Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 3 of 138  Not logged in ELOG logo
ID Date Author Category Typedown Module Target/Number Subject Text Attachments
  52   Wednesday, November 16, 2011, 07:44 chad fisherSouth Hot-CellStandard OperationTM1TaC#1TaC#1 Removal and inspectionNovember 15, 2011 removed TaC#1 from TM1
and inspected TM1 for any obivous signs of
trouble (Problems with EE at end of run).
  
  53   Wednesday, November 16, 2011, 07:46 chad fisherSouth Hot-CellStandard OperationTM1TaC#1Inspection of TaC#1Inspection of TaC#1 showed that the oven
was indeed broken on the A+ (left oven leg)
side of the central block.
  
  54   Thursday, November 17, 2011, 11:51 Travis CaveSpent Target VaultStandard Operation TaC#1Spent target moveTaC#1 was moved from the south hot cell
to the storage vault. It was placed in pail#92
and put in vault slot 7B. It was 239mSv/hr
  
  55   Thursday, November 17, 2011, 11:52 Travis CaveConditioning StationStandard OperationTM1no targetModule moveTM#1 moved from the conditioning station
to the south hot cell. Move went well.
  
  56   Friday, November 18, 2011, 09:44 Travis CaveSouth Hot-CellStandard OperationTM1UCx#3Electrical checkElectrical checks of TM#1 with UCx#3 have
been completed. They all appear to be with
in operational range. All megger checks were
 ITW_UC#3_Elec_check.PDF 
  57   Friday, November 18, 2011, 09:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 InstallationUCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
  
  58   Friday, November 18, 2011, 11:09 Travis CaveConditioning StationStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 has been moved from the
south hot cell to the conditioning station.
Move went well.
  
  59   Friday, November 18, 2011, 16:29 Bevan MossConditioning StationStandard OperationTM1N/AHigh Voltage (HV) testing TM1 was high voltage tested without
a target on November 16, 2011 with Don Jackson,
Pierre Bricault, and Bevan Moss. The module
 TM1_High_Voltage_Test_Nov_16_2011.JPG 
  60   Monday, November 21, 2011, 13:49 David WangConditioning StationStandard OperationTM1 TM1 full leak check in conditioning stationTM1 full leak check in conditioning station
has been fulfilled this morning.Both air
to vacuum leak check and waterlines helium
  
  61   Tuesday, November 22, 2011, 15:07 Bevan MossConditioning StationStandard OperationTM1UCx #3HV testing High Voltage (HV) testing was completed
on TM1 today. Vacuum was very good 1.9 x
10^-7 T in the service cap, 3.2 x 10^-7 in
 UCx_#3_HV_testing.JPG 
  62   Thursday, November 24, 2011, 10:39 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well.
  
  63   Thursday, November 24, 2011, 10:40 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from the conditioning
station to the west target station.
  
  64   Thursday, December 15, 2011, 13:08 Travis CaveSpent Target VaultStandard Operation  Spent Target AssaySpent target assay completed. A total of
16 target were looked at, 13 were low enough
to be assayed and those 13 are at shippable
 Vault_Storage_December_14_2011.pdf 
  65   Wednesday, January 04, 2012, 13:49 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Well the first of this year's lucky winners
to win a fabulous one way trip to Chalk River
are as follows. UC#1, UC#2, Ta#25, Ta#26,
  
  66   Thursday, January 05, 2012, 11:40 Travis CaveSpent Target VaultStandard Operation  Target swapping Looks like the UC target s #1 and #2 were
found invalidprize winners for their all
inclusive trip to Chalk River and have thus
 Vault_Storage_January_5_2012.pdfMini_Vault_Storage_January_5_2012.pdf 
  69   Thursday, January 12, 2012, 08:43 Travis CaveSpent Target VaultStandard Operation  Spent targets to F-308sAll targets in the mini storage have been
moved to F-308s and those flasks have been
moved over to rad waste. The transfer of
  
  73   Monday, March 12, 2012, 09:19 Travis CaveSouth Hot-CellStandard OperationTM1UCx#3module moveTM#1 with UC#3 was moved from the west
maa to the south hot cell, move went well
  
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 RemovalUC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of
 IMG_0610.JPGIMG_0616.JPG 
  75   Monday, March 12, 2012, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule movedTM#1 has been moved from the south hot
cell to the north east silo, move went well.
  
  76   Tuesday, March 13, 2012, 09:42 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 AutopsyAn autopsy was performed on UCx#3 yesterday
afternoon. This autopsy followed the plan
written by Anders. Indeed, both sides of
  