Message ID: 382     Entry time: Thursday, June 20, 2013, 13:47
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Spent Target Assay 

Ten targets have been assayed or had field measurements(they were too hot to ship but were assayed the last time an assay was done) done on them  over the past two days. Of those that have been assayed we have total of ten shippable targets. See the attached PDF for the latest details of the storage vault.