Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 377     Entry time: Wednesday, June 12, 2013, 10:39
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: spent source tray removal 

The spent source tray for TM#3 has been removed from the south hot cell and well be placed in the the hot cell ante room. To sit till maintenance day to be moved over to the vault storage tunnels.

ELOG V2.9.2-2455