Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 387     Entry time: Wednesday, June 26, 2013, 11:03
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number:  
Subject: Leak check on TM1 UCx target heat shield 

Chad and I leak checked the TM1 UCx target heat shield at SHC. No leak has been found so far.

ELOG V2.9.2-2455