Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2753     Entry time: Wednesday, January 22, 2025, 10:29
Author: Frank Song 
Category: Faraday Cage 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Annual clean up for ITE/ITW Faraday cages  

 David and I cleaned both cages in ISAC1 electric room, all done.

ELOG V2.9.2-2455