Entry  Thursday, March 14, 2013, 10:04, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target 1, Cooling Package Started Cooling_system_start.JPGCooling_System_start_3_min.JPG
    Reply  Thursday, March 14, 2013, 11:56, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target 1, Cooling Package Started Cooling_package_1155.JPG
Message ID: 264     Entry time: Thursday, March 14, 2013, 10:04     Reply to this: 266
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: CS Test Target 1 
Subject: Cooling Package Started 

 The cooling package was started at 10:00 today. See attached picture. There is another snap shot at 10:03.

Attachment 1: Cooling_system_start.JPG  108 kB  | Show | Hide all
Attachment 2: Cooling_System_start_3_min.JPG  109 kB  | Show | Hide all