Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 284     Entry time: Wednesday, April 03, 2013, 12:26
Author: David Wang 
Category: ITE 
Type: Maintenance 
Module: TM4 
Target/Number: Sic LIS/RFQ 
Subject: Leak check on ITE TM4. 

TM 4 had been leak check in ITE due to   relatively high PNG1 and IG1 readings.All TM4 primary and secondary  vessel air to vacuum seals had been leak checked. All water lines in TM4 had been helium pressured . There is no leak had been found so far.

ELOG V2.9.2-2455