Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 239     Entry time: Friday, January 18, 2013, 17:01
Author: Grant Minor 
Category: Conditioning Station 
Type: Development 
Module: TM4 
Target/Number:  
Subject: Photos of the CS with TM4 (after the no-module HV test, only vacuum connected) 

Attached are some photos of TM4 in the Conditioning Station after the no-module HV test completion.  Only vacuum services are connected.

Attachment 1: CS_post_HV_test_w_TM4_18Jan2013_001.jpg  2.352 MB  | Show | Hide all
Attachment 2: CS_post_HV_test_w_TM4_18Jan2013_003.jpg  2.776 MB  | Show | Hide all
Attachment 3: CS_post_HV_test_w_TM4_18Jan2013_004.jpg  2.707 MB  | Show | Hide all
Attachment 4: CS_post_HV_test_w_TM4_18Jan2013_005.jpg  2.544 MB  | Show | Hide all
ELOG V2.9.2-2455