Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2777     Entry time: Monday, February 24, 2025, 11:15
Author: David Wang 
Category: Cooling 
Type: Maintenance 
Module:  
Target/Number:  
Subject: ITW/ITE water system manual valves water small leak inspection and repairing.  

 ITW/ITE water system manual valves water small leak inspection and repairing job is done. Small water drippings have been found on ITE: manual supply and return(valve stems).  ITW: 2A window supply(valve stem), collimator supply(valve stem),EE return(valve stem), HS supply and return(valve stems), tube heater supply and return(valve stems). all small leaks are repaired. 

ELOG V2.9.2-2455