Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 265     Entry time: Thursday, March 14, 2013, 11:25
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: CS Test Target #1 
Subject: Turbos Started 

 Turbos started at 11:14. TP1S achieved full speed in less than 2 minutes. TP1 and 2 tripped at 9 minutes. Restarted and reached at speed after another 1 minute 20 seconds.

Attachment 1: turbo_started_1115.JPG  79 kB  | Show | Hide all
Attachment 2: vacuum_running_1124.JPG  75 kB  | Show | Hide all
ELOG V2.9.2-2455