Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 282     Entry time: Tuesday, April 02, 2013, 10:07
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#39 
Subject: Ta#39 inserted into hot cell 

Ta#39 has been inserted into the hot cell in preparation for TM1 target change.

ELOG V2.9.2-2455