358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
360
|
Thursday, May 23, 2013, 14:08 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Turbo Pumps on | The turbo pumps have been turned
on and are running |
|
362
|
Monday, May 27, 2013, 10:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Pumps Started HV testing to follow | The pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily. |
|
364
|
Monday, May 27, 2013, 11:55 |
chad fisher | South Hot-Cell | Standard Operation | | | Special Tooling for RFQ target | The special tool made for the RFQ target
autopsy has been inserted into the hot cell.
|
|
367
|
Monday, May 27, 2013, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | HV conditioning | The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once |
|
368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
369
|
Tuesday, May 28, 2013, 10:37 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well. |
|
370
|
Tuesday, May 28, 2013, 10:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check | Results of the electrical check on
TM#4 with Ta#40, it passed. See attached
PDF for results. |
|
371
|
Wednesday, May 29, 2013, 06:32 |
David Wang | ITE | Standard Operation | TM4 | Ta#40 | TM4 has been connected in ITE. | TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday. |
|
373
|
Friday, May 31, 2013, 11:19 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#28 (RFQ Target) | Spent target move | Spent target SiC#28 (RFQ Target) has been
moved from the south hot to the storage vault.
The target was placed in pail #105 in spot |
|
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE | Dan an I transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam. |
|
376
|
Tuesday, June 11, 2013, 10:05 |
David Wang | ITW | Standard Operation | TM1 | | Disconnected TM1 in ITW. | Dan and I disconnected TM1 in ITW. |
|
377
|
Wednesday, June 12, 2013, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | | | spent source tray removal | The spent source tray for TM#3 has been
removed from the south hot cell and well
be placed in the the hot cell ante room. |
|
382
|
Thursday, June 20, 2013, 13:47 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | Ten targets have been assayed or had field
measurements(they were too hot to ship but
were assayed the last time an assay was done) |
|
384
|
Tuesday, June 25, 2013, 13:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#6 | Electrical check | Results from the electrical check of TM#1
with the UC#6 target. See attached PDF. |
|
385
|
Tuesday, June 25, 2013, 14:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#6 | module move | Module moves of TM#1 with Ta#39 from ITW
to SHC then TM#1 with UCx#6 from SHC to the
conditioning station moves went well. |
|
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started | The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo |
|
387
|
Wednesday, June 26, 2013, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 UCx target heat shield | Chad and I leak checked the TM1 UCx target
heat shield at SHC. No leak has been found
so far. |
|
388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved | Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
|
389
|
Thursday, June 27, 2013, 14:23 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 Autopsy performed | An autopsy of Ta#39 was performed yesterday
and today. Ta#39 will be sent to the spent