Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2783     Entry time: Friday, March 07, 2025, 09:16
Author: David Wang 
Category: Cooling 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Service of 28 female Parker 1/4 quick connectors in ITW and ITE 

Service of  Parker 1/4 quick connectors in ITW and ITE have been done.  all 28 female connectors were serviced. o- rings and valve stem in quick connectors were replaced. the serviced connectors have been installed back to ITW and ITE.  Visually inspected all connectors with flowing through them. No leak, and they function well. 

ELOG V2.9.2-2455