Schmidt, , , , , 44062-7, 44378-25, In progress, Conditioning UC#40 assembly
|
Conditioning the UC#40 LP-SIS assembly & ISAC TS main vacuum chamber. Straight / round oven in use (TGHT only).
Tuesday, August 30, 2022, 13:55: BV1B open. Roughing.
Tuesday, August 30, 2022, 14:00: BV1A open. |
Tuesday, September 27, 2022, 07:55, Aaron Schmidt, C#4, LP-SIS, ITE, TM4, 44691-3, 44378-23, In progress, Conditioning C#4 w/ thermocouples
|
Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X |
Thursday, September 29, 2022, 13:50, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Water loop installed.
Thursday, September 29, 2022, 13:50: Roughing
Tuesday, October 18, 2022, 11:17: Venting |
Tuesday, October 18, 2022, 13:25, Aaron Schmidt, C#5, LP-SIS, , , 45235-5, 44691-13, In progress, Conditioning C#5
|
Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28: BV1A open
Wednesday, October 19, 2022, 12:14: TP1B on. |
Tuesday, November 15, 2022, 11:24, Aaron Schmidt, UC#41 assembly, LP-SIS, ITE, TM4, 45220-8, 45235-4, In progress, Conditioning UC#41 assembly
|
LP-SIS 45220-8 is empty & for testing only.
Tuesday, November 15, 2022, 11:00: Roughing.
Tuesday, November 15, 2022, 11:21: BV1A open. |
Wednesday, November 23, 2022, 13:52, Aaron Schmidt, , , , , , 44378-14, In progress, FEBIAD Coil Tests
|
Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 FS#5 on (HS bypassed with a water loop) |
Tuesday, December 06, 2022, 11:20, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Tests
|
Thermocouples installed:
O - O
O - Anode |
|