Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
374
Entry time:
Tuesday, June 04, 2013, 12:36
Author:
David Wang
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
Subject:
5 shielding blocks are transferred from ITW to ITE
Dan an I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam.
ELOG V2.9.2-2455