ID Date Author Category Typedown Module Target/Number Subject Text Attachments
  2541   Monday, February 12, 2024, 18:44 Carla BabcockITWMaintenance  ITW annual HV testingITW was set up for HV testing - water is
running and at a high resistivity due to
injected N. Einzel lens is attached to ground.
 Screenshot_from_2024-02-12_18-44-03.png 
  2547   Friday, February 16, 2024, 11:48 David WangCoolingMaintenance  high active water transferr to holding tank100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding
  
  2548   Friday, February 23, 2024, 06:36 David WangITEMaintenance  ITE entrance module has been disconnected.ITE entrance module has been disconnected
per document 190510. Its a preparation job
for next month module moving out to SHC.
  
  2550   Thursday, March 14, 2024, 14:54 David WangITEMaintenance  ITE entrance module has been moved from ITE pit to TCS. ITE entrance module has been moved from
ITE pit to TCS. The move is smooth.ITE entrance
module top tank flange and o ring slot are
  
  2558   Wednesday, April 03, 2024, 10:48 chad fisherSouth Hot-CellMaintenance  SE Manipulator wrist swapOn April 2, 2024 the wrist on the SE manipulator
of the SHC (Serial # 7986) was swapped with
a rebuild unit originally from SW position
 original_but_incorrect_cable_routing_E-HD_manipulators.JPG 
  2559   Thursday, April 04, 2024, 13:10 David WangCoolingMaintenance  high active water refurbishment, reinstallation, and test operation. both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system
  
  2564   Wednesday, April 17, 2024, 11:58 David WangITE/ITWMaintenance  ITH:MP1S pump inside lubricant was changed today. ITH:MP1S pump inside lubricant was changed
today. old lubricant is dirty with dark color.
they are stored in sealed waste oil jug and
  
  2583   Tuesday, May 07, 2024, 09:47 David WangITE/ITWMaintenanceTM2 Broken TM2:TP2 has been replaced. Broken TM2:TP2 has been replaced otday
by a new TV-1001 nav pump supplied by vacuum
group. replaced pump seris number:201281.
  
  2587   Wednesday, May 08, 2024, 14:01 Frank SongITWMaintenance  Annual clean up for ITW Faraday cage The ITW Faraday Cage has been cleaned,
this is part of Winter Shut Down job happens
in ISAC-1 Electric maintenance room annually.
  
  2617   Tuesday, June 18, 2024, 15:04 Adam NewsomeSpent Target VaultMaintenance   Annual Inspection of Main and Mini Storage Vaults The annual inspection of the main storage
vault will be skipped this year since extensive
inspection and testing was performed during
 PXL_20240618_213819000.jpgPXL_20240618_213905146.jpg 
  2618   Tuesday, June 18, 2024, 15:16 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around  the target hall
was inspected by A. Newsome.  The main tool
 PXL_20240618_213742257.jpgPXL_20240618_213455575.jpgPXL_20240618_213626154.jpg 
  2637   Wednesday, July 10, 2024, 09:55 Adam NewsomeSafe Module ParkingMaintenance   Annual electrical and mechanical inspection of Safe Module Parking An annual electrical and mechanical inspection
was performed on the   SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico
 PXL_20240710_160636341.jpgPXL_20240710_160506424.jpg 
  2638   Wednesday, July 10, 2024, 10:44 Riley SykesSouth Hot-CellMaintenance  Spring idler install New spring idlers were installed
onto rotational chain drive for SHC roof.
Operation ran smoothly in both directions
 Image.jfifImage_(2).jfif 
  2639   Friday, July 12, 2024, 08:51 Riley SykesSafe Module ParkingMaintenance  SMP chain guard SS washers were added to all slotted
holes on SMP chainguard cover plate
  
  2671   Tuesday, August 27, 2024, 13:30 Frank SongITWMaintenanceTM3TiC#8module disconnection TM3 is disconnected and all water
lines are purged/refilled with 50psi Nitrogen.
Pls see pics attached with.
 TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf 
  2673   Thursday, September 05, 2024, 12:50 Adam NewsomeCraneMaintenance  Overhead crane: up/down hoist delayed start issueD. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode.
  
  2682   Monday, September 16, 2024, 08:48 chad fisherManipulator MaintenanceMaintenance  CRL Technicain Manipulator Maitenance TripOver the course of September 9th - September
13, 2024 a CRL manipulator technician carried
out the following manipulator maintenance:
 Triumf_Document_2024-09-20_102936.pdf 
  2692   Wednesday, September 25, 2024, 07:25 David WangCoolingMaintenance  HALCW O2 level sensor maintenance. HALCW O2 level sensor annual maintenance
is done. sensor membrane has been changed
and electrolyte has been refilled. gauge
  
  2693   Wednesday, September 25, 2024, 09:12 David WangSouth Hot-CellMaintenanceTM3 Tm3 has been moved from SHC to silo.Tm3 has been moved  from SHC to silo.
the move is smooth.
  
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - InspectionAn informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main
 ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf 