Message ID: 83     Entry time: Thursday, April 12, 2012, 14:40
Author: David Wang 
Category: Conditioning Station 
Type: Development 
Module: TM1 
Target/Number:  
Subject: conditioning staion and TM1 is under TP1 and TP2 pumping now. 

TM1 moved to conditioning station to today. After moving, I connected the vacuum system which include all gauges ,vacuum lines , controllers,and fans.I started roughing the station through two turbo pumps(on TM1) . After 2 hours roughing, the station vacuum went to 100 mtorr. I started TP1 and TP2 on TM1 and turned on 3 gauges (png1 on service cap, ig1 on service cap ,and png4 on emittance box) . All  turbo pumps and high vacuum gauges work fine .The pumping down of the station is smooth so far. With only 1 hour turbo pump on all three gauges readings are at low -5 torr range. The fans for cooling the turpump are also turned on. Everything is fine.

ELOG V2.9.2-2455