Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 271     Entry time: Tuesday, March 19, 2013, 13:49
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: CS Test Target #1 
Subject: Tubros Started 

 Turbo Pumps have been started and are in normal operation. TP1 which has recently been replaced was started in soft start and had no issues. TP2 was started normally and tripped prior to reaching speed. It was left for a while and restarted. When restarted it was still at 17KRPM, it reached normal operation.

ELOG V2.9.2-2455