Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 364     Entry time: Monday, May 27, 2013, 11:55
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Special Tooling for RFQ target 

The special tool made for the RFQ target autopsy has been inserted into the hot cell.

 

4-40 button head screws have been successfully lossened.

ELOG V2.9.2-2455