Thursday, March 14, 2013, 10:04, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target 1, Cooling Package Started 
|
Thursday, March 14, 2013, 11:56, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target 1, Cooling Package Started
|
|
Message ID: 266
Entry time: Thursday, March 14, 2013, 11:56
In reply to: 264
|
Author: |
Bevan Moss |
Category: |
Conditioning Station |
Type: |
Standard Operation |
Module: |
TM4 |
Target/Number: |
CS Test Target 1 |
Subject: |
Cooling Package Started |
|
|
Bevan Moss wrote: |
The cooling package was started at 10:00 today. See attached picture. There is another snap shot at 10:03.
|
The conductivity of the cooling package is above 5Mohm which is the minimum limit for the PS. This was achieved at 11:55. See attached picture. |
|