  2562   Thursday, April 11, 2024, 06:27 David WangSouth Hot-CellDevelopmentTM3 TM3 new source tray was transferred into SHC on this Tuesday. TM3 new source tray was transferred into
SHC on this Tuesday. one hook arm of transfer
jig is very close to optic tray tube when
  
  2565   Friday, April 19, 2024, 10:44 David WangSouth Hot-CellDevelopmentTM3 TM3 water lines helium spray leak check at SHC.TM3 water lines helium spray leak check
at SHC is done. No leak has been found on
all lines. seeattachment
 Scanned_from_a_Xerox_Multifunction_Printer_(7).pdf 
  2568   Friday, April 26, 2024, 08:56 David WangConditioning StationDevelopmentTM3 TM3 module top helium spray leak test. TM3 module top helium spray leak test was
done yesterday.  No leak on TM3 module
top @ LD base leak rate 0.0 x E-9 atm.cc/sec.
  
  2569   Friday, April 26, 2024, 08:59 David WangConditioning StationDevelopmentTM3 TM3 helium pressure test and electrical check with new source tray at TCS.TM3 helium pressure test and electrical
check with new source tray at TCS were done
yesterday. The results are excellent. See
 Scanned_from_a_Xerox_Multifunction_Printer_(9).pdf 
  2571   Saturday, April 27, 2024, 09:35 Carla Babcock; Alexander ShkuratoffConditioning StationDevelopmentTM3 TM3 source and service tray testingSaturday, April 27, 2024, 09:35 :
Started ramping up HV, EE and EL
together. First small spark at 20.5kV on
  
  2574   Tuesday, April 30, 2024, 09:20 David WangITWDevelopmentTM4 A new SST gas line is using for ITW febiad gas staion in pit.A new SST gas line with swagelock tube
fittings and VCR fit is using for ITW febiad
gas staion in pit. Gas line is leak checked
  
  2580   Thursday, May 02, 2024, 15:23 David WangSouth Hot-CellDevelopmentTM3 Leak check on TM3 new containment box window line VCR fittings. After new containment box installation
on TM3, Chad and I did a helium spray leak
check on two VCR fittings on front side water
  
  2591   Tuesday, May 14, 2024, 15:27 Carla BabcockITEDevelopmentTM3UCx#44TM3 conditioning and testing in ITETuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV
 Screenshot_from_2024-05-14_10-47-22.png 
  2604   Tuesday, June 04, 2024, 11:44 Carla BabcockSouth Hot-CellDevelopment empty LP FEBIADinvestigation of cathode short on empty LP FEBIADOn May 30 Aaron, Chad and I removed the
empty LP FEBIAD target from the SHC into
the anteroom to attempt to find out the source
 MicrosoftTeams-image_(58).png 
  2615   Monday, June 17, 2024, 17:24 Carla BabcockITEDevelopmentTM3UCx#44Status of gas system prototype in ITEA new gas system for FEBIAD operation was
installed in ITE to enable us to use a calibrated
leak which is attached to the target heat
 schematic_pumpinggaslines_detailed.png 
  2619   Wednesday, June 19, 2024, 08:10 David WangWaste Package/ShipDevelopment   5 gallon spent target pail, spent target lifting long pole and hook assembly load test 5 gallon spent target pail, lifting
long pole and hook assembly load test was
done by Rupan, Keyur ,and David.  Load
  
  2622   Monday, June 24, 2024, 14:37 Carla BabcockSouth Hot-CellDevelopmentTM3UCx#44Inspection of TM3 and UCx#44 after no-protons runTM3 and UCx#44 ran in ITE but issues with
the cyclotron prevented proton beam delivery.
Nonetheless, the target was heated and provided
 MicrosoftTeams-image_(61).pngMicrosoftTeams-image_(62).pngMicrosoftTeams-image_(60).pngMicrosoftTeams-image_(63).png 
  2630   Thursday, July 04, 2024, 01:20 Carla BabcockITEDevelopmentTM3SiC#46TM3 conditioning with protonsInitial Summary:
TM3 sparking behaviour in ITE has
been very disruptive both with and without
  
  2680   Thursday, September 12, 2024, 14:12 Adam NewsomeWaste Package/ShipDevelopment SiC#44Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44)On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails
 Report_on_Inspection_of_Pail_275_on_2024-10-03.pdf 
  2688   Monday, September 23, 2024, 11:31 David WangSouth Hot-CellDevelopmentTM3 10 pins lectrical check result after insulator is installed on water cap C. 10 pins lectrical check result after insulator
is installed on water cap C. 
pin 14 to 60kv bias has 20 Kohm @250V
  