Message ID: 267     Entry time: Monday, March 18, 2013, 12:03
Author: Bevan Moss 
Category: Conditioning Station 
Type: Repair 
Module: TM4 
Target/Number: CS Test Target #1 
Subject: Turbo Pump 1 Failure and Venting 

 Over the weekend Turbo pump one failed. It was attempted to restart the turbo in soft start but that also failed. Although the Vacuum was good enough to operate both Turbos are required to pass commissioning. As such the pumps were turned off at ~10:00 today. Venting started at 12:00.