Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2780
Entry time:
Monday, March 03, 2025, 10:53
Author:
David Wang
Category:
ITE/ITW
Type:
Maintenance
Module:
Target/Number:
Subject:
ITH:MP1 has been replaced.
No issues seen on new pump; ITH:CG2 ~0.008T with ITH:CG1 ~0.001T.I am happy with performance. ITH:MP1 turned back off; ITH:PV1 closed and ITH:SV4 closed after the job.
- Chloe Beaumier-Martin
ELOG V2.9.2-2455