Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
279
Entry time:
Wednesday, March 27, 2013, 10:44
Author:
Travis Cave
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
SiC#28 (RFQ Target)
Subject:
module move
TM#4 with SiC#28 has been moved from the south hot cell to the east target station move went well.
ELOG V2.9.2-2455