ID Date Author Category Typedown Module Target/Number Subject Text Attachments
  30   Wednesday, September 28, 2011, 11:59 Travis CaveSouth Hot-CellStandard OperationTM4no targetTM#4 moved from South Hot Cell to to North East Silo.TM#4 moved from South Hot Cell to to North
East Silo, move went well.
  
  31   Thursday, September 29, 2011, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#36Spent target moveThe spent Ta#36 has been moved to the storage
vault. It was placed in pail #90, and placed
into slot 3B, it was 111mSv/hr upon removal
  
  32   Monday, October 03, 2011, 11:00 Travis CaveITWStandard OperationTM1UCx#2Move from west station to south hot cellTM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well.
  
  33   Monday, October 03, 2011, 11:54 chad fisherSouth Hot-CellStandard OperationTM1UCx#2 - TaC#1Target change UCx#2-TaC#1UCx#2 has been removed from Tm1 and put
in a bucket with a slow argon feed and a
lid placed lossely on top.
  
  34   Monday, October 03, 2011, 14:52 Travis CaveSouth Hot-CellStandard OperationTM1TaC#1Electrical checkTM#1 with TaC#1 installed passed the electrical
test. With a value of 882MOhms that was meggered
from the heat shield to the chassis, all
  
  35   Tuesday, October 04, 2011, 14:13 Travis CaveITWStandard OperationTM1TaC#1Move ot TM#1Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station.
  
  36   Wednesday, October 05, 2011, 09:41 Travis CaveSpent Target VaultStandard Operation UCx#2Spent target moveThe spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal
  
  37   Tuesday, October 25, 2011, 08:47 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredElectrical checkTM#4 with SiC#26 HP has been checked electrically
it has passed. It was noted that the Megger
check of the Oven to Chassis (earth ground)
  
  38   Tuesday, October 25, 2011, 11:58 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP has been moved from
the south hot cell to the conditioning station.
  
  39   Tuesday, October 25, 2011, 16:57 Bevan MossConditioning StationStandard OperationTM4 Turbo Pump 1 issuesRoughing on TM1 started at ~15:00 today
by ~16:30 the module had reached a pressure
of ~200 mTorr and the turbo pumps were turned
  
  40   Friday, October 28, 2011, 08:24 Travis CaveConditioning StationStandard OperationTM4SiC#26 High PoweredModule moveTM#4 moved from conditioning station to
south hot cell. For further leak checking.
  
  42   Friday, October 28, 2011, 09:37 chad fisherSouth Hot-CellStandard OperationTM4SiC#26 HP FebiadSiC#26 installed on TM4HP febiad target SiC#26 was installed onto
Tm4 on Monday morning.
"JP's" connector required
  
  43   Friday, October 28, 2011, 14:29 Bevan MossConditioning StationStandard OperationTM4 Leak Check on October 27/10/2011A leak check was performed on the module
on October 27/10/2011 by David Wang and was
reported to Bevan Moss but it never made
  
  45   Monday, October 31, 2011, 08:51 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP moved from the south
hot cell to the conditioning station.
  
  46   Tuesday, November 01, 2011, 11:50 David WangConditioning StationStandard OperationTM4 TM4 leak test on conditioning station I did a leak check again on TM4 today.
This time, the leak detector pump to the
bottom on both base pressure(0.0xE-4 torr)
  
  47   Wednesday, November 02, 2011, 13:12 Bevan MossConditioning StationStandard OperationTM4SiC#26 High PoweredHigh Voltage (HV) testing The silicon carbide targets voltage
was raised to 42 kV today before continuous
current draw was observed. It took roughly
  
  48   Friday, November 04, 2011, 11:12 Travis CaveConditioning StationStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP move from the conditioning
station to the East Target Station, move
went well.
  
  49   Thursday, November 10, 2011, 14:33 Travis CaveSpent Target VaultStandard Operation  Spent Target AssayFor the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows:
  
  50   Monday, November 14, 2011, 14:07 Travis CaveITWStandard OperationTM1TaC#1Module moveTM#1 with TaC#1 from the west target station
to the south hot cell. Move went well.
  
  51   Tuesday, November 15, 2011, 13:08 Travis CaveConditioning StationStandard OperationTM1 Move ot TM#1TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well.
  