ID Date Author Category Typedown Module Target/Number Subject Text Attachments
  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations
  
  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readingsITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this
  
  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages  David and I cleaned both cages in
ISAC1 electric room, all done.
  
  2754   Monday, January 27, 2025, 08:27 om David WangSouth Hot-CellMaintenance parasite targetTransfer parasite target from SHC to NHC.A parasite target has been transferred
from SHC to NHC. It is a job to reduce SHC
field for coming SHC entry job. The transfer
  
  2762   Monday, February 03, 2025, 13:04 David WangSafe Module ParkingMaintenance  ITW/ITW 24VDC electrical connectors for TP BVs MRO.ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done.  
  
  2777   Monday, February 24, 2025, 11:15 David WangCoolingMaintenance   ITW/ITE water system manual valves water small leak inspection and repairing.  ITW/ITE water system manual valves
water small leak inspection and repairing
job is done. Small water drippings have been
  
  2780   Monday, March 03, 2025, 10:53 David WangITE/ITWMaintenance  ITH:MP1 has been replaced.
    
      
 
            
            No
  
  2781   Monday, March 03, 2025, 15:33 David WangCoolingMaintenance  HALCW resin can loop two filters have been replaced. HALCW resin can loop two filters have been
replaced. no water leak on after job check.
  
  2783   Friday, March 07, 2025, 09:16 David WangCoolingMaintenance  Service of 28 female Parker 1/4 quick connectors in ITW and ITEService of  Parker 1/4 quick connectors
in ITW and ITE have been done.  all
28 female connectors were serviced. o- rings
  
  79   Monday, April 02, 2012, 08:17 David WangConditioning StationDevelopment  conditioning station IMC pump down.I pumped down conditioning station IMC
today. The inside bellow pressure is -20
psi on the gauge.Visually checked the bellow
  
  80   Tuesday, April 03, 2012, 12:11 David WangConditioning StationDevelopment  leak check on conditioning station vacuum systemI did a leak check on conditioning station
vacuum system today.The vacuum system had
been roughed over night . This morning before
  
  83   Thursday, April 12, 2012, 14:40 David WangConditioning StationDevelopmentTM1 conditioning staion and TM1 is under TP1 and TP2 pumping now.TM1 moved to conditioning station to today.
After moving, I connected the vacuum system
which include all gauges ,vacuum lines ,
  
  84   Friday, April 13, 2012, 12:31 David WangConditioning StationDevelopmentTM1 TM1 and conditioning station leak check.
 

 Normal
  0

 
   
  
  129   Wednesday, June 20, 2012, 11:39 Grant MinorSouth Hot-CellDevelopmentTM3N/ATM3 Planned Activites at South Hot Cell Jun 20 to 29 2012

Normal
0




false
false
false
  
  148   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  149   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  195   Tuesday, October 09, 2012, 14:53 Bevan MossConditioning StationDevelopmentTM4UCx#5Module MoveTM4 was remote moved from the SCH to the
TCS today. This was the first time the module
was moved with the framework for the cage
  
  239   Friday, January 18, 2013, 17:01 Grant MinorConditioning StationDevelopmentTM4 Photos of the CS with TM4 (after the no-module HV test, only vacuum connected)Attached are some photos of TM4 in the
Conditioning Station after the no-module
HV test completion.  Only vacuum services
 CS_post_HV_test_w_TM4_18Jan2013_001.jpgCS_post_HV_test_w_TM4_18Jan2013_003.jpgCS_post_HV_test_w_TM4_18Jan2013_004.jpgCS_post_HV_test_w_TM4_18Jan2013_005.jpg 
  241   Monday, January 28, 2013, 12:26 Travis CaveConditioning StationDevelopment  Switches connectedthe switches and the solenoid are all wire
up to 24VDC, when you open either of the
little doors the solenoid switches this is
  
  242   Wednesday, February 06, 2013, 14:34 Bevan MossConditioning StationDevelopmentTM4CS Test Target #140kV All Common w/o Water Test Today the module was biased to 40kV
in the conditioning station. The current
draw was 0uA. Sparking started at 27 kV.
 40kV_no_water_HV_test.JPG 