Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 360     Entry time: Thursday, May 23, 2013, 14:08
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta #40 
Subject: Turbo Pumps on 

 The turbo pumps have been turned on and are running

ELOG V2.9.2-2455