Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 385     Entry time: Tuesday, June 25, 2013, 14:24
Author: Travis Cave 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: UC#6 
Subject: module move 

Module moves of TM#1 with Ta#39 from ITW to SHC then TM#1 with UCx#6 from SHC to the conditioning station moves went well.

ELOG V2.9.2-2455