Message ID: 373     Entry time: Friday, May 31, 2013, 11:19
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: SiC#28 (RFQ Target) 
Subject: Spent target move 

Spent target SiC#28 (RFQ Target) has been moved from the south hot to the storage vault. The target was placed in pail #105 in spot 2C of  the spent target vault. The target had a field of 24.8mSv/hr at about a meter upon removal from the south hot cell. See attached PDF for the status of the vault. It currently only has six free spots left.