Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 388     Entry time: Thursday, June 27, 2013, 14:21
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Ucx#6 
Subject: Ucx#6 installed Ta#39? rewmoved 

Ucx#6 was installed on TM1 on Wednesday.

Ta#39 was removed.

ELOG V2.9.2-2455