Tuesday, December 04, 2012, 14:20, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#5, UCx#5 Removal
Tuesday, December 04, 2012, 13:33, David Wang, ITE, Standard Operation, TM4, UCX#5, Disconnected TM4 in ITE.
Tuesday, December 04, 2012, 13:27, Travis Cave, ITE, Standard Operation, TM4, UCx#5, module move & electrical check
Monday, December 03, 2012, 19:34, Grant Minor, ITE, Standard Operation, TM4, LpUCx, Argon supply opened for ITE vent
Wednesday, November 21, 2012, 09:36, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target move
Wednesday, November 14, 2012, 11:51, Travis Cave, Spent Target Vault, Standard Operation, , , Moving the spent targets to mini storage.
Wednesday, November 14, 2012, 11:04, David Wang, ITE, Repair, TM4, , Change ITE dump water circiut flow wheel
Wednesday, November 14, 2012, 10:57, David Wang, ITW, Standard Operation, TM1, , TM1connected in ITW
Tuesday, November 13, 2012, 10:55, Travis Cave, ITW, Standard Operation, TM1, TiC#3, module move
Friday, November 09, 2012, 14:35, Travis Cave, Spent Target Vault, Standard Operation, , Nb#7, Spent target move
Friday, November 09, 2012, 09:20, Travis Cave, Conditioning Station, Standard Operation, TM1, TiC#3, Electrical check
Thursday, November 08, 2012, 09:37, chad fisher, South Hot-Cell, Standard Operation, TM1, Nb#7, Nb#7 Autopsy
Thursday, November 08, 2012, 08:42, David Wang, Conditioning Station, Standard Operation, TM1, TiC #3, TM1 TiC #3 target heat shield helium pressure check is done.
Wednesday, November 07, 2012, 11:09, David Wang, South Hot-Cell, Standard Operation, TM1, TiC , TM1 heat shield circuit leak check with TiC target at hot cell
Wednesday, November 07, 2012, 10:25, Travis Cave, Conditioning Station, Standard Operation, TM1, TiC#3, module move
Wednesday, November 07, 2012, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM1, TiC#3, Electrical check
Tuesday, November 06, 2012, 14:00, chad fisher, South Hot-Cell, Standard Operation, TM1, TiC#3, TiC#3 Installed
Tuesday, November 06, 2012, 12:08, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1 disconnected in ITW
Tuesday, November 06, 2012, 11:34, chad fisher, South Hot-Cell, Standard Operation, TM1, , Nb#7 Removal
Tuesday, November 06, 2012, 11:06, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move