334
|
Thursday, May 09, 2013, 10:13 |
chad fisher | South Hot-Cell | Development | | | Mock-up Progress | The source tray for the mock-up has been
setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the |
|
372
|
Wednesday, May 29, 2013, 12:07 |
chad fisher | South Hot-Cell | Development | | SiC#28 RFQ | RFQ Autopsy | Major portions of the RFQ target have now
been sucessfully dismantled. More minor dismantling
with conclude this afternoon. |
|
379
|
Thursday, June 13, 2013, 09:21 |
chad fisher | South Hot-Cell | Development | | | Warm Cell Mock-up | the warm cell mock-up has been inserted
into the warm cell and final preparation
for the remote test are being made. |
|
380
|
Tuesday, June 18, 2013, 14:00 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock-up testing / water block connections | The testing of the mock-up and tooling
has commenced.
Source tray mock-up has been driven |
|
381
|
Wednesday, June 19, 2013, 08:15 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock up water block connections | All water block connections on the mock-up
have bben achieved. It is now ready for leak
checking. |
|
383
|
Friday, June 21, 2013, 09:26 |
chad fisher | South Hot-Cell | Development | TM3 | | Mock-up Leak Check Results | The Mock-up has been leak tested after
the remote connection of the water blocks
and is leak tight! |
|
390
|
Thursday, June 27, 2013, 14:27 |
chad fisher | South Hot-Cell | Development | | | Polishing Cleaning tool - Water blocks | The polishing/cleaning tool prototype is
now finished and appers to work great.
Thanks to Dan and Maico for the great |
|
391
|
Tuesday, July 02, 2013, 09:37 |
chad fisher | South Hot-Cell | Development | TM3 | | TM3 Rev.2 Source Tray Disposal | Tm3 Rev.2 source tary has been transfered
to the vault tunnel storage. |
|
401
|
Wednesday, July 17, 2013, 08:29 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS without source tray. | Leak checked TM3 without source tray in
CS this morning. The CS and TM3 vacuum: IG1(top
of the TM3 service cap)4.9x E-7Torr, IG2(diagnostic |
|
402
|
Wednesday, July 17, 2013, 10:10 |
David Wang | Conditioning Station | Development | TM3 | | CS cooling and vacuum system have been turned off | CS water cooling and vacuum system have
been turned off at 10:00 AM this morning.The
TM3 will be disconnected and moved to silo |
|
434
|
Thursday, August 29, 2013, 06:48 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS with new source tray. | A huge leak had been found on HS circuit
during 60 psi helium pressurize test. Other
circuits are free of obvious major leak at |
|
444
|
Friday, September 06, 2013, 16:41 |
Bevan Moss | South Hot-Cell | Development | TM3 | | C-Seal crush investigation | Today Maico completed the new leak
testing tool and blank off. He tested them
with C-seals without springs and all was |
6x |
445
|
Friday, September 06, 2013, 17:50 |
Grant Minor | South Hot-Cell | Development | TM3 | | C-Seal crush investigation |
|
|
449
|
Wednesday, September 11, 2013, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | Started 3 turbo pumps on CS for TM3 | TM3 has been connected in CS.Three turbo-
pumps have been started. The pumping down
is fine so far. |
|
453
|
Friday, September 13, 2013, 07:49 |
David Wang | Conditioning Station | Development | TM3 | | TM3 water lines leak check at CS | I leak checked TM3 water lines at CS with
60 psi and 80psi helium. The base leak rate
is 5.0xe-9 atm.cc/sec. Each circuit 3 minutes |
|
494
|
Sunday, October 06, 2013, 17:08 |
Friedhelm Ames | Conditioning Station | Development | TM3 | NiO#2 | trip of all power supplies | All power supplies tripped on high conductivity
of the cooling water < 5 MOhm, It is not
clear if this was caused by a spark or vice |
|
639
|
Friday, April 04, 2014, 16:59 |
Anders Mjos | ITW | Development | | | Flow meters installed on Heat Shield and Coil water return | David W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected |
|
651
|
Wednesday, April 16, 2014, 10:16 |
Anders Mjos | ITW | Development | TM3 | Ta#42 | Flow meters installed on Heat Shield and Coil water return |
|
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data | Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE |
|
716
|
Monday, July 28, 2014, 14:37 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D)and -(C)water lines. |
TM2 installed in Conditioning
Station
Varian Leak detector
connected directly to Target Module 2 |
7x |